Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on March 18, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Notice of Intent - Sole Source Procurement for Wells Control System Upgrade at Fort Drum

Closed
W912DS-26-S-0018Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex located at 28 Bare Cove Park Drive. This fixed-price lump sum project has an estimated construction cost of $1,300,000. The scope of work includes site preparation such as the removal of trees, shrubs, and stumps, re-grading the site, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the contractor is responsible for a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor must coordinate with the Town and the demolition contractor, Pasquazzi Bros, Inc., and is responsible for maintaining construction fencing and erosion control throughout the project duration. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or paved athletic facilities. Bidders must submit their proposals electronically via the OpenGov portal by November 3, 2026, including a 5% bid security and a Statement of Qualifications with at least three similar public project references. Awarded contractors must provide a payment bond equal to 50% of the total project cost and adhere to Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code. The project includes a minimum one-year warranty for labor and a two-year warranty for materials. Final payment is contingent upon the submission of AIA affidavits for the payment of debts and release of liens.
Recreation

POSTED

about 4 hours ago

DEADLINE

in 5 days
NAICS: 237990
New
SLED
Pre-Qualification For Construction Of Park, Recreation & Libraries Parks And Facilities For 2027
Solicitation # 13-202
Solicitation 13-202 is a pre-qualification process issued by the City of Roseville, California, for the construction of park, recreation, and library facilities scheduled for 2027. The objective is to identify qualified contractors with the capacity and experience to execute new park construction and rehabilitation projects. Interested parties must submit their pre-qualification packages via email to the City Clerk’s Office by 3:00 p.m. on November 23, 2026. Submissions are limited to 25 megabytes and must include a signed questionnaire, DIR registration for all contractors and subcontractors, and current workers' compensation certificates of insurance. To achieve pre-qualified status, applicants must meet essential qualifications, including a valid California Contractor's license and specific insurance limits of 1,000,000 dollars per occurrence and 2,000,000 dollars aggregate. Experience requirements mandate the completion of at least six new park construction projects for public agencies within the last three years, with a maximum of three rehabilitation projects allowed toward this total. Financial solvency is verified through third-party credit checks, where a score of 650 or less may lead to disqualification. Evaluation also considers compliance with California apprenticeship laws, Davis-Bacon prevailing wage requirements, and CAL OSHA safety standards.
City of Roseville, Parks, Recreation & Libraries Department (PRL)

POSTED

about 5 hours ago

DEADLINE

in 25 days

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Fort Drum, NY, 13602, USA

Set-Aside

NONE

Documents

2

Sources Sought - Wellfield Expansion at Fort Drum, NY - W912DS-26-S-0018

DOCX, High priority: read this firstsources-sought
High

Fort Drum Wells Control System Upgrade - Sole-Source Justification

DOCX, Low priorityjustification-and-authorization
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Sources Sought

Notice updated

Notice type changed from Sources Sought to Special Notice. Response deadline changed from Feb 26, 2026 to Apr 2, 2026. The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts1 person available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA
Contacts
Brian Winters

Full Description

Show more

1.0 Introduction & Background


This document provides the justification for using other than full and open competition for the procurement of control system hardware, software, and integration services for the wells control system upgrade project at Fort Drum. The project requires the expansion and modernization of the existing Supervisory Control and Data Acquisition (SCADA) system controlling the facility's water wells.


The existing wells are operated by a proprietary control system. To maintain operational integrity, system stability, and cybersecurity posture, the new controls must seamlessly integrate with the incumbent manufacturer's platform. 


2.0 Justification for Other Than Full and Open Competition


2.1 Authority Cited


The proposed procurement is justified under the authority of FAR 6.302-1, "Only One Responsible Source and No Other Supplies or Services Will Satisfy Agency Requirements." This authority is applicable because the required supplies and services must be procured from a specific manufacturer to ensure compatibility with the existing installed infrastructure, thereby avoiding substantial duplication of cost and unacceptable delays.


2.2 Description of Supplies/Services


The required supplies and services include proprietary programmable logic controllers (PLCs), input/output (I/O) modules, SCADA software licenses, and the associated engineering services for programming, configuration, and integration. These components must be fully compatible with the existing Fort Drum wells control system, which is based on the Trane platform. Only this manufacturer and its authorized representatives can provide the hardware, firmware, and software required to expand the system without compromising its integrity while maintaining the full functionality required by the Fort Drum licensed water operator.


2.3 Demonstration of Sole Source Necessity


The existing SCADA system for the wells at Fort Drum is a highly integrated and proprietary platform. Key components, including the central servers, communication protocols, and programming environment, are specific to the incumbent manufacturer. Awarding a contract to another source would prevent the new well controls from integrating into the existing system for the following reasons:


  • Proprietary Architecture: The system's communication bus and software are not open-protocol, preventing third-party controllers from being recognized or functioning within the established network.
  • Data Analysis: The system’s proprietary data analysis would be unable to fully integrate with non-Trane equipment.
  • Data & Alarm Consistency: An alternative system would be unable to integrate into the existing alarm, trending, and historical data logging schemas, creating operational inefficiencies and information gaps.
  • Cybersecurity: Introducing a different platform would require a completely new cybersecurity evaluation and Authority to Operate (ATO), creating a separate, less secure control network or a risky and unproven integration gateway.

2.4 Rationale for Substantial Duplication of Cost


Utilizing a different controls manufacturer would result in substantial duplication of costs that would not be recovered through competition. These sunk costs would include:


  • System Replacement: A wholesale replacement of the existing central SCADA servers, operator workstations, and network hardware would be required.
  • Reprogramming: All existing sequences of operation for the current wells would need to be reprogrammed and recommissioned on the new platform.
  • Operator Training: Facility operators would need to be retrained on an entirely new system, leading to lost productivity and the potential for operational errors.

These duplicated costs are estimated to far exceed any potential savings from a competitive procurement for the new expansion scope alone.


2.5 Rationale for Unacceptable Delays


Introducing an alternate controls brand would cause unacceptable delays to a mission-critical utility infrastructure project. Specific delays would include:


  • Extended Redesign: The control system architecture would require a complete redesign to accommodate a new platform.
  • Complex Integration & Testing: Significant time would be spent developing and testing a new integration method, with no guarantee of success.
  • Commissioning Delays: Commissioning and functional performance testing would be significantly extended to validate the performance of a non-standard, multi-vendor system.

These delays would jeopardize the project schedule and impact the operational readiness of the facility's water supply.


2.6 Market Research


Market research confirmed that while multiple vendors manufacture control systems, no other vendor can provide components that are fully and seamlessly compatible with the proprietary architecture of the installed system at Fort Drum. Research confirmed that any attempt to use an alternative would require the costly and time-consuming replacement of the existing system, validating the conclusion that only the incumbent manufacturer can meet the agency's requirements without causing unacceptable delays and cost duplication.


3.0 Conclusion


Based on the technical constraints of the existing proprietary system, the only viable path to meet the government's needs is to procure controls from the incumbent manufacturer. Therefore, a sole-source justification pursuant to FAR 6.302-1 is appropriate and necessary to ensure the successful, timely, and cost-effective completion of the Fort Drum wells control system upgrade.

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS