Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on September 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Management at Risk Services

Closed
PE-55080-NONST-2027-000000012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262, with associated upgrades to Buildings 261 and 263, at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms including vanities and lavatories, and updating interior surfaces with level 4 paint finishes. Technical upgrades involve installing raised flooring and electrical distribution for classrooms, implementing simple dimming lighting controls, replacing ceiling fans, and updating variable air volume systems. The project also requires the replacement of doors and life-safety components and the provision of new signage for all spaces. The period of performance is scheduled from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. Award will be based on a best suited then negotiate methodology, evaluating past performance, corporate relevant experience, and price. Offerors must provide payment and performance bonds, and a bid guarantee of 20 percent of the bid price or 3 million dollars is required. Personnel must undergo background checks and adhere to strict security and safety protocols, including ADA compliance and the FLETC Hazardous Waste Management Plan. Invoices are to be submitted electronically to the contracting officer, with payments governed by FAR clauses for fixed price construction contracts and prompt payment.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a fixed-price contract for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes and epoxy mortar flooring, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additionally, the work includes electrical distribution and lighting upgrades, building automation controls, hazardous materials abatement, and site improvements such as drainage upgrades and the removal and replacement of paving. The estimated contract value is between 10 million and 25 million dollars, with a performance period of 730 days after award. The government will evaluate offers based on the lowest price for two primary exhibit line items: building renovation and paving replacement. Bidders must adhere to the Buy American statute and Davis-Bacon Act wage determinations. Bonding requirements are tiered by proposal value, with projects over 150 thousand dollars requiring bid, payment, and performance bonds. Key administrative requirements include the submission of a Contractor Quality Control Plan prior to construction, monthly invoicing via Wide Area WorkFlow, and compliance with ADA accessibility guidelines. Final acceptance of the real property will be documented using DD Form 1354.
Bristol Alliance of Companies

POSTED

about 5 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, categorized under NAICS code 236220, is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. The performance of the work is located in California, specifically within the Riverside or Los Angeles project areas. The solicitation was posted on November 1, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must provide proof of specific outreach and publicity activities to avoid being deemed non-responsive. Mandatory requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must submit proof of utilizing the Small Business Administration and the Minority Business Development Agency. While outreach documentation may be submitted up to three business days after the bid closing, proof of publicity and agency utilization must be included in the initial bid package.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 2 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility with similar structural specifications and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator services, fire protection, plumbing, mechanical, electrical, sitework, and crane operations. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in 28 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform comprehensive water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and plumbing work, including vanity and cabinet replacement. All work must comply with ADA, OSHA, EPA, and NFPA-101 life safety codes, as well as local Massachusetts building ordinances. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within 15 days thereafter. Award will be based on best value, evaluated through price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Prospective bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submission documents include a detailed cost breakdown, a timeline for completion, a 90-day bid guarantee, a valid Massachusetts contractor's license, and certification of compliance with Davis-Bacon Act wage determinations. The contract stipulates Net 30 payment terms and requires a one-year guarantee of workmanship, with a specific 20-year product warranty for LVP flooring.
Grafton Job Corps

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The project is set as a small business set-aside and is subject to the Davis Bacon Act, requiring adherence to wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide a detailed proposal including relevant experience, a comprehensive description of proposed work methods, and itemized pricing broken down by room and trade. Pricing must remain firm for 60 days and include separate costs for materials, labor, permits, and disposal. Awardees are required to provide payment and performance bonding for the full project value, along with general liability and worker's compensation insurance, within ten days of award. Additional deliverables include a project schedule, safety plan, and a minimum one-year workmanship warranty upon completion. Final acceptance is contingent upon the successful testing of all restored mechanical, plumbing, electrical, and life-safety systems.
Career Systems Development Corporation

POSTED

about 5 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The Polk School District is soliciting proposals for Construction Management at Risk services to oversee various renovation, modification, and addition projects across its facilities in Georgia, including Cedartown and Rockmart Middle Schools. The total estimated project value is 25 million dollars, covering an eight-classroom addition, auxiliary gym modifications, HVAC system replacement, athletic field improvements, and general modernization. The selected firm will be responsible for both the preconstruction design phase, providing cost estimates and value engineering, and the construction phase, which includes site management and the development of a master project schedule. The contract will be structured as an actual cost-plus-fee agreement not to exceed a Guaranteed Maximum Price, with a percentage fee capped at 12 percent of actual costs. A 100 percent performance and payment bond is required prior to the award of the GMP contract. Selection is a multi-step process following Georgia Code Title 50 Chapter 22, involving a weighted evaluation of qualifications and potential interviews, where the fee is a contributing but not deciding factor. Proposals are due by October 20, 2026, and attendance at the pre-proposal meeting on October 7, 2026, is mandatory for eligibility.

General Info

Polk School District seeks construction management for $25 million in Georgia facility renovations.

Documents

2
PDF, High priority: read this firstrfp
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Polk School District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Renovations, Modifications and Additions

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS