Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Government of Canada was posted on April 23, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction d'un pont préfabriqué en acier de 85 mètres

Closed
20118834International

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation, civil works, and environmental services including SWPPP, land surveying, shoring, and asphalt paving. Required materials and supplies range from precast concrete and ready mix to cathodic protection, steel casing, and traffic signals and lighting. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, WBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums. The bid deadline is November 18, 2025, and interested parties must coordinate through Kiewit's Building Connected system or contact Lead Estimator Ken Johnston for project specifications and invitations to bid.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

1 day ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 15 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 1 day

AI Contract Overview

Show more

La Ville de Prévost lance un appel d’offres pour la construction d’un pont préfabriqué en acier d’environ 85 mètres de long et 12 mètres de large, destiné à relier le boulevard du Curé-Labelle à l’Avenue du 4-Mai dans la région des Laurentides. Ce pont comprendra une voie dans chaque direction, une piste cyclable bidirectionnelle, ainsi qu’un aqueduc suspendu. Les travaux incluent plusieurs étapes, telles que le battage de pieux, le bétonnage des fondations, la construction des approches du pont, l’érection des piles en acier, l’assemblage de la structure métallique, ainsi que la mise en place d’un aqueduc de 250 mm d’environ 120 mètres suspendu sous le pont. En complément, le contrat prévoit aussi le pavage, le marquage de la chaussée, l’arrimage de la nouvelle route avec le pont, l’installation d’un éclairage décoratif à LED et l’ajustement de la signalisation et des feux de circulation à l’intersection concernée. La date limite pour la soumission des offres est fixée au 16 avril 2026, et le projet est géré par la Ville de Prévost sous l’égide du gouvernement du Canada. Le lieu d’exécution des travaux est situé dans les Laurentides, et le point de contact principal pour toute communication liée au contrat est Mme Caroline Dion. Ce projet d’envergure vise à améliorer significativement la connectivité et la sécurité de ce secteur en intégrant des infrastructures modernes adaptées aux véhicules, cyclistes et piétons.

General Info

Construction d’un pont acier 85m long avec voie, piste cyclable, aqueduc suspendu, délais jusqu’au 16 avril 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Apr 16, 2026 to Apr 24, 2026.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Ville de Prévost.
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Dion CarolineContracting Authority

Full Description

Show more
La Ville de Prévost souhaite recevoir des soumissions dans le cadre de travaux de construction d'un pont préfabriqué en acier d'une longueur approximative de 85 mètres sur 12 mètres de large. Ce pont préfabriqué sera composé d’une voie dans chaque direction, d’une piste cyclable bidirectionnelle, ainsi que d’un aqueduc suspendu pour permettre le bouclage entre le boulevard du Curé-Labelle et l’Avenue du 4-Mai. Les composantes suivantes feront partie intégrante de la construction du pont. Veuillez prendre note que cette liste de travaux n’est pas exhaustive et est présentée à titre indicatif seulement. Battage de pieux; Travaux d’armature; Bétonnage des fondations; Construction des approches de pont (côté Est et Ouest); Érection des piles en acier; Assemblage de la structure de pont en acier; Nouvel aqueduc de 250 mm d’environ 120 m (suspendu sous la structure du pont); Pavage et marquage de chaussée; Arrimage de la nouvelle chaussée avec celle du nouveau pont; Éclairage type fûts décoratifs et luminaires au LED; Ajustement de la signalisation et des feux de circulation existants à l’intersection du boulevard du Curé-Labelle.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS