Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Agriculture was posted on August 10, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction - AOP Culvert Replacements at Mulky Gap and Dixon Creek

Closed
12435H18R0007Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
Design and Construction of Levee Access Manholes for Fairfax-Jersey Creek Levee Unit (Kansas City, Kansas)
Solicitation # W912DQ26RA065
The U.S. Army Corps of Engineers, Kansas City District, is soliciting design-build construction services for the installation of access manholes at the Fairfax-Jersey Creek Levee Unit on the Missouri River in Kansas City, Kansas. The project scope involves designing and constructing manholes, with estimated depths between 10 and 25 feet, to facilitate the video inspection of approximately 27,000 feet of existing perforated corrugated metal seepage collector pipe. To maintain levee integrity, the government strictly prohibits invasive mass excavation methods such as trenching, requiring the use of minimally invasive excavation techniques. Key deliverables include a Drilling and Invasive Program Plan approved by a licensed professional engineer or geologist, temporary flood protection plans, and final as-built drawings. This is a firm-fixed-price contract with an estimated magnitude between $1,000,000 and $5,000,000, though the total award amount shall not exceed $3,400,000. The acquisition is categorized under NAICS code 237990 with a small business size standard of $45 million. The selection process is conducted in two phases; Phase 1 focuses on qualifications and technical approach without pricing, from which up to three qualified offerors will be selected for Phase 2. Evaluation factors include design concepts, performance confidence, technical approach and qualifications, and small business participation, with non-price factors being significantly more important than price. Proposals must be submitted via the PIEE Solicitation Portal and adhere to strict documentation requirements, including the use of specific government templates for vendor information, experience, and technical qualifications.
W071 Endist Kansas City

POSTED

about 12 hours ago

DEADLINE

in 6 days
NAICS: 237990
New
Federal
PASS-A-GRILLE-PASS, MAINTENANCE DREDGING, PINELLAS COUNTY, FLORIDA
Solicitation # GROUP1-27-R-J001
Solicitation GROUP1-27-R-J001 is a total small business set-aside for maintenance dredging at Pass-a-Grille Pass in Pinellas County, Florida, issued by the U.S. Army Corps of Engineers, Jacksonville District. This firm fixed price task order is limited to contractors previously awarded under solicitation W912EP25R0010. The scope of work involves excavating material from the pass and transporting it to the Pass-a-Grille Beach Placement Area located north of the channel. Hopper dredging is strictly prohibited. Incidental requirements include environmental and water quality monitoring, beach fill quality control, tilling, vibration monitoring, and Munitions and Explosives of Concern construction support. The project has a price target range between $5,000,000 and $10,000,000, with a performance period of 120 calendar days following the Notice to Proceed, and work must commence within 60 calendar days of that notice. The government will utilize the Lowest Price Technically Acceptable process for award, evaluating offerors based on the technical acceptability and availability of their identified dredge and their past performance under the associated MATOC. Proposals must be submitted in PDF format via the PIEE Solicitation Module by 2:00 PM EST on November 20, 2026. Key compliance requirements include adherence to the Davis-Bacon Act, the provision of performance and payment bonds within 10 days of award, and the submission of qualified bird monitor credentials. Technical specifications require beach fill to be clean sand free of debris or toxic materials, with strict monitoring at both the borrow and placement areas to ensure quality standards are met.
W074 Endist Jacksnvlle

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 237990
New
Federal
Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project
Solicitation # W912DS26RA032
Solicitation W912DS26RA032 is a competitive two-phase design-build procurement issued by the US Army Corps of Engineers, New York District, for the Port Monmouth Phase II Contract 1 Mitigation project in Middletown, New Jersey. With an estimated project magnitude between $15 million and $30 million, the scope involves the design and construction of wetland and upland restoration at the Pews Creek and Compton Creek mitigation sites. The project aims to reduce storm damages from coastal erosion and flooding in Raritan Bay, specifically focusing on restoring approximately 24.83 acres of wetlands and channels and 8.76 acres of uplands. The State of New Jersey Department of Environmental Protection serves as the non-Federal sponsor. The procurement follows a best-value tradeoff process in accordance with FAR 36.3, where non-price evaluation factors are approximately equal in importance to price. Phase One focuses on qualifying offerors based on specialized experience and past performance to shortlist up to five firms for Phase Two. Final award will be a firm fixed-price contract. Key requirements include strict adherence to New Jersey environmental standards, the provision of performance and payment bonds, and compliance with the Davis-Bacon Act. Following multiple amendments, the final response deadline for proposals was extended to October 21, 2026.
W2SD Endist New York

POSTED

about 12 hours ago

DEADLINE

in about 18 hours
NAICS: 237990
New
Federal
Stove Prairie Campground Gate Replacement
Solicitation # 117346
The USDA Forest Service, CSA Intermountain, is soliciting quotes for the disposal and replacement of a broken 32-foot double lane closure gate at Stove Prairie Landing in Bellvue, Colorado. This project is a total small business set-aside under NAICS code 237990, with an estimated project magnitude between $25,000 and $100,000. The award will be a firm fixed-price contract. The selected contractor must provide all labor, materials, and equipment for mobilization and the installation of the gate, ensuring all signage meets MUTCD standards and concrete work adheres to specific AASHTO sampling and testing requirements. Work must commence within 10 calendar days of the notice to proceed and be completed by August 31, 2027. Evaluation will be based on best value, focusing on the offeror's technical approach and price. Applicants must submit a 1-3 page technical narrative and a construction schedule, such as a Gantt chart, along with their pricing documentation. All quotes must be submitted via email to Contract Specialist Jordan Carlsen by November 11, 2026, at 14:00 EST. The contract requires the provision of performance and payment bonds and mandates that all invoicing be processed through the electronic Invoice Processing Platform (IPP) system. The government will conduct inspections at all reasonable times before final acceptance in accordance with FAR 52.246-12.
Csa Intermountain 8 Usda-Fs

POSTED

about 12 hours ago

DEADLINE

in 22 days
NAICS: 237990
New
SLED
Madera Unified School District Outdoor Education FacilityThe Madera Unified School District is proposing the construction and operation of the Outdoor Educational Facility Project located at the intersection of Almond Avenue and Stadium Road in Madera, California. This project involves the development of a 25.61-acre complex designed for district educational programs, youth sports, community events, and general public recreation. The facility will feature five ball fields, three soccer fields, five sand volleyball courts, a parking lot with approximately 313 spaces, and two support buildings comprising an office, training, and storage facility, as well as a ticket booth and restroom building. The scope also includes roadway, sidewalk, and utility improvements along the project frontage and the expansion of a City-owned stormwater basin. The project is governed by the California Environmental Quality Act (CEQA), with a Draft Initial Study and Mitigated Negative Declaration indicating that the project will not cause significant environmental harm provided specific mitigation measures are implemented. Key requirements include the use of full cut-off lighting fixtures, strict adherence to nesting bird protection windows between February and August, archaeological monitoring for excavations exceeding three feet, and paleontological discovery protocols. The project is managed by Rosalind Cox, Director of Facilities Planning, and involves coordination for potential annexation of portions of the site into the City of Madera.
Madera Unified School District

POSTED

about 17 hours ago

DEADLINE

N/A

General Info

Contract Value

$494,564.34

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Blue Ridge Ranger District FSR 4 Mulky Gap Road, beginning at the intersection with FSR 88 at the Dixon Creek crossing conti, Blairville, GA, 30512, USA

Set-Aside

NONE

Award Issued Date

Documents

17

12435H18R0007 Mulky Gap & Dixon Creek Culvert Replacements

PDF, High priority: read this first35 pages · rfp
High

12435H18R0007 - Mulky Gap & Dixon Creek Culvert Replacements IFB

PDF, High priority: read this first2 pages · ifb
High

AOP Culvert Replacements Mulky Gap & Dixon Creek Drawings

PDF, High priority: read this first23 pages · specifications
High

Bid Tabs for Mulkey/Mulky Gap Culvert Replacements

XLSX, High priority: read this first2 pages · bid-tab
High

Dixon Creek AOP Culvert Design Summary

PDF, High priority: read this first5 pages · sow
High

FAR 28.102 Performance and Payment Bonds Guidance

PDF, High priority: read this first3 pages · specifications
High

Forest Service Supplemental Specifications - Mulky Gap & Dixon Creek Culvert Replacements

PDF, High priority: read this first47 pages · specifications
High

FP14-FSSS Supplemental Specifications for Mulky Gap & Dixon Creek

DOCX, High priority: read this first46 pages · specifications
High

GA180225 Davis-Bacon Wage Determination

DOCX, High priority: read this first5 pages · wage-determination
High

GA180225 Georgia Highway Construction Wage Determination

PDF, High priority: read this first5 pages · wage-determination
High

Mulky Creek AOP Culvert Design Summary

PDF, High priority: read this first6 pages · sow
High

Mulky_Dixon_Bidtab - bid tabulations for culvert replacements

PDF, High priority: read this first2 pages · other
High

Mulky Dixon Section M Culvert Replacement - Evaluation Factors

PDF, High priority: read this first1 page · rfp
High

Mulky Gap & Dixon Creek Culvert Replacements - Supplemental Specifications

PDF, High priority: read this first47 pages · specifications
High

Mulky Gap Road Culvert Replacements - Section C General Requirements

PDF, High priority: read this first4 pages · sow
High

Pre-bid Questions and Answers – Solicitation 12435H18R0007

PDF, High priority: read this first1 page · q-and-a
High

Schedule of Items - Mulkey/Mulky Creek Culvert Replacements

PDF, High priority: read this first2 pages · schedule-of-items
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Chattahoochee Oconne National Forest
Contacts2 people available
OfficeGAINESVILLE, GA, 30501, USA
Office AddressGAINESVILLE, GA, 30501, USA
Contacts

Full Description

Show more
Description of Work Pre-Bid visit information in attachment 12435H18R0007 and below August 1, 2018 10:00 EST (The pre meeting shall be mandatory and shall meet at the intersection with FSR 4 and FSR 88. This is where Dixon Creek crosses Mulky Gap Road. ) Culvert Replacements are s located on FSR 4 Mulky Gap Road, beginning at the intersection with FSR 88 at the Dixon Creek crossing continue north on Mulky Gap Road for about .85 miles to the second culvert where Mulky Creek Crosses FSR 4, Mulky Gap Road. The road is located on the Blue Ridge Ranger District of the Chattahoochee-Oconee National Forests in Union County, Georgia. The project is located on Mulky Quad map. The project removes the existing Dixon Creek, 15 foot long by 42 inch diameter culvert and the existing 36 inch diameter 22 foot long Mulky Creek Culvert. Both culverts have CCC constructed stone head walls. The stones from the head walls are to be reserved and reused to delaminate the edge of road over the new culvert installations. The road bed is width at the culverts is 14 feet with 2 feet of shoulder. The approach road has a ditch on upland side of the road that is 1 foot deep. The approach sections are 30 feet long and have a riprap section 24 inches thick topped by 4" compacted in place of GDOT # 4 aggregate. Any of the salvaged headwall stone that is not used in the rebuilding of the new culvert headwalls, if two feet minimum diameter boulders shall be placed on the edges of the travel way to act as curbing on the culverts. The rest may left stockpiled on site for future use by the Forest Service. The replacement culvert at Mulky Creek is a Contech Aluminum Structural Plate open Box Culvert No. 43, R3 with HG/CG =2/2 or approved equivalent. Culvert spans 19' 6" and rises 6' 1" and a length of 22.5 feet. It has an opening of 97.1 ft. sq. with min. cover of 1.4 ft. and max. cover of 5.0 feet. The loading is HL-93. The head wall shall be reinforced concrete rather than the standard aluminum because of the need to replicate the masonry headwall on the new culvert. The concrete headwall measures approximately 22' 3-3/4" long and 9'-1" high with two sloping wing walls 10 feet long. The replacement culvert at Dixon Creek is a Contech Aluminum Structural Plate open Box Culvert No. 28, R3 with HG/CG =2/2 or approved equivalent. Culvert spans 14'-10" and rises 4'-10" and a length of 22.5 feet. It has an opening of 63.2 ft. sq. with min. cover of 1.4 ft. and max. cover of 5.0 feet. The loading is HL-93. The head wall shall be reinforced concrete rather than the standard aluminum because of the need to replicate the masonry headwall on the new culvert. The concrete headwall measures approximately 18' 1- " long and 9'-1" high with two sloping wing walls 10 feet long. The Contractors shall provide shop drawings for the headwall and footing design with the Forest Service reviewing and approving the shop drawings before construction of the headwalls begin. Limited clearing is required at that site. Only those trees which must be removed to adjust the alignment of the new culvert and road widening are expected to be removed. The timber will be marked by the Government prior to removal. The timber will be topped, limbed, cut to length and decked in the dispersed campsite adjacent to the worksite. The tops and limbs will be used as brush barriers to protect the work site from sediment transport. Camping There are two Forest Service campgrounds in the area where the Contractor may make reservations and camp for two weeks. The contractor may also use a dispersed campsite near project site with site selection agreed upon with the Contractor and wishes to camp for longer than two weeks the Contractor may will obtain a permit from the District Ranger to use the location for duration of the contract. ? B. Location The culverts are located on FSR 4, Mulky Gap Road. Access to the road is off of Georgia 60. The reach FSR 4 take Georgia 60 to Cavender Gap road approximately 7 miles from Suches Ga. Turn on Cavernder Gap Road and follow it until the intersection with FSR 236 to the left. Continue on FSR 236 approximately 3.0 miles to the intersection with FSR 4. Turn right on to FSR 4, for approximately 1.3 miles to the Dixon Creek crossing and then another .85 miles to the Mulky Creek crossing C. Environmental The contractor shall be responsible for keeping all silt and construction debris from leaving the construction limits. Any silt or construction debris found outside the construction limits shall be cleaned up and removed at no cost to the government. The Contractor shall comply with the State of Georgia erosion and Sediment control measures. Anyone who works with the erosion control best management practices (BMP's) must be licensed according to the Georgia Soil and Water Conservation Commission Requirements. D. Pre Bid Meeting The pre meeting shall be mandatory and shall meet at the intersection with FSR 4 and FSR 88. This is where Dixon Creek crosses Mulky Gap Road. E. Price Range less than $500,000 F. Contract Time The Contractor shall have 180 days to complete the contract the project. The contract shall run from. The Contract time shall begin 45 days from the date of award. G. Inspection and Acceptance Periodic field inspections will be made by the Contracting Officer's Representative (COR) or the COR's designated inspector. Work not completed to the Contract Specifications shall be reworked without compensation to the contractor. C2 SPECIFICATIONS The Contractor shall furnish the necessary personnel, material equipment, services and facilities (except as otherwise specified), to perform the description of work/Statement of Work reference in Section J. The projects specifications are included by reference are Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects FP-14. They may be obtained on the internet at https://flh.fhwa.dot.gov/resources/specs/ SECTION M--EVALUATION FACTORS FOR AWARD EVALUATION FACTORS The following factors will be used to evaluate proposals for award. Evaluation factors other than price, when combined, are approximately equal to price in the award decision. All technical factors are relatively equal in weight. Information should be provided for the general contractor and major subcontractors. I. TECHNICAL A. Plan of Work: The government will evaluate the offeror's plan for accomplishing the work, including equipment, on-the-ground labor, subcontractors, and project supervision. If subcontractors are used for labor, higher score will be given to firms using reliable subs with whom they have an already-established working relationship. Lower scores will be given to firms who intend to subcontract to firms never used before, or do not have firm plans in place to use a specific subcontractor. B. Experience: particularly prior experience of the offeror and any subcontractor in direct performance of road construction, culvert assembly and installation, or similar civil engineering work. Direct experience in civil engineering work is preferable to construction management of subcontractors. II. PAST PERFORMANCE In the case of a newly-established offeror without a record of relevant past performance, the evaluation will take into account information regarding predecessor companies, key personnel who have relevant experience, or subcontractors who will perform significant portions of the requirement. When no information is available, the offeror may not be evaluated favorably or unfavorably. III. PRICE AWARD DECISION Award will be made to the most highly ranked offeror (1) whose total proposal is technically acceptable, (2) has demonstrated past performance in meeting customer satisfaction, and (3) whose past performance and technical/cost relationship presents the BEST VALUE and is the most advantageous to the Government. Evaluation factors other than price, when combined, are approximately equal to price in the award decision. The critical factor in making any cost/technical trade-off is not the spread between the technical scores but, rather, the significance of that difference. The significance of the spread of scores will be determined on the basis of what the difference might mean in terms of performance and what it would cost the Government to take advantage of it. Award may not necessarily be made for technical capabilities that would appear to exceed those needed for the successful performance of the work. The Government reserves the right to make cost/technical trade-offs that are in the best interest and advantageous to the Government.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS