Z--BROCK RESERVOIR GATE REPLACEMENT/REPAIRS

Awarded
140R3026R0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Brock Reservoir Gates Replacement project, managed by the Department of the Interior's Bureau of Reclamation Lower Colorado Regional Office, involves the replacement of 11 existing cast iron slide gates with new stainless steel units at the Warren H. Brock Reservoir in California. The scope of work includes the installation of new gearboxes, actuators, stem protection, and integration into the existing SCADA control system. Additional critical infrastructure upgrades include the installation of an impressed current cathodic protection system, a 150 kW Tier 3 compliant diesel generator with an automatic transfer switch, LED exterior lighting, and new level instruments. The project also requires temporary water control and cofferdam installation to facilitate construction. This full and open competition is estimated between $5,000,000 and $10,000,000, with a mandatory performance period of 547 calendar days following the notice to proceed. Award is based on a trade-off approach where technical merit and cost are balanced, with non-price factors—including the construction schedule, past performance, management approach, and small business participation—considered significantly more important than price. Contractors are required to provide performance and payment bonds and adhere to strict quality control procedures and prevailing wage rates for Imperial County, California. Invoicing is conducted exclusively through the Internet Payment Platform.

General Info

Contract Value

$7,161,200

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

NV, USA

Set-Aside

NONE

Award Issued Date

Documents

29

140R3026R0004 Questions from Site Visit

PDF, High priority: read this first5 pages · q-and-a
High

423-D-60247 Cell 1 Option 0003 Cathodic Protection System Details

PDF, High priority: read this first1 page · specifications
High

Amendment 0001 to Solicitation 140R3026R0004 for Brock Reservoir Gates Replacement

PDF, High priority: read this first2 pages · amendment
High

Amendment 0002 to Solicitation 140R3026R0004 for Brock Reservoir Gates Replacement

PDF, High priority: read this first2 pages · amendment
High

Amendment 0003 to Solicitation 140R3026R0004

PDF, High priority: read this first2 pages · amendment
High

Amendment 0004 to Solicitation 1403026R0004

PDF, High priority: read this first2 pages · amendment
High

Amendment 0005 to Solicitation 140R3026R0004

PDF, High priority: read this first2 pages · amendment
High

Attachment 2 Drawings Index and Details

PDF, High priority: read this first88 pages · specifications
High

Attachment 4 Bid Bond SF24

PDF, High priority: read this first4 pages · bid-bond
High

Attachment 8 Key Subcontractor Specialized Experience

PDF, High priority: read this first4 pages · special-notice
High

Attachment 9 Subcontracting Plan Template

PDF, High priority: read this first11 pages · subcontracting-plan
High

Brock Reservoir Gate Replacement Statement of Work

PDF, High priority: read this first5 pages · sow
High

DOI Bureau of Reclamation Subcontracting Plan Template

DOCX, High priority: read this first8 pages · subcontracting-plan
High

Payment Bond Standard Form 25A (SF25A)

PDF, High priority: read this first3 pages · payment-bond
High

Performance Bond Standard Form 25 (Rev. 10/2023)

PDF, High priority: read this first4 pages · performance-bond
High

Solicitation 140R3026R0004 Amendment 0004 - Brock Reservoir Gates Replacement Section L

PDF, High priority: read this first1 page · amendment
High

Solicitation 140R3026R0004 Amendment 0004 - Brock Reservoir Gates Replacement Section L Instructions

PDF, High priority: read this first1 page · amendment
High

Solicitation 140R3026R0004 Brock Reservoir Gates Replacement/Repairs

PDF, High priority: read this first3 pages · ifb
High

Solicitation 140R3026R0004 - Brock Reservoir Gates Replacement/Repairs

PDF, High priority: read this firstifb
High

Solicitation 140R3026R0004 Brock Reservoir Gates Replacement RFP

PDF, High priority: read this first85 pages · rfp
High

Specifications 01 46 00 Quality Procedures

PDF, High priority: read this first8 pages · specifications
High

Specifications 35 23 11 Slide Gates and Actuators

PDF, High priority: read this first16 pages · specifications
High

Specifications Section 31 03 10 Control of Water

PDF, High priority: read this first2 pages · specifications
High

Wage Determination CA20260002 for Imperial County, CA

PDF, High priority: read this first25 pages · wage-determination
High

Warren H. Brock Reservoir Gates Replacement Specifications

PDF, High priority: read this first384 pages · specifications
High

Attachment 7 - Past Performance Questionnaire

PDF, Low priority4 pages · past-performance
Low

Release of Claims Form DI-137

PDF, Low priority3 pages · release-of-claims
Low

Rodney Hunt Shop Drawings 0003

PDF, Low priorityother
Low

Solicitation 140R3026R0004 Site Visit Sign-In Sheet

PDF, Low prioritysite-visit-sign-in-sheet
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Response deadline changed from Feb 17, 2026 to Feb 23, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Lower Colorado Regional Office
Contacts1 person available
OfficeBOULDER CITY, NV, 89005, USA
Office AddressBOULDER CITY, NV, 89005, USA

Full Description

Show more
Brock Reservoir Gates Replacement

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
OSU-260081 Fuel Tank Dispensing Infrastructure Replacement REBID
Solicitation # OSU-260081
The OSU-260081 Fuel Tank Dispensing Infrastructure Replacement is a re-bid general contract for The Ohio State University with an estimated value of 1,627,730 dollars. The project scope involves the removal and replacement of three underground storage tanks, specifically one diesel and two unleaded gasoline tanks, along with the associated dispensing piping, islands, and infrastructure. Additional work includes replacing underground diesel exhaust fluid piping, performing upgrades to the diesel canopy, fully replacing the unleaded canopy and its foundation, and installing new fuel management card readers at three facilities. Construction is anticipated to begin in August 2027, and the contractor is required to provide at least two training sessions for facility personnel on system operation and maintenance. Bids must be submitted electronically via BidExpress by October 15, 2026, at 2:00 p.m. EST. Evaluation for award is based on the bidder's financial condition, past performance, facilities, and management capability in plumbing, fire protection, HVAC, and electrical work. Key requirements include a 5.0 percent EDGE participation goal, compliance with Ohio prevailing wage rates, and the use of an Ohio State Fire Marshal certified installer for tank installation. The contract also mandates adherence to the 2024 Ohio Building Code, 40 CFR 280, and ADA requirements. Payment for approved requests is issued within 30 days of acceptance, and bidders must provide a bid guaranty and subsequent performance and payment bonds.
The Ohio State University

POSTED

about 15 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237990
New
SLED
26RFCSP85 Brushy Creek Trail Retaining Wall
Solicitation # 26RFCSP85
Williamson County is soliciting competitive sealed proposals for the Brushy Creek Trail Retaining Wall project (26RFCSP85) to stabilize a 170-foot retaining wall and address erosion and drainage issues near UBCWCID Dam No. 7 in Cedar Park, Texas. The scope of work includes compaction grouting, special excavation, embankment with density control, and the installation of Type C wire fencing. Additionally, the project requires comprehensive erosion control measures, including the placement of dry common stone riprap, Type 2 filter fabric, hydro mulch seeding, and the planting of vegetation. The project has a construction budget of 200,000.00 dollars and a completion timeline of 90 days. Proposals will be evaluated on a 100-point scale, with the highest weight placed on the pricing proposal (37 points), followed by demonstrated experience with similar projects, government performance history, and the qualifications of the assigned Site Superintendent and Project Manager. Awardees must comply with Texas Prevailing Wage Law and provide mandatory certifications, including anti-boycott statements regarding Israel, energy companies, and firearm entities. The contractor is required to maintain comprehensive insurance coverages, including Workers Compensation, General Liability, and Builder's Risk, and must provide both payment and performance bonds before commencing work. All submissions must be made via the County's purchasing portal or delivered in a sealed envelope to the Purchasing Department in Georgetown, Texas.
Wilco

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Water Well Replacement ProjectThe Vandenberg Village Community Services District is undertaking the Water Well Replacement Project in Lompoc, California, to replace three aging potable water wells (Wells 1B, 3A, and 3B) that have reached the end of their functional lifespan. The project involves constructing three new wells with an expected yield of 800 to 1,350 gallons per minute, including the installation of electrical service, metering, monitoring, and security infrastructure. These new wells will be connected to the existing water distribution system via new lateral connections and replacement pipelines at Well Site 1. The work is located within a 0.76-acre site in the Burton Mesa Ecological Reserve, with temporary construction staging near Exit 702/704 of State Route 1. Construction is anticipated to span approximately 30 months, with a general timeline from July 2027 through December 2029, though specific site preparation and grading are scheduled as early as July 2026. The project must adhere to the California Green Building Standards Code (CALGreen) and various California waste management acts (AB 939, AB 341, and AB 1826), as well as the Construction General Permit for water quality. Environmental compliance is a primary focus, with a Mitigated Negative Declaration adopted under CEQA guidelines to address impacts on biological resources, air quality, and greenhouse gas emissions. Key mitigation measures are specifically required to protect special-status plants and wildlife within the ecological reserve.
Vandenberg Village Community Services District

POSTED

1 day ago

DEADLINE

N/A
View Details

More opportunities from Department Of The Interior → Lower Colorado Regional Office

Same awarding agency

NAICS: 238220
New
Federal
J--E21 PRCA HVAC REPLACEMENT
Solicitation # 140R3026Q0143
Solicitation 140R3026Q0143 is a small business set-aside request for quotations issued by the Bureau of Reclamation's Lower Colorado Regional Office for the replacement of HVAC systems at the Planet Ranch Conservation Area in Parker, Arizona. The project requires the contractor to perform initial site inspections and Manual J load calculations to design and install two new ground-mounted electric dual heat and air-conditioning units for Buildings 100 and 200. The scope of work includes the removal and disposal of existing roof-mounted units, necessary roof repairs, installation of concrete pads, electrical work, and the use of insulated metal ductwork to prevent pest intrusion. All work must be completed within 90 days of the Notice to Proceed, with a final completion deadline of February 26, 2027. The contract is subject to the Davis-Bacon Act for prevailing wages and requires a bid guarantee of 20 percent of the proposal price. Award decisions will be based on the most advantageous quote, evaluating technical approach, experience with roof coating and flashing, past performance over the last three years, and price. Key administrative requirements include the submission of a site-specific safety program with OSHA First Aid and CPR certifications, a certificate of liability insurance due 10 days after award, and payment protections totaling 100 percent of the contract price. Invoicing must be processed electronically through the U.S. Department of the Treasury's Invoice Processing Platform System.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 15 days
View Details
NAICS: 561210
Federal
M--OPERATION AND MAINTENANCE OF YDP, IDIQ
Solicitation # 140R3026R0012
Solicitation 140R3026R0012 is a request for proposals issued by the Department of the Interior, Bureau of Reclamation, for an Indefinite Delivery Indefinite Quantity (IDIQ) contract to provide Operation and Maintenance (O&M) support services for the Yuma Desalting Plant (YDP). This 100% 8(a) set-aside procurement has a maximum value of 35 million dollars with a minimum guarantee of 5,000 dollars. The contract period of performance is scheduled from February 1, 2027, to January 31, 2032. The scope of work requires the contractor to provide 24/7, 365-day O&M services for the YDP, the A-22 Waste Disposal Facility, and the Water Quality Improvement Center (WQIC) Research Facility, as well as maintenance-only support for Analytical Laboratory Services and the completion of a specific modifications and repair backlog. The government will award the contract based on a best value determination, where technical factors—including corporate experience, management approach, technical approach, and staffing—are significantly more important than price. Proposals must be submitted electronically by October 14, 2026, at 12:00 P.M. PDT. Key requirements include the development of a comprehensive Maintenance Management Plan and a Quality Control Program, with performance monitored via a Quality Assurance Surveillance Plan and the Computerized Asset and Maintenance Management System. Invoicing must be processed through the Invoice Processing Platform, and the contractor must adhere to strict safety, security, and regulatory standards, including specific liability insurance minimums and Service Contract Act wage determinations.
Facilities Support Services

POSTED

20 days ago

DEADLINE

in 1 day
View Details
NAICS: 237990
Federal
Z--CABLEWAY CRANE REFURBISHMENT
Solicitation # 140R3026R0010
Solicitation 140R3026R0010 is a request for proposals from the Department of the Interior, Bureau of Reclamation, for a firm-fixed-price construction contract to refurbish the 150-ton cableway crane at Hoover Dam. The project scope includes replacing track and button line wire ropes, refurbishing the carriage, installing slack carriers, replacing sheaves, updating the hydraulic pump, and performing final load testing and certification. The estimated project magnitude is between 5 million and 10 million dollars, with a total performance period of 850 calendar days scheduled from September 30, 2026, to December 29, 2028. The work is divided into material procurement during the first year and onsite construction starting in May 2028. The procurement is open to full and unrestricted competition under NAICS code 237990. Award decisions will be based on best value, prioritizing relevant experience, technical capability, past performance, safety plans, and small business participation over price. Contractors must be registered in the System for Award Management and possess a Unique Entity Identifier. Key requirements include the provision of performance and payment bonds, adherence to prevailing wage determinations for Nevada and Arizona, and strict security protocols for personnel accessing the facility. Proposals must be submitted in three separate volumes covering business representations, technical experience, and pricing.
Other Heavy and Civil Engineering Construction

POSTED

2 months ago

DEADLINE

in 2 months
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS