This Solicitation opportunity from California was posted on September 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the construction of Basin D at East Side Regional Park in Visalia, California, with a project value of approximately 2.69 million dollars. The work must be completed in accordance with the detailed plans and specifications outlined in solicitation RFB-25-26-05. The project is managed by the City of Visalia and falls under the NAICS code 237310, which pertains to construction of water and sewer line and related structures. The solicitation was posted on September 11, 2025, with a response deadline of October 8, 2025, and is open to qualified contractors interested in bidding on this project. The primary point of contact for inquiries is the Visalia Purchasing Department, accessible via email at [email hidden]. Interested parties can find additional details and submit their bids through the designated bid portal.
HighAI Summary for 79-1 Plans ESRP Basin D by CWE: Technical engineering plans for ESRP Basin D, featuring detailed line and curve tables for the centerline of a trail and maintenance road. The document provides precise measurements including lengths, bearings, radii, and tangents.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for California General Prevailing Wage Determinations - Iron Worker and Electrical Utility Lineman: General Prevailing Wage Determinations issued by the Director of Industrial Relations for California commercial building, highway, heavy construction, and dredging projects. Includes specific hourly rates, benefits, and overtime for Iron Workers (Determination C-20-X-1-2025-1) and Electrical Utility Linemen (Determinations C-61-X-3-2025-2 and C-61-X-4-2025-1), with issue dates in February and August 2025.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for City of Visalia Engineering Standard Specification Amendments: Updated January 16, 2025, this document provides official amendments to the City of Visalia Engineering Standard Specifications. It includes critical technical requirements for soil compaction, certified testing laboratory standards, sampling and testing procedures for non-public projects, and specific modifications to trench and structure excavation requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Visalia Engineering Standard Specifications: Engineering Standard Specifications for the City of Visalia Community Development Department Engineering Division, dated August 5, 2013. The document establishes accepted standards for subdivisions, public works, and parks projects, covering proposal requirements, contract execution, scope of work, material control, legal responsibilities, and technical specifications for earthwork, traffic control, and clearing.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for City of Visalia Labor Compliance Manual: Issued January 2015, this instructional manual outlines the City of Visalia's requirements for compliance with the California Labor Code, specifically regarding prevailing wage laws, contractor registration, and apprenticeship requirements for public works contracts. It details the impact of Senate Bill No. 7 and provides guidance on contractor registration and the duties of both the awarding body and the contractors.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Visalia Landscape Standard Specifications: Dated August 5, 2013, this document provides the standard technical specifications for landscaping, irrigation, and related improvements within the public rights-of-way for the City of Visalia Parks and Recreation Department. It includes detailed requirements for plan preparation, materials (concrete, asphalt, irrigation, plants), construction methods, and compliance with CA AB1881 MWELO.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for City of Visalia Standard Specifications for Building Around Valley Oaks: Dated August 3, 2007, this document outlines the mandatory technical specifications and protection requirements for Valley Oak trees during development projects within the City of Visalia. It details requirements for management plans, protective fencing, earthwork restrictions, boring depths for utilities, and specific irrigation schedules to ensure tree survival during construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Eastside Regional Park - Basin D Landscape & Irrigation Plans: Technical design documents and specifications for the Eastside Regional Park Basin 'D' project in Visalia, CA. The file includes a landscape documentation checklist, a detailed sheet index (T-1 through L-21), planting soil requirements, and a comprehensive irrigation schedule specifying hardware (Hunter, Salco, Baseline), quantities, and material standards for the contractor.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Geotechnical Engineering Report - Basins F and G, Visalia: Geotechnical Engineering Report dated April 1, 2020, prepared by Terracon Consultants, Inc. for the East Side Regional Park Basins G and F project in Visalia, Tulare County, California. The document provides subsurface exploration results, soil characterization, and engineering recommendations for foundation design, earthwork, pavement, and infiltration systems (dry wells) for the proposed groundwater recharge basins and recreational amenities.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for RFB 25-26-05: Basin D at the East Side Regional Park: Request for Bid (RFB No. 25-26-05) issued by the City of Visalia, CA, for construction work on Basin D at the East Side Regional Park. Dated August 28, 2025, with a bid submittal deadline of October 8, 2025. The project has an engineer's estimate of $2,693,000 and a completion time of 125 working days. The document includes construction specifications, bid item proposal schedules, required forms, and technical details for storm drains, landscaping, and site improvements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 8400 Irrigation Technical Specifications: Technical specifications for the installation of a landscape irrigation system, including requirements for labor, materials, piping, controllers, and testing. The document outlines the scope of work, coordination with other trades, permit requirements, and submittal procedures for irrigation equipment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Swainson's Hawk Nesting Surveys Recommended Timing and Methodology: Dated May 31, 2000, this document provides technical guidelines developed by the Swainson's Hawk Technical Advisory Committee (TAC) for conducting nesting surveys in California's Central Valley. It details specific methodologies, including equipment requirements, survey speeds, and observation techniques, as well as a detailed timing schedule divided into periods (January through June) to maximize the detection of nesting hawks and minimize project-induced nest failures.
PDF
PDF, Low prioritypermit-notice
LowAI Summary for 79-6 Oak Tree Removal Intent Notice - ESRP Basin D: Dated July 2, 2025, this document is an 'Intent to Remove Notice' from the City of Visalia regarding the removal of three Valley Oak trees at ESRP Basin D. The removal is requested by Rudy Lopez to facilitate the development of a new recharge basin and recreational space. The document includes arborist assessments recommending removal due to risk and development needs, outlines the 10-day appeal process per Ordinance 12.24.040, and notes that an Encroachment Permit may be required.
PDF
PDF, Low prioritypolicy-manual
LowAI Summary for City of Visalia Encroachment Permit Policy Manual: The Encroachment Permit Policy Manual, dated July 31, 2025, establishes the standards and requirements for any party wishing to perform work or restrict travel within the City of Visalia's Right-Of-Way (ROW). It outlines the application process, required documentation, construction work hours, and coordination requirements to ensure public safety and infrastructure protection.
PDF
PDF, Low priorityother
LowAI Summary for City of Visalia Municipal Code Chapter 8.56 - Weeds and Property Maintenance: This document is an excerpt from the City of Visalia Municipal Code, specifically Chapter 8.56, which outlines regulations regarding weeds and property maintenance. It defines public nuisances, establishes the responsibility of property owners for maintenance, and grants the fire chief authority for administration and enforcement to ensure public health, safety, and fire prevention.
PDF
PDF, Low priorityapplication-form
LowAI Summary for City of Visalia Notice of Intent to Prune Valley Oak Trees: A permit application form for the City of Visalia, Parks & Recreation, requiring notification and contractor licensing verification (C-27 or C-61/D-49) for the pruning of Valley Oak trees within city limits.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for East Side Regional Park Groundwater Recharge-Basin D - ISR Summary: This document is an ISR (Initial Study Report) summary for the East Side Regional Park Groundwater Recharge-Basin D project (ID C-20250142) applied for by the City of Visalia. It outlines emission reduction measures enforced by the SJVAPCD, specifically regarding recordkeeping, construction/operational dates, and off-site fee exemption reporting.
RFB-25-26-05 - BUILD BASIN D AT EAST SIDE REGIONAL PARK (ESRP). Location: Visalia, Tulare County, California, United States. This project involves the construction of Basin D at East Side Regional Park in accordance with the plans and specifications outlined in RFB-25-26-05.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award