Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Florida was posted on June 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction of Center Hill Bridge/Culvert

Closed
ITB-25-013-0-2025/CEState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utility installation involving tunneling, boring, jacking, and micro tunneling, as well as site work such as land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and signals, along with environmental support services including storm water pollution prevention and waste management. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Quotes are due by November 18, 2025, and should be submitted through the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 8 hours ago

DEADLINE

in 6 days
NAICS: 237310
New
SLED
803_2027 PLANT MIX - PRIMARY
Solicitation # CM827PMA129935
The Virginia Department of Transportation (VDOT) is soliciting bids for contract CM827PMA129935, titled 2027 Plant Mix - Primary, which involves the production and placement of Thin Hot-Mix Asphalt Concrete Overlay (THMACO) and Balanced Mix Design (BMD) surface asphalt concrete across various locations, specifically including Route 42. The scope of work includes the application of tack coat, sinusoidal asphalt rumble strips, and pavement markings, as well as flexible pavement planing. Contractors must be prequalified to bid and are required to submit a Job Mix Formula (JMF) for approval at least two weeks prior to production. Key technical requirements include meeting Performance + Volumetric Optimized criteria for specific mix types and ensuring a minimum film thickness of 9 microns. The contract is subject to several federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Build America, Buy America Act (BABA). Contractors must comply with non-discrimination and equal opportunity provisions and are encouraged to partner with Small, Women-owned, and Minority-owned (SWaM) businesses. Administrative requirements include the use of a VDOT-approved inventory tracking system and the submission of performance test results via the PLAID website within 48 hours of sampling. Payment is structured through monthly progress estimates based on the contractor's name, with interest accruing at one percent per month. Liquidated damages for violations of the Contract Work Hours and Safety Standards Act are set at $33 as of January 15, 2025.
Virginia Department of Transportation

POSTED

about 22 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the construction of a 144-foot-long culvert bridge spanning Payne Creek in Hardee County, Florida. The project includes installing multiple aluminum culverts of varying diameters—two 14-foot, four 10-foot, and one 8-foot culvert—each with concrete headwalls. Additionally, approximately 500 feet of roadway on both the north and south sides will be reconstructed and paved to align with the new bridge's elevation, which will be approximately two feet higher than the existing roadway. Guardrails will be installed along the entire length of the roadway and bridge for safety. Bids must be submitted in sealed form to the Hardee County Board of County Commissioners by 2:00 PM on July 28, 2025, with late submissions disqualified. Bidders are responsible for ensuring timely delivery of their bids, whether by mail or other carriers. The project scope and detailed requirements are outlined in the bid documents, and interested parties can find additional information through the provided online link. The contract is valued between one million and five million dollars and is managed by Hardee County, Florida.

General Info

Place of Performance

FL, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyFlorida → Hardee County
ContactsNo contacts available
OfficeN/A
Organization / AgencyFlorida → Hardee County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The work of this contract generally consists of the construction of a 144 ft. long culvert bridge across Payne Creek in Hardee County, Florida. The culvert bridge will consist of Two (2) - 14 ft. diameter aluminum culverts, Four (4) - 10 ft. diameter aluminum culverts and One (1) - 8 ft. diameter alumiAnum culvert, with concrete headwalls. Additionally, approximately 500 feet of the roadway on the north and 500 feet on the south shall be reconstructed and paved, to match the elevation of the new bridge which is to be approximately 2 feet higher than the existing roadway. Guardrails shall be constructed on both sides of the roadway and bridge for the entire length. Sealed Bids will be received by the Hardee County Board of County Commissioner located at the Capital Project’s Conference Room, 205 Hanchey Road, Wauchula, Florida 33873 until 2:00 PM local time on July 28, 2025. Bids received after said time will be disallowed and not considered for bid award. The Bidder shall be solely responsible for delivery of their Bid. Reliance upon mail or public carriers is at the Bidder's risk. Please see uploaded bid document for the full scope of work, and project details.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS