Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on July 7, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Of Mooring Cells

Closed
W912P5-16-B-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

about 14 hours ago

DEADLINE

in 22 days
NAICS: 238120
New
SLED
Corpyard Phase II Connex Structural Anchoring & Welding: (Rebid)
Solicitation # 26-091-ITB
The City of West Sacramento has issued solicitation 26-091-ITB for the Corpyard Phase II project, which requires the structural anchoring and welding of 14 existing shipping containers to a cement-treated asphalt surface. The scope of work includes container pre-checks, drilling and hole cleaning, the installation of Bolthold asphalt substrate, bolting down ASTMA36 plates using epoxied steel rods, and performing AWS welding to secure the plates to the container framing. To prevent corrosion, the contractor must apply a zinc-rich cold galvanizing rust-inhibiting coating. All work must be performed by a licensed contractor holding a current California C-51 or C-60 license and must adhere to PSE stamped drawings, structural calculations, and standards including ASCE 7-22, CBC 2022, and AISC 360-16. Final acceptance is contingent upon a successful inspection by the City's Building department. The estimated project value is 35,000 dollars, and the contract will be awarded to the lowest responsive and responsible bidder. Bids must be submitted electronically via the OpenGov portal by November 10, 2026, at 1:00 pm, and must include a bid security of at least 10 percent of the total bid price. The successful bidder is required to provide performance and payment bonds equal to 100 percent of the contract price and must comply with California prevailing wage requirements and DIR registration. Additionally, the contractor must utilize the Virtual Project Manager system for submittals and maintain comprehensive insurance coverage, including Commercial General Liability and Workers Compensation. As a federal-aid construction project, the contract mandates strict adherence to FHWA-1273 provisions, including nondiscrimination and equal employment opportunity policies.
Capital Projects - Construction

POSTED

about 18 hours ago

DEADLINE

in 13 days
NAICS: 238120
New
SLED
EVA DELL BARRIER ACCESS GATES
Solicitation # MS27-052
The City of Victorville is soliciting competitive bids under solicitation MS27-052 for the fabrication and installation of four steel barrier access gates at Eva Dell Park. The project requires a licensed C-13 contractor to provide all labor and materials to install one 31-foot gate, one 35-foot gate, and two 37-foot gates, all constructed from Schedule 40 steel pipe. The contract will be awarded to the lowest responsible bidder who attends the mandatory pre-bid meeting and site walk held on November 10, 2026. Final responses are due by December 3, 2026. As a project funded by the Community Development Block Grant (CDBG) program, strict compliance with the Davis-Bacon Act and California state prevailing wage laws is required, with the higher of the two rates applying. Contractors must submit weekly certified payroll reports using Form WH-347 and adhere to Build America, Buy America (BABA) provisions and California Air Resources Board regulations. Additionally, the successful bidder must divert at least 65 percent of non-hazardous construction and demolition debris from landfills. Financial security requirements include a bid guarantee of at least 10 percent of the total proposal amount, with the winning contractor required to provide Faithful Performance and Payment Bonds for 100 percent of the contract price. The contractor must also provide a guaranty bond covering defective materials or workmanship for twelve months following City acceptance. Compliance with the Americans with Disabilities Act (ADA) and various federal and state non-discrimination and affirmative action policies is mandatory.
City of Victorville

POSTED

about 23 hours ago

DEADLINE

in about 1 month

General Info

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

Watts Bar Lock, TN, USA

Set-Aside

NONE

Documents

1

RFI - Watts Bar Lock Mooring Cells Construction

PDF, Low priorityrfi
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Nashville
Contacts1 person available
OfficeNASHVILLE, TN, 37203-1070, USA
Office AddressNASHVILLE, TN, 37203-1070, USA
Contacts

Full Description

Show more
REQUEST FOR INFORMATION The Government is issuing this Request for Information to determine a competitive basis. This is not a solicitation. This questionnaire is for market research purposes only. Only contractors capable of performing this type of work should respond to this Request for Information Requirement The Nashville District U.S. Army Corps of Engineers (USACE) anticipates a requirement for a firm fixed-price construction contract to accomplish the following work* at Watts Bar Lock, TN: 1. General Requirements: This description represents the minimum work necessary to construct three mooring cells. Contractor shall provide labor and all necessary materials to construct three steel sheet pile mooring cells with protection fenders and mooring ring assemblies at the location specified by the government. Mooring cells are used to assist towing vessels transiting locks. Cells shall be constructed in accordance with accompanying drawings. 2. Special Requirements: a. Fabrication of 30' diameter template. b. Floating plant consisting of a towboat with minimum of 2,000 horsepower, derrickboat with 100 ton lifting capacity, and vibratory hammer. c. New mooring cells are replacements for existing cells that are no longer serviceable. Existing cells shall be removed by contractor prior to construction of new cells. New cells shall be constructed in the approximate footprint of existing cells. Distance between each cell shall remain the same. d. All steel piling and hardware extracted during the removal of the existing cells shall be considered scrap. Contractor shall be responsible for the proper disposed of all sheet metal and other metal material from the existing cells. e. Contractor shall make every effort possible to minimize impact of cell removal and construction on passage of navigation traffic. f. All work shall be performed to acceptable industry standards that include, but are not limited to, the American Welding Society and American Institute of Steel Construction. All welders must be certified and qualified to weld vertical fillet welds (3F). 3. Removal of Existing Cells: a. Contractor shall be responsible for the proper and legal disposal of all sheet pile and other metal materials. b. Fill material shall be removed and stockpiled for reuse in new cells. Only river-run or crushed stone may be used as fill material in the new cells. All trash and scrap steel removed from the cells shall be properly disposed of. c. Steel fenders, ring assemblies and sheet piling shall be completely removed. 4. Construction of New Mooring Cells: a. New cells shall be constructed such that their docking surface is aligned with the docking surface of the long approach wall of the main lock. Cells shall be constructed of new PS27.5 steel sheet piling (ASTM A328 Grade). Splicing of sheets to obtain the required length is not permitted. Sheet piling for new cells shall be driven until refusal. Top of sheet piling shall be as shown on drawings. b. Cells shall be approximately 30 feet in diameter. c. Fill material from existing cells may be reused in new cells. Contractor shall supplement reused material with new material as necessary to obtain required fill level. d. Steel fenders shall be installed and spaced as shown in the drawings. e. Mooring ring assemblies shall be installed as shown on the drawings. f. Band numbers 3 and 7 shall extend the complete circumference of the cell. g. The face of mooring cells shall be painted with silver stripes as shown on the drawing's "Painting Detail". 5. Options: a. This procurement may include a base and three options. *Please note that this description is subject to change.

More opportunities from Department Of Defense → W072 Endist Nashville

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS