Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of The Interior was posted on May 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construct New Water Control Structure (Harrison La

Closed
140FC226R0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the existing Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Additional deliverables include the installation of new gravity sewers, manholes, and a fully operational pumping station equipped with mechanical and electrical systems, a generator, and odor control equipment. The project has an estimated value of 16,690,000 dollars. This solicitation is set aside for Small Businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone Small Businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation criteria focusing on qualifications, financial ability, and strict adherence to bidding documents, including the submission of MWBE Good Faith Efforts and Table A. The agreement is based on EJCDC standard forms, requiring performance and payment bonds, as well as proof of insurance. Bids are due by November 10, 2026, with a final bid opening date of November 12, 2026. Contract administration involves monthly progress payments due 30 days after presentation to the owner, subject to review by the Engineer and the Resident Project Representative. The contractor must adhere to rigorous technical standards, including AWS D1.2 for welding and NEMA standards for motors. Materials must be delivered in original manufacturer packaging with specific labeling and storage requirements, such as maintaining a minimum ambient temperature of 45 degrees Fahrenheit for coatings. The project commences upon the issuance of a Notice to Proceed, which typically occurs within 30 to 60 days of the bid opening or effective date.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 12 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including concrete resurfacing, restoration, and the installation of FRP reinforcing systems. Mechanical and structural requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation of new slide gates and modifications to existing sluice gates. Additional technical tasks include the rehabilitation of reactor mixers and aerators, the installation and operation of a temporary 11 MGD pumped bypass, and extensive electrical and instrumentation upgrades, including the replacement of motor control center components. This solicitation is open to small businesses, including certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. All subcontractors are required to utilize union labor and must be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Requested services and supplies include lead abatement, metals fabrication, painting and coatings, trucking and hauling, and the provision of access hatches. Quotes are due by November 17, 2026, at 2:00 PM PT, with the final bid date set for November 18, 2026. Submissions should be based on Garney Standard PO and Subcontract Forms, with any exceptions submitted as redlines.
Garney Pacific, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

The contract involves the construction of a new water control structure at Harrison Lake National Fish Hatchery in Charles City, Virginia, under a Firm Fixed Price arrangement with a total estimated value between $100,000 and $250,000. The work encompasses environmental permitting including Virginia Water Protection and Section 404 approvals, demolition, erosion and sediment control, installation of a water control structure with aluminum stoplogs, site stabilization, and full compliance with federal and state environmental regulations such as the Clean Water Act, OSHA standards, and the Endangered Species Act. The scope is detailed in a Statement of Work that mandates adherence to ASTM C94 for concrete, submission of a Stormwater Pollution Prevention Plan, and a work schedule within ten days of award. The period of performance is 240 calendar days after the Notice to Proceed, with performance expected between June 15, 2026, and February 15, 2027. Work hours are strictly limited to one-half hour before sunrise to one-half hour after sunset, with no work permitted on weekends or federal holidays without explicit authorization, and all activities are subject to immediate suspension if endangered species are encountered or environmental conditions warrant. The solicitation is a total small business set-aside under FAR 19.5, requiring all offerors to self-certify as small businesses via SAM.gov, with no other socioeconomic preferences applied. The Government will award without discussions on a Lowest Price Technically Acceptable basis, meaning technical acceptability is a pass/fail threshold and award goes to the lowest-priced compliant offer. Key performance requirements include immediate reporting of archaeological or historical discoveries per Public Law 93-291, strict controls over hazardous materials including potential asbestos, and binding commitments to submitted key personnel, materials, and subcontractors without substitution without written approval. Special requirements include environmental interruption protocols, restrictions on site access, Davis-Bacon wage rules applicable only to truck drivers on-site or hauling to a dedicated facility, and mandatory compliance with multiple federal environmental statutes. All submissions must be made electronically via email to the designated contracting officer, with payment processed exclusively through the Invoice Processing Platform, and all work must conform to contract drawings and specifications without reliance on scaled-down versions. The contractor is responsible for all packaging and postage, must label all submissions with the contract number, and is subject to penalties for noncompliance, including reimbursement of government liabilities arising from improper hazardous waste handling. The contract incorporates standard construction clauses including performance and payment bonds,

General Info

Construction of water control structure at Harrison Lake hatchery; small business set-aside, responses due June 2, 2026.

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

VA

Set-Aside

SBA

Documents

4

A04_SOW_Environmental Permitting and Water Control Structure Construction

PDF, High priority: read this firstsow
High

A06 Bid Schedule for Environmental Permitting and Water Control Structure

PDF, High priority: read this firstbid-schedule
High

Solicitation 140FC226R0008 - Construct New Water Control Structure at Harrison Lake NFH

PDF, High priority: read this firstifb
High

Wage Decision VA20260001 for Heavy Dredging in Virginia

PDF, High priority: read this firstwage-determination
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Construction A/e Team 1 Fws
Contacts1 person available
OfficeFalls Church, VA, 22041, USA
Office AddressFalls Church, VA, 22041, USA
Contacts

Full Description

Show more
Construct New Water Control Structure (Harrison Lake NFH)

More opportunities from Department Of The Interior → Construction A/e Team 1 Fws

Same awarding agency

NAICS: 541620
Federal
Environmental Compliance and Monitoring SupportThis contract entails on-site environmental monitoring services to ensure strict adherence to the Endangered Species Act during construction activities. The primary responsibility is to identify and respond to the presence of threatened or endangered species in real time, with an immediate and mandatory shutdown of all work if such species are detected. The scope of work is centered on compliance, requiring continuous surveillance by qualified personnel to prevent habitat disruption and legal violations. All monitoring must be conducted in alignment with federal conservation standards and regulatory expectations set forth by the Department of the Interior. The contract is awarded as a subcontract under NAICS code 541620, indicating it involves environmental consulting and related services. It is managed by Construction A/e Team 1 Fws, acting under the authority of the Department of the Interior, and is positioned for performance in an unspecified location, suggesting flexibility in geographic application. The monitoring effort is not a passive compliance check but an active, dynamic safeguard requiring immediate operational intervention. Work stoppage is non-negotiable upon species detection, emphasizing the priority of species protection over project timelines. The contract reflects a high-stakes environmental responsibility where timing, accuracy, and responsiveness are critical to avoid regulatory penalties and ecological harm.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS