This Solicitation opportunity from Texas was posted on July 14, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction Manager at Risk for Library Green Landscape Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The University of Texas at Arlington is soliciting proposals for a Construction Manager at Risk (CMAR) to deliver the Library Green Landscape Project under solicitation number FM2026-009, with a total budget limitation of $7,000,000.00. The project includes landscape renovation activities such as natural landscaping, water feature construction, concrete removal, excavation, debris hauling, environmental testing, hazardous materials remediation, utility disconnects, fencing, and equipment rental. The CMAR must adhere to detailed technical standards outlined in the Owner’s Design Guidelines and Facility Programming Guidelines, including compliance with Texas Accessibility Standards, ADA requirements, and the University of Texas System’s Capital Improvement Process. The contract follows a two-step selection process evaluating proposals based on construction safety risk management, CMAR qualifications, technical knowledge of campus conditions, and understanding of the UT System CM-RA Agreement, with award determined by best value based on subjective judgment. Proposals are due by July 14, 2026, at 2:00 p.m. CST, and must include one original and five identical paper copies, one PDF on a flash drive, a separately submitted State of Texas Subcontracting Plan, and comply with strict formatting rules including 11-point font, 30-page limit, spiral binding, and original signatures on key documents. Respondents must certify compliance with numerous state and federal requirements including Executive Order GA-48, franchise tax status, child support obligations, prohibitions on hiring undocumented workers, and criminal background checks for personnel. They must also provide HUB or VetHUB certification, adhere to the Texas Public Information Act, and comply with the Texas Prevailing Wage Law and Ethics and Standards of Conduct (EI-PO-07). The CMAR is responsible for all safety during construction, must maintain required bonds and insurance, and is required to submit progress assessment reports with each invoice using the Comptroller’s template. Subcontracting plans must be approved prior to modification, and subcontractors must be notified of contract details immediately upon award. The project will be performed in Texas, with services commencing after a Notice to Proceed issued within ten days of contract award, and milestones include mobilization, dry-in, substantial completion, final completion, and operational occupancy. All correspondence and questions must be directed to Viki Lewis at vlewis@uta.edu, and vendors must register their interest by emailing their contact information to the same address, while those receiving the RFP from non-off
General Info
Agency
NAICS
Place of Performance
TX, USSet-Aside
Timeline
Submission Closed
