Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from General Services Administration was posted on June 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Industry Day GSA 1800 F Building Revitalization, Washington, DC

Closed
47PB5426N0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 11 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 11 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The U.S. General Services Administration is preparing to award a major construction contract for the revitalization of the historic 1800 F Street Building in Washington, DC, a property listed on the National Register of Historic Places and serving as GSA’s headquarters. The project, classified as a Major Repair and Alteration Construction effort, aims to modernize the building into a 21st-century federal workplace while preserving its architectural heritage, with a specific goal of reopening 40% of the facility currently idle due to outdated ventilation systems. The estimated construction value ranges between $275 million and $325 million, and the contract will be structured as a single award with multiple deliverables: core and shell work to be completed at firm-fixed-price after reaching 100% design by October 2026, building interior work at a Guaranteed Maximum Price (GMP) ceiling with approximately 50% design by October 2026, and building exterior work also at GMP ceiling with concept-level design at 35% completion by the same deadline. The selected contractor will first provide advisory management services during planning and design phases under firm-fixed-price terms, then transition into a construction manager role during execution under a GMP structure that may later convert to firm-fixed-price upon design finalization. The procurement will follow a two-phase RFP process, with qualifications submitted in July 2026 and pricing proposals due in October 2026, with award anticipated no later than the second quarter of FY2027 and substantial completion expected by fall 2028. The NAICS code is 236220 with a small business size standard of $45 million, and no set-aside is planned. The design team includes Shalom Baranes Associates as Architect of Record and Perkins & Will as Design Architects, with all work required to comply with GSA PBS Core Buildings Standards. The project is approved under NEPA AutoCATEX 5.3(j) contingent on compliance with Section 106 of the NHPA and the 2010 EA/FONSI. A concurrent Art-in-Architecture initiative will commission site-specific artwork through GSA’s Fine Art Program. An Industry Day was held on June 2, 2026, at the 1800 F Building, with mandatory pre-registration required and no walk-ins permitted, to enable industry feedback and clarify expectations. All submissions during the market research phase are

General Info

GSA Industry Day June 2, 2026, for 1800 F Street modernization, $275-$325M, two-phase procurement.

Agency

General Services Administration → Pbs Project Delivery Capital Construction - Branch WestView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Washington, DC, 20006, USA

Set-Aside

NONE

Documents

(3)

GSA 1800 F Building Revitalization Industry Day June 2026

PDFindustry-day

Registration+Confirmation++1800F+Reimagined+Industry+Day+at+GSA+Headquarters++2026+05+02.pdf

PDF

GSA-113+Industry+Day+PPT+-+FINAL.pptx.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

6 updates
PhaseClosed
Posted

special-notice

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Response Deadline

Deadline has passed

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs Project Delivery Capital Construction - Branch West
Contacts2 people available
OfficeWashington, DC, 20405, USA
Organization / Agency
General Services Administration → Pbs Project Delivery Capital Construction - Branch West
View Agency Profile
Office AddressWashington, DC, 20405, USA
Contacts
Robert Jackson
Daniel Ramirez

Full Description

Show more

5/29/2026- THIS NOTICE WAS UPDATED TO ADD THE INSTRUCTIONS FOR THE INDUSTRY DAY ON TUESDAY JUNE 2, 2026


THIS NOTICE WAS UPDATED TO EXTEND THE DUE DATE TO 3PM MAY 28TH.



Construction Industry Day



June 2, 2026 10:00 am - 3:30 pm



GSA 1800 F Building Revitalization, Washington, DC



The U.S. General Services Administration (GSA), Public Buildings Service (PBS), will host an Industry Day event in Washington DC, on Tuesday, June 2nd, from 10:00AM - 3:30PM, for all businesses (including, but not limited to, general contractors, subcontractor trades, and material suppliers) interested in the upcoming GSA 1800 F Building Modernization Design-Bid-Build (DBB) /Construction-Manager-as-Constructor (CMc) Contract.  



This event offers interested parties the opportunity to see the proposed project features, interact with GSA and other attendees, and provide feedback to help the Government improve project outcomes. This event is neither a solicitation nor a request for a proposal. All information contained herein is tentative and/or estimated and subject to change. Mandatory pre-registration is required and no walk-in-registrations are allowed. This includes virtual attendees. For security purposes, registration is required by Thursday, May 28, 2026. Event Registration should be done here: 



https://docs.google.com/forms/d/1MG7AFGnhaWmYnr_PNJX_jsNrGLjR-p905JHuSlLEK_E/edit



Procurement Strategy: The 1800 F Building Modernization project is defined as a Major Repair and Alteration Construction project. GSA plans to seek one (1) construction contract with multiple deliverables: core and shell, building interior, and building exterior work. The core and shell work is anticipated to have 100% design by October 2026 (solicitation target) and is planned to be awarded at a firm-fixed-price. The building interior work is anticipated to have approximately 50% design by October 2026 and is planned to be awarded at a Guaranteed Maximum Price (GMP) ceiling. The building exterior work is anticipated to have approximately 35% design (concepts) by October 2026 and is planned to be awarded at a GMP ceiling. For the building interior and exterior work the contractor is expected to provide advisory professional management assistance to GSA during the project planning and design phases. These services are provided at a firm-fixed-price. The contractor then acts as the construction manager during the construction phase. These services are established at a GMP (or ceiling) as a contract option at award and may be converted to firm-fixed-price upon design completion and exercise of the option.



The procurement method is expected to be a 2-Phase Request for Proposal (RFP). Phase I will be a request for qualifications (July anticipated issue date); Phase II will be a request for pricing (October anticipated issue date). Award will be made based on the best value to the Government.  



Separate from this Industry Day, the GSA is conducting market research for this requirement via a Sources Sought Notice.  Please see the Sources Sought Notice on www.SAM.gov.  All responses are welcome.  



Background: 1800 F Street is more than just GSA’s headquarters, it’s a living piece of federal


architectural history. Constructed in 1917 as a pioneering model of modern office design, this building has continuously evolved to meet the changing needs of government while maintaining its architectural integrity. As a property listed on the National Register of Historic Places, it represents a unique opportunity to showcase federal real estate management at its best. GSA’s goal is to execute a comprehensive project to preserve the building’s historical significance while transforming it into a 21st-century model of innovative workplace design and operational excellence two blocks from the White House.



Project Goals: The project seeks to transform the historic building from a series of incremental renovations into a long-term, adaptable federal asset. The primary objective is to build out a space that can adapt to future workforce and multi-tenant requirements. This project is positioned as a significant effort for GSA to not only upgrade its headquarters infrastructure but also to set a new standard for the federal workplace. The project will benefit the taxpayers by revitalizing the building, adding value, and reopening 40% of the building currently sitting idle due to inadequate ventilation. 



Professional Services:



NEPA - GSA has approved this project for NEPA pursuant to AutoCATEX 5.3(j) of the PBS NEPA Desk Guide contingent upon GSA’s compliance with Section 106 of the NHPA and the 2010 EA/FONSI. 



A/E - GSA has hired Shalom Baranes Associates and Perkins & Will, as Architect of Record and Design Architects, respectively. The designs will adhere to the new GSA PBS Core Buildings Standards.



CMa/CxP - An award against a Blanket Purchase Agreement (BPA) will be made for Construction Management for Construction Manager-as-Advisor (CMa) and Commissioning Provider (CxP) services. GSA expects to award a task order this summer.



Art-in-Architecture (AiA) - There will be a concurrent Art-in-Architecture (AiA) project, resulting in new site-specific artwork commissioned for the renovated building. This effort will be led by GSA’s Fine Art Program.  



Project Schedule: This office anticipates award of a contract for these services no later than the second quarter of Fiscal Year 2027. Contract duration is estimated to be 18 - 24 months, with substantial completion in the Fall of 2028. The applicable NAICS code for this requirement is 236220, Commercial and Institutional Building Construction. The Small Business Size Standard is $45M.  



Project Cost: Estimated magnitude of construction: $275,000,000 to $325,000,000.  This project is subject to the availability of funds.  



The Design and Construction Industry Day consists of:



  1. Tuesday, June 2, 2026, 10:00 am – 3:30 pm (please arrive between 9:30am -10am)


  1. Location: Auditorium, 1800 F St. NW Washington, DC 20405.  For virtual attendees, instructions will be provided following registration. 


  1. GSA Presentations


  1. Questions and Answers Session


  1. Networking: Following the GSA presentations, attendees will have the opportunity to network with other attendees. There will also be GSA representatives in attendance who can be consulted about process, doing work with GSA, small business opportunities, etc.


All interested parties, regardless of event attendance, are encouraged to voluntarily submit responses to the questions below (via the link provided), constructive input, or additional questions. Responses are intended to initiate discussion during a facilitated, group question and answer session.



CLICK HERE TO RESPOND TO DESIGN & CONSTRUCTABILITY QUESTIONS TO


INDUSTRY - https://docs.google.com/forms/d/1MG7AFGnhaWmYnr_PNJX_jsNrGLjR-p905JHuSlLEK_E/edit.  Vendors will have the opportunity to ask questions of GSA at the Industry Day event.



This notice does not constitute a solicitation, nor request for any proposal. This announcement


and the Design and Construction Industry Day event is for planning purposes only. The


acquisition strategy for this proposed project has not yet been developed. Response to this


notice is strictly voluntary. The Government will not reimburse any party attending or


participating for costs incurred for this event or marketing efforts.



DISCLOSURE NOTIFICATION AND PROCEDURES. Please do not submit proprietary information. Any information provided may be incorporated into the design and construction of the project. Information submitted in response to this notice is subject to disclosure under the Freedom of Information Act. Respondents are advised that the Government is under no obligation to acknowledge or provide feedback with respect to any information submitted under this notice.  



Prior to the Industry Day on June 2, 2026, the Government may post clarifications, questions, and comments submitted in response to this notice on the www.SAM.gov website without identification of the source. Electronic responses to the expanded list of questions will not be published. 


                     **** NEW ADDITIONAL QUESTIONS WERE ADDED TO REGISTRATION********


                                **** Materials following Industry Day Posted in Sam.gov 6/15/2026****

More opportunities from General Services Administration → Pbs Project Delivery Capital Construction - Branch West

Same awarding agency

NAICS: 236220
Federal
U.S. Department of State Passport Office Construction Services – Salt Lake City, Utah - Presolicitation Notice
Solicitation # DOS_PassportOffice_SLC_UT
The U.S. General Services Administration is planning a design-bid-build construction project to establish a turnkey U.S. Passport Office for the Department of State at the Wallace F. Bennett Federal Building and the Orrin G. Hatch United States Courthouse in Salt Lake City, Utah. The project encompasses approximately 48,000 square feet of work, featuring a new 30,000-square-foot passport office, tenant improvements to relocate five agencies, ABAAS-compliant restroom modifications for the Department of Health and Human Services, and lobby renovations with enhanced security screening. The work will be executed in three consecutive phases: tenant build-outs, demolition and hazardous materials abatement, and the final passport office and lobby construction. Because the facilities will remain occupied, the contractor must coordinate work to minimize disruptions to public access and government operations. The government intends to award a single firm-fixed-price contract using a best-value tradeoff selection approach under FAR Part 15, with an estimated construction value between 20 and 30 million dollars. The procurement will be open for full competition under NAICS 236220. Evaluation will be based on the general contractor's past experience (30%), past performance (25%), technical and management approach (20%), key personnel qualifications (15%), and a small business participation plan (10%). The Request for Proposals is anticipated by September 30, 2026, with a projected award in March 2027 and a performance period of approximately 22 months. Requirements of the Davis-Bacon Act will apply, though a Project Labor Agreement is not anticipated.
Commercial and Institutional Building Construction

POSTED

9 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS