This Solicitation opportunity from Florida was posted on October 18, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction Engineering & Inspection (CEI) Services for the SE County Line Road Bridge Replacement Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves providing Construction Engineering and Inspection (CEI) services for the replacement of the Southeast County Line Road Bridge over the North Fork of the Loxahatchee River in Florida. The project entails demolishing the existing bridge and constructing a new four-span, 205-foot-long FDOT Florida slab beam bridge supported by precast concrete pilings and cast-in-place intermediate pile cap bents. Additional work includes installing a sheet pile wall, relocating a pedestrian bridge, reconstructing the roadway at both ends of the bridge, and creating pedestrian and bicycle access paths. The scope also covers utility relocations and site improvements to ensure comprehensive project completion. Qualified consultants and subcontractors must be FDOT pre-qualified in specific work groups, including highway materials testing, foundation studies, roadway CEI, construction materials inspection, and minor bridge and structures CEI. The contract, posted by Martin County, Florida, has an estimated value between five and fifteen million dollars, with a response deadline of November 13, 2024. The project aims to enhance transportation infrastructure, safety, and accessibility in the area, ensuring adherence to state standards and quality control throughout construction.
General Info
Agency
Place of Performance
FL, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
The work also includes new sheet pile wall installation, relocation of the existing pedestrian bridge, and roadway reconstruction at each end of the bridge and a pedestrian and bicycle access path.
Consultant and/or subcontractors shall be FDOT Pre-Qualified in the following Work Groups in accordance with Florida Administrative Code Rule 14-75 to perform the respective work tasks:
• Work Group 9.3 – Highway Materials Testing • Work Group 9.4.1 – Standard Foundation Studies • Work Group 10.1 – Roadway CEI • Work Group 10.3 – Construction Materials Inspection • Work Group 10.4 – Minor Bridge and Miscellaneous Structures CEI
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
