CONSTRUCTION MANAGER-AT-RISK for Texas School for the Deaf Central Plant Renovation Project

Closed
RFQ0007578State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the integration of specialized systems including desiccant dehumidifiers and a dry pipe fire suppression system. All work must comply with UFC 3-600-01, NFPA 13, and JBLM Department of Public Works engineering requirements. The project is estimated between $1 million and $5 million, with a statutory cost limit of $5 million. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must begin within 10 calendar days of the Notice to Proceed, with total completion required within 365 calendar days. The contract requires payment and performance bonds for awards exceeding $150,000 and mandates adherence to prevailing wage rates per General Decision Number WA20260111 for Pierce County. Invoicing is to be processed via Wide Area Workflow.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact the primary point of contact to receive bid documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 2 months
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor/Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution (SCE) project at the Seattle-Tacoma International Airport in Washington. This solicitation is set aside for Small Disadvantaged Businesses under NAICS code 236220. The scope of work is divided into several subsystems, including Phase 1 glass and aluminum systems, vertical transportation for Phase 1 and select Phase 2, and the demolition and installation of passenger loading bridges. Additionally, the package covers the build-out of main electrical rooms, encompassing masonry, drywall, doors, frames, hardware, and miscellaneous metals. Budget ranges for these subsystems vary, with the glass and aluminum systems estimated between 7.5 million and 10 million dollars and passenger loading bridges between 3 million and 4.5 million dollars. The project is governed by a Project Labor Agreement and requires all subcontracts to be executed on standard Hensel Phelps forms. Bidders must submit a bid bond using the provided forms and successful awardees must furnish Small Business Administration Form ID numbers. The solicitation encourages participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses. All subcontractors are required to provide a workers compensation waiver of subrogation. The response deadline for this solicitation is October 14, 2026.
Hensel Phelps

POSTED

about 3 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The comprehensive scope of work spans 1828 calendar days and includes the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. Key construction elements involve reinforced concrete floors, grounding and lightning protection, intrusion detection systems, and specialized foundations utilizing rigid inclusions and load transfer mats. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The project encompasses extensive site work, including clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure improvements include the installation of access roads, paved loading areas, landscaping, and a full suite of electrical utilities such as primary and secondary distribution systems, transformers, and telecommunications. Bidding is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Interested parties must submit their responses by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to official documents.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Texas Facilities Commission is seeking a qualified Construction Manager-at-Risk to deliver pre-construction and construction management services for the Texas School for the Deaf Central Utility Plant South Improvements project at 1102 S Congress Ave in Austin. The project involves a critical upgrade of the existing Central Utility Plant to increase chilled water capacity from 1,600 to 3,000 tons and heating water input from 18,000 to 30,000 MBH, alongside comprehensive replacements of aging mechanical systems installed in 1994. Improvements include replacement of distribution piping, reinsulation of utility trenches, modernization of building pump systems with variable speed drives, optimization of airflow and control sequences, and full commissioning of all integrated systems to enhance energy efficiency and reliability across 20 campus buildings. The estimated Cost of Work is $24,475,000, excluding pre-construction and construction management fees. The procurement follows a two-step process: Step One evaluates firm qualifications and experience on similar large-scale institutional utility projects, with only the top five respondents advancing; Step Two invites those firms for interviews and potential submission of pricing for indirect construction costs. The pre-construction phase is expected to last 180 days, followed by a 460-day construction period, with work required to begin within 15 calendar days of the Notice to Proceed. The total estimated contract term is 640 days. Compliance with mandatory pre-submittal teleconferences is required, and failure to attend results in automatic disqualification. All submissions must be made electronically via the OpenGov portal by the March 17, 2026 deadline for qualifications and April 13, 2026 for pricing, with awards anticipated on May 21, 2026 and contract execution by June 15, 2026. Evaluation is based on a best-value trade-off model, prioritizing technical merit at 80% and price at 20%. Technical evaluation includes experience with comparable utility plant upgrades, proposed methodology and schedule reliability, quality and safety programs, and a verified safety record including Workers’ Compensation EMR. A pass/fail review of litigation history and HUB subcontracting plan compliance is mandatory — failure in either results in immediate disqualification. Respondents must submit a comprehensive Health and Safety Plan, disclose all past or pending litigation, and provide a certified HUB Subcontracting Plan. The CM

General Info

Texas TFC seeks Construction Manager-at-Risk for $24.5M Central Utility Plant upgrades, Austin campus.

Place of Performance

TX, USA

Set-Aside

NONE

Documents

7

Addendum #1: CMR for Texas School for the Deaf (TSD) Central Utility Plant Renovation Project

PDF, High priority: read this firstamendment
High

Attachment D - HUB Subcontracting Plan Forms

PDF, High priority: read this firsthub-subcontracting-plan
High

RFQ 0007578 CMR for TSD Central Plant Renovation

DOC, High priority: read this firstrfq
High

RFQ 0007578 Construction Manager-at-Risk Agreement for Texas School for the Deaf Central Utility Plant

PDF, High priority: read this firstrfq
High

RFQ 0007578: TSD Central Plant Renovation CMR (Addendum 1)

DOCX, High priority: read this firstrfq
High

TFC Texas School for the Deaf CUP South Improvement Project Manual

PDF, High priority: read this firstproject-manual
High

Attachment D - HUB Compliance Reporting System - Online Process Guide

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas Facilities Commission
Office AddressTX, USA

Full Description

Show more
1. SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by theTexas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to provide Pre-Construction and construction management services for Project #25-035-3303, Texas School for the Deaf, Central Utility (CUP) South Improvements project located at 1102 S Congress Ave,Austin, Texas, 78704 hereinafter described as the “Project”. This Project will be administered by TFC. This procurement will be a two-step award process witha two-part work requirement.A. Step One of the solicitation will include a submittal of company experience and qualifications focusing on projects of similar size and type. Respondents will be evaluated on experience and qualifications, as detailed in Section V, Submission Requirements. Only the highest ranked 5 or fewer Respondents will be shortlisted based on this evaluation and invited to participate in interviews. Based on the interviews, the short-listed firms may beinvited to participate in Step Two.B. Step Two of the solicitation will include the short-listed firms participating in interviews. The short-listed firms participating in the interviews may be requested to submit pricing information related to indirect construction costs as detailed in Section V, Submission Requirements.2. COST OF WORK: Respondents to the RFQ should consider the “Cost of Work” as Twenty-four Million Four Hundred Seventy-five Thousand dollars ($24,475,000), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions.3. CONTRACT TERM: Construction is required to commence within fifteen(15) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be One-hundred Eighty (180) calendar days. The construction contract period is projected for a term of four hundred sixty (460) for a total contract term of six hundred forty (640) calendar days except as may be otherwise amended or negotiated.PROJECT DESCRIPTION: The project encompasses a comprehensive upgrade of the existing Central Utility Plant (CUP) and associated infrastructure at the Texas School for the Deaf (TSD) campus. The CUP provides chilled and heating water thermal utilities to twenty buildings, including educational facilities, dormitories, administrative offices, gyms, and the campus auditorium.Due to increasing thermal loads from past and planned campus expansions, the CUP and related systems have reached maximum operational capacity.The proposed improvements are essential to ensuring adequate capacity, system reliability, and energy efficiency to support current and future campus needs.Central Utility Plant (CUP) UpgradesIncrease chilled water capacity from 1,600 tons to 3,000 tonsIncrease heating water system input capacity from 18,000 MBH to 30,000 MBHUpgrade plant ventilation and conditioning systems to support higher performance and system longevityReplacement of aging mechanical components nearing or beyond their service life (original 1994 installations)Site Distribution Piping ImprovementsReplace select sections of existing piping, especially near the CUP, with larger diameter piping to accommodate growing cooling demandReinsulate piping within utility trenches where deterioration is observed, per Texas Facilities Commission reportsImprove distribution efficiency to reduce thermal losses and maintenance costsBuilding Pump System UpgradesReplace outdated building pumps with modern, high-efficiency variable speed systemsIntegrate control sequences compatible with the upgraded CUP systemsReconfigure outdated piping and valve arrangements to improve flow distribution and achieve proper ΔT (temperature differential) across the networkAncillary Work and System OptimizationEvaluate and rebalance exhaust and outside airflows to enhance building ventilation and energy efficiencyRevise control sequences to reduce unnecessary cooling/heating loads from over-ventilation and outdated automation logicConduct comprehensive system commissioning and testing to verify proper operation and integration across all connected buildings1. ASBESTOS ABATEMENT: For the consideration of this RFQ, TFC is assessing any known asbestos materials in the existing facility to be abated prior to demolition and construction. Any asbestos abatement of the building is to be considered outside of the construction contract and budget of this RFQ. Any required abatement will be either negotiated with the CMR awarded the contract or addressed by TFC separately.THIRD PARTY TESTING: TFC shall provide or contract with third party for Testing and Balancing Services, RAS Review, Commissioning from a Commissioning Authority (CxA), Building Enclosure Commissioning (BECx), and Construction Materials Testing1. SCHEDULEOF EVENTS: TFC reserves the right to change the dates shown below upon written notification.EVENTDATEIssue RFQ2/18/2026Mandatory Pre-Submittal Teleconferences1st PSC2nd PSC 2/24/2026, 10:30 AM CT2/25/2026, 10:00 AM CTDeadline for Submission of Questions3/3/2026Deadline for Submission of Qualifications and HSP3/17/2026, 3:00 PMNotification of Short List/Interview Selection3/27/2026Site Visit4/02/2026Interviews4/06/2026,Deadline for Submission of Step 2 Pricing Proposals4/13/2026, 3:00 PMAward by Commission5/21/2026, 9:00 AMExecute Contract6/15/20262. MANDATORY PRE-SUBMITTAL TELECONFERENCES: Mandatory pre-submittal teleconferences will beheld on Tuesday, February 24, 2026 at 10:30 AM CT and Wednesday, February 25, 2026 at 10:00 AM CT. Pre-registration is required to participate in the teleconference. Respondents must have an employee of their firm attend at least one (1) of the two (2) pre-submittal conferences. TFC shall reject qualifications submitted by firms that did not attend one of the mandatory pre-submittal conferences.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS