This Solicitation opportunity from Massachusetts was posted on October 8, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The contract involves the construction of a new District Four Administration Building located on Appleton Street in Massachusetts, with an estimated project value of approximately 43.8 million dollars. The project is currently not open for bidding and is not available through CommBuys, indicating that interested parties should refrain from submitting bids at this time. The solicitation was posted on October 8, 2024, with a deadline for responses set for December 10, 2024. The project falls under the NAICS code 236220, which pertains to commercial and institutional building construction, and is managed by the Massachusetts Department of Transportation, a State and Local Government Entity.
The primary point of contact for this contract is the Construction Unit, reachable via email at [email hidden] or by phone at [phone hidden]. The contract scope and details are accessible through the provided link, though the project is currently not open for bidding, and interested parties are advised to monitor updates for future opportunities or further instructions related to this project.
HighAI Summary for 605850-128297 Addendum No. 2 - District Four Administration Building: Addendum No. 2 dated October 31, 2024, for the construction of a New District Four Administration Building on Appleton Street. This document provides responses to contractors' questions regarding bid access via BidX, the division of responsibilities between HVAC and demolition subcontractors for selective demolition, and the installation of the radon mitigation system.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for 605850-128297 Addendum No. 4 - Arlington District Four Administration Building: Addendum No. 4 dated November 15, 2024, for the construction of a New District Four Administration Building on Appleton Street in Arlington. This document postpones filed sub-bid openings to December 3, 2024, and general bid openings to December 17, 2024. It includes revisions to the cover, multiple documents (00010, 00108, 00715), architectural and structural drawings, and provides formal responses to contractors' questions regarding insurance, fire alarm systems, glass specifications, and certification requirements (AISC and AWI).
PDF
PDF, High priority: read this firstpresolicitation
HighAI Summary for 605850 - Arlington District Four Administration Building Construction: Notice to Contractors issued September 28, 2024, for the construction of a new District Four Administration Building in Arlington (Project 605850). The project value is $43,819,000.00. It specifies deadlines for filed sub-bids (Nov 26, 2024) and general bids (Dec 10, 2024), both submitted via Bid Express. The document outlines prequalification requirements via MassDOT and DCAMM certification, bid bond requirements (5%), and provides a detailed list of sub-bid items including electrical, plumbing, and HVAC work.
PDF
PDF, High priority: read this firstsow
HighAI Summary for A00801 - Arlington District Four Administration Building Special Provisions: Special Provisions for the construction of a new 47,500 sq. ft. District 4 Administration office building in Arlington. The project features a Zero Net Energy design with Passive House Certification, solar PV arrays, and phased demolition of existing structures. It includes specific labor participation goals, a 1002-calendar day performance period, and detailed compliance requirements with MassDOT and MA state building codes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00802 - Construction Specifications Part 2: This document contains technical construction specifications for Proposal No. 605850-128297, specifically covering Division 20 through Division 50. It includes Section 200000 (Common MEPFP Requirements), detailing general provisions, definitions, and requirements for fire suppression, plumbing, HVAC, electrical, communications, and electronic safety and security disciplines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for A00815 Maint Contracts Work-Zone-Safety Guide (December 2017): A technical guide for planning and installing temporary traffic controls for maintenance, utility, or short-term construction work (10 hours or less). Based on FHWA MUTCD and Massachusetts Amendments, it provides detailed diagrams for stationary, mobile, and emergency response operations, as well as guidelines for traffic control device placement and responsibilities.
TXT
TXT, High priority: read this first1 page · specifications
HighAI Summary for Contract 128297: Construction of New District Four Administration Building: A schedule of operations and bid item list for the construction of the District Four Administration Building on Appleton Street in Arlington. The document details a fixed-price schedule of $160,000 and lists specific line items including electrical, plumbing, HVAC, masonry, demolition of Building No. 4, and soil disposal requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Policy Directives P-22-001 and P-22-002 (Rev 12-20-23): MassDOT policy directives establishing procedures for the off-site stockpiling of soil from construction projects (P-22-001) and the use of MassDOT property for staging and construction-related operations (P-22-002). P-22-001 mandates soil characterization, minimum 500-foot buffers from residential receptors, and specific stockpile management requirements. P-22-002 requires Non-Vehicular Access Permits for the use of MassDOT property for staging and storage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Project #605850 - District 4 Administration Building Construction Specifications: Construction specifications (Part 1, Divisions 01-14) for the District 4 Administration Building located at 519 Appleton Street, Arlington, MA, prepared for the Massachusetts Department of Transportation. Dated August 30, 2024, the document includes a project manual, list of consultants, and detailed technical sections covering general requirements, existing conditions, concrete, masonry, and metals.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Proposal 605850-128297 Addendum No. 1 - Arlington District Four Administration Building: Addendum No. 1 dated October 23, 2024, for the construction of a New District Four Administration Building on Appleton Street in Arlington. This amendment transmits a revised page 1 of Document 00718, which outlines the Special Provisions for M/WBE and SDVOBE participation, including a 13% M/WBE participation goal for Design-Bid-Build projects.
PDF
PDF, Low priorityspecifications
LowAI Summary for A00805 - Hazardous Building Materials Inspection Report (519 Appleton Street): A hazardous building materials inspection report prepared by Atlas Technical Consultants LLC for the Massachusetts Department of Transportation. Dated December 5, 2023, the document details a supplemental survey for asbestos-containing materials (ACM) and lead-containing paints at 519 Appleton Street, Arlington, MA, to support planned demolition activities.
PDF
PDF, Low priorityother
LowAI Summary for Contract 128297 - MassDOT AutoCAD Files Release Form: A release form from the Massachusetts Department of Transportation (MassDOT) for the request of AutoCAD files related to the construction of a New District Four Administration Building on Appleton Street (Contract 128297). The document outlines the conditions of custody, stating that files are provided 'as is' and that the conformed contract documents remain the only legal documents for the project.
PDF
PDF
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Construction of a New District Four Administration Building on Appleton Street (605850)
SEE NTC. This project is currently not available for bidding.
Please do not use CommBuys to bid on this project.