CONSTRUCTION MANAGER-AT-RISK for TSBVI GENERATORS AND HVAC REPLACEMENTS

Closed
0008612State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
The Building 262 Renovation project at the Federal Law Enforcement Training Center in Glynco, Georgia, is a single firm fixed price contract for comprehensive interior modernization. The scope of work includes replacing corridor and classroom flooring with composite modular materials, fully renovating restrooms with new vanities and lavatories, and updating interior surfaces with new paint and signage. Technical upgrades involve installing raised flooring and electrical distribution, implementing simple dimming controls, replacing ballasts, lamps, and ceiling fans, and replacing variable air volume systems. The project also requires correcting plumbing deficiencies and ensuring all work adheres to ADA accessibility guidelines and seismic-resisting system standards. The performance period is scheduled from January 11, 2027, to March 11, 2028, with a total delivery timeline of 425 calendar days after the notice to proceed. Award will be determined using a best suited negotiate methodology, evaluating price alongside past performance and corporate relevant experience. The successful contractor must provide performance and payment bonds equal to 100 percent of the contract price and adhere to prevailing wage rates. Key administrative requirements include submitting submittals within 14 days of award, providing a comprehensive safety plan, and managing all construction and demolition waste.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 11 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration with new finishes, and the installation of updated HVAC, exhaust extraction, compressed air, and NFPA-compliant fire suppression systems. Additional requirements include the replacement of electrical distribution, lighting, low-voltage systems, and building automation controls, as well as site improvements such as paving, drainage upgrades, and hazardous materials abatement. The work is divided into two primary pricing line items: building renovation and the removal and replacement of paving. The contract has an estimated value between 10 million and 25 million dollars, with a performance period of 730 days after award. Award will be based on the lowest price. Bidders must submit responses by November 23, 2026, and an optional pre-bid meeting is scheduled for November 2, 2026. The project mandates strict adherence to quality control through a three-phase control process and requires a Contractor Quality Control Plan approved by the Contracting Officer. Bonding requirements are tiered, with proposals over 150,000 dollars requiring bid, payment, and performance bonds. Compliance with the Davis-Bacon Act, Buy American requirements, and ADA accessibility guidelines is mandatory. Invoicing must be processed through Wide Area Work Flow using NAVFAC Form 4330/54.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 25 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 28, 2026, with a response deadline of November 4, 2026. A critical component of this contract is strict adherence to Disadvantaged Business Enterprise Good Faith Efforts (GFE) to secure project financing. Bidders must complete six specific GFEs prior to the bid opening date to avoid being deemed non-responsive. Mandatory requirements include providing proof of public notification via an online publication for 30 consecutive days and a print newspaper for one day, as well as evidence of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the closing date, failure to include the required publicity and agency assistance proof within the initial bid package will result in disqualification.
RT CONTRACTOR CORP

POSTED

about 3 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 3 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a water damage restoration project at Building 17 of the Grafton Job Corps Center in North Grafton, Massachusetts, operated by Adams and Associates, Inc. for the U.S. Department of Labor. The project aims to restore the first, second, and third floors to their original condition following a fire sprinkler discharge. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, and necessary electrical and vanity/cabinet repairs. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, EPA, and local Massachusetts building codes. The contract is a small business set-aside and requires a single lump sum bid, though the lowest price does not guarantee an award. Evaluation is based on best value, weighted by price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Required submissions include a detailed cost breakdown, a timeline for substantial completion, a 90-day bid guarantee, a Massachusetts contractor's license, and wage rate certification. The contract is subject to the Davis-Bacon Act and Executive Orders regarding minimum wage and paid sick leave. Contractors must provide proof of automobile liability insurance naming Adams and Associates, Inc. as an additional insured. Payment terms are Net 30. Key deliverables include a sequenced construction schedule due within 14 days of the Notice to Proceed and a final punch list to be corrected within 14 days of the substantial completion walk-through.
Grafton Job Corps

POSTED

about 3 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, including sixteen residential rooms and bathrooms, common areas, and mechanical and utility rooms. The scope of work involves drywall installation, joint finishing, and painting, as well as the temporary removal and re-installation of HVAC equipment. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring that fire resistance and equipment clearances are maintained throughout the process. The project is subject to the Davis Bacon Act, requiring compliance with wage determination OR20260100 and the submission of weekly certified payrolls. Proposing contractors must provide itemized pricing, a detailed work plan including project phasing and occupied-building protection, and evidence of relevant experience. Award requirements include providing payment and performance bonding for the full project value, along with liability and worker's compensation insurance, within ten days of award. Final acceptance by CSD is contingent upon the successful testing of restored mechanical, plumbing, electrical, and life-safety systems, the removal of all debris, and the provision of a minimum one-year workmanship warranty.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 22 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project located at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the installation of overhead cranes, reinforced concrete floors, grounding and lightning protection, and intrusion detection systems. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The technical requirements encompass extensive sitework, including clearing, rock excavation, grading, and the implementation of rigid inclusions and load transfer mats for foundations. Due to the impact on existing wetlands, mitigation efforts are required. Infrastructure improvements include new access roads, paved loading areas, landscaping, and a complete electrical utility system featuring primary and secondary distribution, transformers, and telecommunications. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and access necessary documentation.
J & J Contractors, Inc

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Texas Facilities Commission is seeking a qualified Construction Manager-at-Risk to execute Project #25-005-4201 and 25-005-2567 at the Texas School for the Blind and Visually Impaired in Austin, Texas, involving the installation of backup generators and replacement of HVAC systems across multiple campus buildings. The project includes the addition of four generators to provide partial or full backup power for non-life safety but essential operations, with three of those buildings designated as Shelter-in-Place facilities to ensure student comfort and safety during extended power outages. Additionally, thirty-two rooftop Aaon HVAC units across ten buildings, eight split-system units on Building 610, and three on Building 509 will be replaced, along with the installation of five new water heaters. The estimated cost of the work is $7 million excluding pre-construction and construction management fees, with a projected timeline of 120 days for pre-construction activities and 360 days for construction, subject to adjustments to align with the school calendar to minimize disruption. The contract follows a one-step award process requiring respondents to submit qualifications and pricing in a structured format through the TFC OpenGov portal, with submissions must include a Bid Bond of $25,000 and be organized into four distinct packages covering execution, HUB compliance, scored qualifications, and pricing. The procurement is governed by Texas Government Code Chapter 2269 and mandates compliance with Buy America requirements for all iron and steel products, adherence to prevailing wage laws, and full compliance with safety regulations under Public Law 91-596 and Texas labor codes. A HUB Subcontracting Plan is mandatory, with a utilization goal of 21.1%, and failure to submit a complete and compliant plan results in automatic rejection. Contractors must maintain rigorous records in accordance with Generally Accepted Accounting Principles and Texas State Auditor’s Office standards, and are subject to audit by TFC, the State Auditor’s Office, or the Attorney General. Insurance requirements include workers’ compensation, employer’s liability coverage of $1 million per category, and liability coverage as specified, with performance and payment bonds required if the contract sum exceeds $100,000 and $25,000 respectively, potentially capped at the Guaranteed Maximum Price. The evaluation is based on best value, with experience and qualifications weighted at 40%, methodology and budget/schedule compliance at 30%, compensation and fees at 2

General Info

Texas Facilities Commission seeks CMR for $7M generator and HVAC upgrades at TSBVI campus.

Agency

Texas Facilities Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

7

Addendum #1 RFP 0008612 CMR for TSBVI Generators and HVAC Replacement Q&A

PDF, High priority: read this firstamendment
High

RFP 0008612 CMR for TSBVI Generators and HVAC Replacements

DOC, High priority: read this firstrfp
High

RFQ 0008612 Construction Manager-at-Risk Agreement for TSBVI Generators and HVAC Replacements

PDF, High priority: read this firstrfq
High

Texas School for the Blind and Visually Impaired Project Manual 2552.01

PDF, High priority: read this firstproject-manual
High

Attachment H - O'Connell Robertson Letter on TSBVI Construction Scope 04.01.2026

PDF, Low priorityother
Low

RFP 0008612 TSBVI Pre-Proposal Conference Registrants

PDF, Low priorityother
Low

ESBD_508547_1777918923906_Attachment D - HUB Subcontracting Plan Forms.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas Facilities Commission
Office AddressTX, USA

Full Description

Show more
1. SCOPE: In accordance with the provisions of Texas Government Code, Chapter 2269, Subchapter F, Construction Manager-at-Risk Method, and Rules and Procedures adopted by the Texas Facilities Commission (TFC), TFC is requesting qualifications for a Construction Manager-at-Risk (CMR) to perform the work required for Texas School for the Blind and Visually Impaired (TSBVI) Generators and HVAC Replacements. The Generators are added for whole or partial back-up of non-Life Safety, but necessary power generation for long-term power outages in four (4) priority buildings, three (3) of which are intended to be used as Shelter-in-Place buildings to accommodate the comfort and safety of live-in students during these periods of time. The fourth (4th) building upgrades the backup equipment already in place for the operations of the campus. This project also replaces thirty-two (32) Roof-top Aaon HVAC units on ten (10) buildings (assorted tonnages), eight (8) split-system HVAC units on Building 610 and three (3) split-system HVAC units on Building 509. Five (5) water heaters in five different buildings are also included. This work will hereinafter be described as TFC Project #25-005-4201 & 2567 (the Project). The TSBVI campus is located at 1100 W 45th St, Austin, TX 78756. This Project will be administered by TFC. This procurement will be a one-step award process with a two-part work requirement.2. COST OF WORK: Respondents to the RFP should consider the “Cost of Work” as seven million dollars ($7,000,000.00), not including any Pre-construction Management fees, Construction Management fees, and Construction General Conditions3. CONTRACT TERM: Construction is required to commence within twenty-one (21) calendar days after the Notice to Proceed for Construction is issued. For planning purposes, the pre-construction time period is estimated to be one-hundred twenty (120) calendar days. The construction contract period is projected for a term of three hundred sixty (360) calendar days which should include lead time on equipment manufacture and delivery, but may be otherwise be amended or negotiated by TFC to suit the School calendar and minimize the disruption of the students.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS