Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 25, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Solicitation for Construction of 35th ID Readiness Center, Fort Leavenworth, Kansas

Closed
W912JC-18-R-5702Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Federal
PN 110205 - SOS Hangar Renovation - Progressive-Design-Build OT
Solicitation # W912PM279A001
The U.S. Army Corps of Engineers is issuing a draft program solicitation for the renovation of Hangar 750 at Pope Army Airfield, Fort Bragg, North Carolina. This project supports an Air Force Special Operations Command squadron mission and involves the comprehensive architectural and MEP build-out of ground floor aircraft maintenance bays, the integration of exterior hangar doors, and the construction of second-floor administrative and high-security operational spaces. The scope includes the installation of Level 2 wet-pipe fire suppression, intrusion detection systems, electronic access control, and full furniture, fixtures, and equipment packages. This procurement is conducted as an Other Transaction Agreement under 10 USC 2808a, meaning it is not subject to the Federal Acquisition Regulation. The project follows a Progressive Design-Build approach divided into two stages: Phase 1 focuses on design and pre-construction services, while Phase 2 covers final design and construction via a Fixed Price model based on a negotiated Guaranteed Maximum Price. The government has established an affordability cap of 35 million dollars as a material requirement, and the selected firm must be capable of providing performance and payment bonds of at least 35 million dollars. Selection is based on a qualifications-based methodology involving a two-step process: an initial evaluation of White Papers followed by Pitch Presentations for a target of three highly qualified teams. All team members must be registered in the System for Award Management with a valid Unique Entity Identifier. Additionally, the successful Design-Builder must comply with Cybersecurity Maturity Model Certification (CMMC) requirements as codified in 32 CFR Part 170, including a positive self-assessment and signed attestation of security controls. Submissions must be made through the PIEE Solicitation Module.
W074 Endist Wilmington

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 236220
New
Federal
Z1DA-- 460-26-004 | Wilmington VAMC Roof Replacement | NCO 4 Construction East (VA-26-00029152)
Solicitation # 36C24426B0015
Solicitation 36C24426B0015 is a firm-fixed price construction contract issued by the Department of Veterans Affairs Network Contracting Office 4 for the removal and replacement of Roof 3D, the Physical Therapy Roof, Roof 10, and Roof 11 at the Wilmington VA Healthcare System in Delaware. The project has an estimated magnitude between $250,000 and $500,000 and is set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB). The scope of work includes demolition of existing roofing and insulation, installation of 60 Mil Elevate RubberGard EPDM LS-FR white low-slope fire retardant roofing material or equivalent, and the repair of roof drains. The completed installation must meet high wind zone design requirements and include a minimum 20-year warranty against leaks. Award will be granted to the responsive and responsible bidder offering the lowest price. Eligible bidders must be registered in SAM, VETCERT, and the VETS-4212 database. The contractor is required to provide performance and payment bonds and adhere to Davis-Bacon Act Wage Determination DE20260008. Strict safety standards are mandated, including the presence of an OSHA-certified competent person on-site and 10-hour OSHA certification for all employees. Performance must begin within 10 calendar days of award and be completed within 30 calendar days, with work performed Monday through Friday from 7:00 AM to 5:00 PM. Following multiple amendments, the final bid opening was rescheduled for October 21, 2026.
244-NETWORK Contract Office 4 (36C244)

POSTED

about 4 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
Federal
Source Sought 36C25627Q0020_564-610 NIPMHB Nurses Call, Boilers, and Rigid Vinyl Sheet
Solicitation # 36C25627Q0020
The Department of Veterans Affairs, through Network Contract Office 16, is conducting market research via a Request for Information to identify qualified Service-Disabled Veteran-Owned Small Businesses (SDVOSB) and Veteran-Owned Small Businesses (VOSB) for a construction project at the Veterans Health Care System of the Ozarks in Fayetteville, Arkansas. The project, identified as Project 564-610, involves repairs and installations at the New Inpatient Mental Health Building (Building 49). The scope of work includes the installation of two electric backup boilers with associated piping, pumps, and electrical work, the application of Inpro Palladium Rigid Vinyl Sheet, and the installation of 3/8 inch interior tempered safety glazing for nurse station partitions. The government anticipates awarding a single, firm-fixed-price contract with an estimated magnitude between 250,000 and 500,000 dollars. The period of performance is 210 calendar days from the Notice to Proceed. All work must be performed without disrupting medical center operations and must adhere to the latest NEC, NFPA, and OSHA standards, including the development of an Infection Control Risk Assessment. Personnel are required to have a negative TB test within 90 days of starting work and a minimum OSHA 10 certification. Interested firms under NAICS code 236220 must provide a capability statement, proof of ability to obtain performance and payment bonds up to 500,000 dollars, and details of three relevant recent projects. Responses must be submitted to the Contracting Officer by November 3, 2026.
256-NETWORK Contract Office 16 (36C256)

POSTED

about 4 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The U.S. Property and Fiscal Office for Kansas plans to issue a Request for Proposal to award a single firm fixed-price contract for constructing a new National Guard Readiness Center Building for the 35th Infantry Division in Leavenworth, Kansas. The project includes building a Readiness Center with up to 102,672 gross square feet and a detached Maintenance Bay building of up to 5,359 gross square feet. The scope covers all necessary labor, materials, tools, equipment, and supervision for construction, including site infrastructure such as access roadways, parking lots, security lighting, utilities, and stormwater management. Specific brand requirements are mandated for door lock cores and building control systems, limiting the use of substitute products. The base contract includes various supporting architectural and site components, while multiple options requiring separate pricing include enhancements such as asphalt pavement for a parking lot, terracotta architectural precast panels, metal lockers, operable partitions, dock lift installation, window roller shades, terracotta window sunscreens, site furnishings, an additional maintenance training building, audio-visual systems, and a generator installation. The contract duration is set at 24 months following the Notice to Proceed, with an estimated project value ranging between $25 million and $100 million. The solicitation will be unrestricted but includes a HUBZone preference and requires a Small Business Subcontracting Plan from large business offerors. The planned solicitation release date was on or about June 1, 2018, with a pre-proposal conference tentatively scheduled for June 11, 2018, and proposals due by approximately July 8, 2018. Evaluation factors for award include technical capability, price reasonableness, and past performance, with potential award without discussions unless deemed necessary. Interested contractors must be registered in the System for Award Management (SAM) and access solicitation documents through the official federal acquisition portal. All amendments and communications will be posted electronically, and written inquiries are to be submitted per solicitation instructions.

General Info

Fixed-price contract for constructing National Guard Readiness Center and Maintenance Bay, Kansas, with strict brand requirements.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

8 Sherman Avenue, Fort Leavenwoth, KS, 66027, USA

Set-Aside

NONE

Documents

24

35th ID National Guard Readiness Center - Amendment No. 2

PDF, High priority: read this first23 pages · amendment
High

35th ID National Guard Readiness Center - Amendment No. 3

PDF, High priority: read this first6 pages · amendment
High

35th ID National Guard Readiness Center - Contract Amendment No. 4

PDF, High priority: read this first3 pages · amendment
High

35th ID National Guard Readiness Center - Drawings V1 Set 1

PDF, High priority: read this first3 pages · specifications
High

35th ID National Guard Readiness Center - Fire Alarm and Telecom Drawings

PDF, High priority: read this first32 pages · specifications
High

35th ID National Guard Readiness Center - Mechanical Drawings V2 Set 5 of 7

PDF, High priority: read this firstspecifications
High

35th ID National Guard Readiness Center - Specifications Volume 1

PDF, High priority: read this first903 pages · specifications
High

35th ID National Guard Readiness Center - Specifications Volume 2

PDF, High priority: read this first665 pages · specifications
High

35th ID Readiness Center - Bid Options

DOC, High priority: read this first83 pages · amendment
High

35th ID Readiness Center Solicitation Contract Form

DOC, High priority: read this first82 pages · rfp
High

Amendment No. 1 - 35th ID National Guard Readiness Center (Project No. 200101)

PDF, High priority: read this first18 pages · amendment
High

Exhibit A Performance Relevancy Questionnaire

DOC, High priority: read this first2 pages · past-performance
High

Exhibit C - Past Performance Questionnaire

DOC, High priority: read this first6 pages · past-performance
High

Exhibit D - Small Business Participation Plan Format

DOC, High priority: read this first3 pages · specifications
High

Exhibit E - Small Business Subcontracting Plan Format

DOC, High priority: read this firstsubcontracting-plan
High

W912JC-18-R-5702 Amendment 2 - Questions and Answers

DOCX, High priority: read this first3 pages · q-and-a
High

35th ID Readiness Center Solicitation W912JC-18-R-5702 Pre-Bid Attendees

XLSX, Low priority2 pages · prebid-attendees
Low

Amendment 3 Q&A - W912JC-18-R-5702

DOCX, Low priority2 pages · q-and-a
Low

Exhibit B - Subcontractor Information and Consent Form

DOC, Low priority1 page · past-performance
Low

Drawings_V1_Set_2_of_7_Site.pdf

PDF

Drawings_V1_Set_3_of_7_Architectural.pdf

PDF

Drawings_V1_Set_4_of_7_Structural.pdf

PDF

Drawings_V2_Set_6_of_7_Electrical.pdf

PDF

example_of_project_exemption__for_construction08-21-2018-115935.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

10 updates
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice type changed from Presolicitation to Special Notice. Response deadline added: Aug 30, 2018. The notice title changed. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Aug 30, 2018 to Sep 6, 2018. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Notice updated

The point of contact changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M9 Uspfo Activity Ks Arng
Contacts1 person available
OfficeTOPEKA, KS, 66611-1169, USA
Office AddressTOPEKA, KS, 66611-1169, USA
Contacts
Adam L. VillalobosContracting Officer

Full Description

Show more
Amendment 4 - attaching revised solicitation with the two additional CLINs( for contractors pricing. Proposal due date remains 2:00 pm CDT on Thursday, September 6, 2018. Proposals are to be submitted or hand carried to USPFO for Kansas, 2737 S Kansas Avenue, Topeka KS 66611 attn: Karen Robben The project is Tax Exempt for Kansas Sales Tax on materials and services. Project Exemption Certificate will be provided to the Successful offeror after award. No Unit Prices are required - those were removed in a previous Amendment.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS