Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 21, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construct ARCENT Parking

Awarded
FA4803-18-B-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 9 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-BID-007
Solicitation # 2026-BID-007
The Police Parking Improvements Project (2026-BID-007) for the City of Moraine, Ohio, involves expanding the parking lot and implementing other site enhancements at the Moraine Municipal Building located at 4200 Dryden Road. The base bid focuses on asphalt and concrete work to expand the parking lot where the existing canopy is located, with an engineer's estimate of $206,000. Additional optional improvements include a wrought iron fence with motorized gates (Alternate 1: $158,500), a dumpster pad and parking relocation (Alternate 2: $21,500), and utility conduits with parking lot lighting (Alternate 3: $54,900). The project is scheduled for a December 10, 2026 award date, with a final completion deadline of June 30, 2027. The contract will be awarded to the bidder offering the lowest and best proposal, based on price, technical compliance, and demonstrated competency via an experience statement. Bidders must submit all proposals electronically via Bid Express by October 22, 2026, including required affidavits, a bid guaranty, and a contract bond. This is a prevailing wage project requiring compliance with Ohio Department of Industrial Relations standards and ADA guidelines for sidewalks and ramps. Work must adhere to ODOT standards for asphalt concrete and ASTM D 1577 for fibers. The contractor is responsible for providing proof of insurance within ten days of the award and must furnish a maintenance bond upon project acceptance.
City of Moraine, OH

POSTED

about 13 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-0016
Solicitation # 2024-0022
The City of Centerville, Ohio, is soliciting bids for the Forest Brook Ditch Repairs project, with an engineer's estimate of 194,000 dollars funded by local sources. The scope of work involves pavement and joint maintenance, including the cleaning and sealing of longitudinal and transverse joints and miscellaneous cracks using Type II hot-applied fiberized joint and crack sealant. Additionally, the project requires the installation of Stress Absorbing Membrane Interlayer (SAMI) and concrete pavement repairs across locations including Ambridge Road, Forest Brook Avenue, and Green Road. The work is specifically focused on the open channel ditch from Clyo Road to the culvert pipe crossing under Forest Brook Boulevard. The project must be completed by October 31, 2027. Bids are due by October 29, 2026, at 3:00 PM and must be submitted via Bid Express. The contract will be awarded to the lowest and best bidder based on pricing, qualifications, experience, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and ethics laws. Required submission documents include a bid form, contract affidavits, a bid bond, and a certificate of liability insurance. Payments will be issued monthly based on the value of work and materials certified by the City Engineer, in accordance with Chapter 153 of the Ohio Revised Code. Contractors are responsible for worker safety and must adhere to ADA compliance for mat installations and Best Management Practices to prevent sediment from entering the storm sewer system.
City of Centerville

POSTED

about 13 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The 20th Contracting Squadron at Shaw Air Force Base, South Carolina, issued solicitation FA4803-18-B-0002 for the construction of an auxiliary asphalt parking lot for ARCENT Building B1957. This HubZone set-aside project is awarded as a single firm-fixed-price contract with an estimated magnitude between $100,000 and $250,000. The scope of work includes the design and construction of 28 parking stalls, concrete curb and gutters, drainage systems, sidewalks, and overhead lighting. The project requires a 180-day period of performance and must adhere to NAICS code 237310 and the specific design and construction standards of Shaw AFB, including compliance with NFPA, ICC, and Unified Facilities Criteria. Contractors are responsible for providing all labor, materials, equipment, and transportation necessary to complete the operations. Technical requirements are supported by detailed geotechnical data, dimensional site drawings, and electrical luminaire schedules. Bidders must be registered in the System for Award Management database and comply with South Carolina highway construction prevailing wage rates. The procurement process utilized sealed bidding procedures under FAR Part 14 and FAR Part 36, with specific mandates for hand-carried or mailed bid submissions and strict adherence to base access security protocols for personnel.

General Info

Contract Value

$128,177.68

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

321 Cullen St Bldg. 216, SHAW AFB, SC, 29152, USA

Set-Aside

NONE

Award Issued Date

Documents

20

3rd Army HQ Complex - Shaw AFB Geotechnical Data

PDF, High priority: read this firstspecifications
High

ARCENT Parking Utility Map - Shaw Air Force Base

PDF, High priority: read this firstspecifications
High

Attachment 9 B1957 Electrical Drawings - Luminaire Schedule

PDF, High priority: read this firstspecifications
High

FA480318B0002 Amendment 0002

PDF, High priority: read this firstamendment
High

FA4803-18-B-0002 ARCENT Parking - Bid Questions Answered

PDF, High priority: read this firstq-and-a
High

FA480318B0002 - Construct ARCENT Parking B1957

PDF, High priority: read this firstifb
High

FA4803-18-B-0002 Dimensional Site Drawings

PDF, High priority: read this first1 page · specifications
High

FA4803-18-B-0002 Site Electrical Drawings

PDF, High priority: read this first1 page · specifications
High

SC180043 Wage Determination - South Carolina Highway Construction

PDF, High priority: read this firstwage-determination
High

Shaw AFB Design and Construction Standards

PDF, High priority: read this firstspecifications
High

Shaw AFB Installation Development and Design (ID2) Handbook

PDF, High priority: read this firstspecifications
High

VLSB14-0008 Construct ARCENT Parking B1957 SOW

PDF, High priority: read this firstsow
High

VLSB 18-0040 Amendment 0001 - ARCENT Parking

PDF, High priority: read this firstamendment
High

VLSB18-0040 Bid Schedule - Construct ARCENT Parking B1957

PDF, High priority: read this firstbid-schedule
High

VLSB18-0040 Const ARCENT Parking (B1957) Blank Cost Spreadsheet

XLSX, High priority: read this firstspecifications
High

VLSB 18-0040: Construct ARCENT Parking B1957 SOW

PDF, High priority: read this firstsow
High

Contractor Base Pass Request Form - Shaw AFB

PDF, Low priorityother
Low

FA4803-18-B-0002 Construct ARCENT Parking

PDF, Low prioritypresolicitation
Low

VLSB 18-0040 Construct ARCENT Parking B1957 Site Visit Minutes

PDF, Low priorityq-and-a
Low

Attachment_15-_C217.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Combined Synopsis

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4803 20 Cons Lgca
Contacts2 people available
OfficeSHAW AFB, SC, 29152-5125, USA
Office AddressSHAW AFB, SC, 29152-5125, USA
Contacts
Jennifer MarjanovicContract Specialist
Joseph A. NemedyContract Officer

Full Description

Show more
The 20th Contracting Squadron at Shaw AFB, SC intends to award a firm-fixed price Construction contract. The Contractor shall provide all labor, material, equipment and transportation, and perform all operations necessary to accomplish construction of parking for ARCENT Building B1957 in strict accordance with the statement of work. In accordance with Federal Acquisition Regulation (FAR) 36.204 -- Disclosure of the Magnitude of Construction Projects, the estimated contract magnitude for this acquisition is between $100,000 and $250,000. The requirement will be acquired utilizing procedures under FAR Part 14 - Sealed Bidding and FAR Part 36 - Construction and Architect -- Engineer Contracts. The North American Industry Classification System (NAICS) code for this acquisition is 237310 and the size standard is $36.5 million. THIS ACQUISITION IS BEING ISSUED AS A HUB-ZONE SET-ASIDE IAW FAR 19.1301, AND WILL RESULT IN THE AWARD OF A SINGLE, FIRM-FIXED-PRICE CONTRACT. A request for quote will be available for download on or about 09 July 2018 at the following website: www.fbo.gov Potential vendors are hereby notified that the solicitation and subsequent amendments to the solicitation will ONLY be available by downloading the documents at the above website. This office will no longer issue hard copy solicitations. By submitting a quote, the vendor will be self-certifying that neither the requestor nor the principal corporate officials and owners are currently suspended, debarred, or otherwise ineligible to receive contract from any federal agency. Failure to do so may represent grounds for refusing to accept the quote. Through its submission, the vendor acknowledges the requirement that a prospective awardee must be registered in the System for Award Management (SAM) database prior to award, during performance and through final payment of any contract resulting from this solicitation, except for award to foreign vendors for work to be performed outside the United States. Lack of registration in SAM database will make a vendor ineligible for award. Vendors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220, or via the internet at http://www.sam.gov. Email your proposal and all questions regarding this requirement to SSgt Mark G. Wheeler at mark.wheeler.10@us.af.mil and Joseph Nemedy at Joseph.nemedy.1@us.af.mil

More opportunities from Department Of Defense → FA4803 20 Cons Lgca

Same awarding agency

NAICS: 236220
New
Federal
FY27 MACC
Solicitation # FA480326B0006
The FY27 MACC is a competitive total small business set-aside, design-build, Indefinite-Delivery/Indefinite-Quantity (IDIQ) construction contract. This seven-year acquisition, with a total aggregate maximum value of 175 million dollars, provides a vehicle for a broad range of construction services, including the repair, replacement, and new installation of systems and components. Performance is centered at Shaw Air Force Base, the Poinsett Weapons Range, and the Wateree Recreation Facility, as well as other remote sites, excluding military family housing. The government intends to award seven IDIQ contracts, with offerors ranked from low to high based on a seed project involving the repair of Building 1816. To be considered responsive, offerors must be registered in SAM, provide a financial information request, and submit notarized bonding information demonstrating a minimum capacity of 7.5 million dollars per project and 40 million dollars aggregate. Bids must be submitted through the PIEE Solicitation module in three separate volumes, including detailed pricing on government-provided sheets. Task orders will be issued as firm-fixed-price contracts, and awarded contractors must maintain an effective quality control system complying with FAR 52.246-12. All work must adhere to Unified Facilities Criteria (UFC) and Shaw Air Force Base design and construction standards, with strict compliance required for base access, security protocols, and environmental regulations.
Commercial and Institutional Building Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS