This Government Contract opportunity from Department Of Defense was posted on October 4, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction of the Relief Well and Toe Drain Collector Pipe Rehab, Cherry Creek Project, Denver, CO

Awarded
W9128F-10-B-0026Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 13 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

This solicitation is for the construction of the Relief Well and Toe Drain Collector Pipe Rehab at the Cherry Creek Project in Denver, Colorado. Restricted to small business participation, the project has an estimated cost between 500,000 and 750,000 dollars. The scope of work includes installing two pre-cast reinforced concrete manholes, flushing and removing sediment from over 13,000 feet of various diameter collector and toe drain pipes, and performing high-resolution camera inspections of the pipe conditions. Additionally, the contractor must deepen an existing drainage ditch, construct a new drainage ditch, install new RCP outfall pipes, and build a 400-foot gravel access road. The awarded contractor must commence work within 10 days of the notice to proceed and complete all tasks within 180 calendar days, with liquidated damages applicable for delays. Performance and payment bonds are required, and all personnel must provide photo identification and security badges for site access. Bidders are required to be registered in the Central Contractor Registration database and provide updated annual representations and certifications via ORCA.

General Info

Contract Value

$884,547.13

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Cherry Creek Dam, DENVER, CO, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Aug 3, 2010 to Aug 19, 2010. The notice description changed.

Notice updated

Response deadline time changed from 7:00 PM UTC to 8:00 PM UTC on Aug 19, 2010. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA
Office AddressOMAHA, NE, 68102-4901, USA
Contacts
Tracey S. MckayContract Specialist

Full Description

Show more
Invitations for Bid for construction of the Relief Well and Toe Drain Collector Pipe Rehab, Cherry Creek Project, Denver, CO. The solicitation will close on or about 19 August 2010, 2:00 PM CDT. This solicitation is RESTRICTED TO SMALL BUSINESS PARTICIPATION. A site visit is scheduled for 02 August 2010 at 1:00 PM CMT. Contractors are to meet at Cherry Creek Dam at the east entrance on the downstream side of the dam. All Contractors present for the site visit will need to sign in, provide photo identification and wear security badges. The Contractor awarded the contract will have to provide a written list of employees involved with the contract. Questions pertaining to the site visit may be directed to Dan Johnson, Tri-Lakes Project Office, Littleton, CO Phone Number : 303-979-4120 e-mail: Daniel.B.Johnson@usace.army.mil DO NOT submit requests for plans and specifications to the site visit personnel listed above. See 'Obtaining Solicitation Documents' below. Project Description: (Approx. quantities) (1) Install two (2) pre-cast reinforced concrete manholes. These manholes are for access to the existing 30" diameter by 2620 feet long relief well and toe drain solid corrugated metal collector pipe (CMP) at Cherry Creek Dam. This pipe is situated 12 feet to 30 feet below grade on the downstream slope of the Cherry Creek Dam embankment. The depths of both manholes are approximately 15 feet. Estimated earthwork quantities are 800 cubic yards of excavation and backfill. (2) Remove all sediment and flush the inside of the 30" diameter relief well and toe drain CMP collector pipe. The length of this pipe is 2620 feet and varies in depth between 12 feet to 30 feet below grade. Access to the pipe will be provided by the 2 newly installed manholes and 1 existing manhole. It is estimated between 100 and 250 cubic yards of material will be removed from the pipe and disposed of offsite. The Contractor can expect accumulated soft and hard packed sediment in the pipe up to a thickness of one-third to one-half the depth of the pipe. The pipe will be flushed clean with water, brushes, etc. to facilitate a thorough inspection. Down-hole packers will need to be installed in 14 adjacent relief wells during flushing operations to prevent sediment from fouling these wells. Discharge of flush water shall be contained or controlled so as to prevent the release of solids into Cherry Creek or adjacent drainageways. (3) Conduct a thorough down-hole camera inspection and document the condition of the 30" diameter relief well and toe drain CMP collector pipe. The length of this pipe is 2620 feet and is 12 feet to 30 feet below grade. Access to the pipe will be provided by the 2 newly installed manholes and 1 existing manhole. The camera equipment shall be a high resolution color camera and pose pan and tilt capability for inspection at right angles to the camera with 360 degree rotation. The entire circumference of each pipe joint will be inspected and videotaped. The outfall pipes from the relief wells and toe drain system (17 total) which penetrates the collector pipe shall also be inspected. The Contractor shall provide a digital recording of the entire inspection and a written report along with digital photographs of significant defects of the pipe. (4) Cleanout and deepen an existing drainage ditch and install a new 18" RCP pipe under a bike/pedestrian path. The new ditch will be 8 feet wide, 4 feet deep, approximately 1270 feet and will have 1V on 3H side slopes. The new 18" RCP will be 50 to 60 feet long. Estimated excavation quantity is 1500 to 3000 cubic yards and this material will be disposed of onsite. (5) Construction of a new drainage ditch. The ditch is 4 feet wide, 3 feet deep, approximately 500 feet and has 1V on 3H side slopes. Estimated excavation quantity is 500 to 1000 cubic yards and this material will be disposed of onsite. (6) Installation of a new 18" diameter RCP outfall pipe for an existing toe drain manhole. The length of the new pipe is estimated at 25 to 30 feet long. The existing manhole is 12 feet to 15 feet below grade. (7) Remove all sediment and flush the inside of the existing 12" diameter perforated CMP toe drain pipe and 12" diameter solid CMP outfall pipes. The total length of pipe is 11,200 feet and varies in depth between 12 feet to 25 feet below grade. Access to the pipe is provided by 12 existing toe drain manholes. It is estimated between 50 and 100 cubic yards of material will be removed from the pipe and disposed of offsite. The Contractor can expect accumulated hard packed sediment in the pipe up to a thickness of one-third to one-half the depth of the pipe. The pipe will be flushed clean with water, brushes, etc. to facilitate a thorough inspection. Discharge of flush water shall be contained or controlled so as to prevent the release of solids into adjacent drainageways. (8) Conduct a thorough down-hole camera inspection and document the condition of the 12" diameter toe drain pipe. The length of this pipe is 11,200 feet and is 12 feet to 25 feet below grade. Access to the pipe will be the 12 existing toe drain manholes. The camera equipment shall be a high resolution color camera and pose pan and tilt capability for inspection at right angles to the camera with 360 degree rotation. The circumference of each joint will be inspected and videotaped. The Contractor shall provide a digital recording of the entire inspection and a written report along with digital photographs of significant defects of the pipe. (9) Construct a gravel access road at the toe of the downstream slope of Cherry Creek dam for access to the relief wells/toe drain collector pipe and toe drain systems. This road will have a top width of 12 feet and be approximately 400 feet long. It will be constructed to balance excavation and fill and will to topped with 6" of gravel surfacing. Estimated quantities are 500 cubic yards of earthwork and 200 tons of gravel surfacing. Once the job is done, the road will remain in place for project use. The estimated construction cost of this project is between $500,000 and $750,000. The Contractor will be required to commence work within 10 days after notice to proceed and complete the work 180 calendar days after receipt of Notice to Proceed. Provisions will be included for liquidated damages in case of failure to complete the work in the time allowed. Performance and payment bonds will be required. Bonding documents including the power of attorney shall bear an original signature by an officer of the surety. Please be advised of on-line registration requirement in Central Contractor Registration (CCR) database https://www.bpn.gov/ccr/default.aspx and directed solicitation provisions concerning electronic annual On-line Representations and Certifications (ORCA) at https://orca.bpn.gov. Representations and certifications are required to be updated annually as a minimum to keep information current, accurate and complete. The electronic annual representations and certifications are effective until one year from date of submission or update to ORCA. Obtaining Solicitation Documents: Solicitation documents will be posted to the web via Federal Business Opportunities (www.fbo.gov). Find solicitation announcement in Fed Biz Opps (www.fbo.gov) - 1. Use the 'Quick Search' to locate the project (by entering the solicitation number) or use the advanced search features offered in the 'Find Opportunities' (large arrow in the middle of the page) or use the 'Opportunities' tab followed by the 'Advanced Search' tab. - 2. By using the 'login' feature, it allows additional search features and allows you to keep your searches. Login might be required on some solicitations that are considered restricted. - 3. Once you have located your project, click on link to solicitation to view the project. Files may be downloaded from the column on the right side reading 'All Files' or from the 'Packages' tab. - 4. If you want other vendors, sub-contractors or contractors to contact you, click on the 'Interested Vendors' tab and then 'Add me to Interested Vendors' link at the bottom of the page. Questions regarding contractual matters should be made to: Tracey S. McKay 402?995?2060. Telephone calls regarding Small Business matters should be made to: 402?995?2910. Telephone calls on contents of drawings and specifications should be made to the Project Manager at: 402-995-2494 or Specification Section at: 402-995?2184.

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
The USACE Omaha District intends to award a contract for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located in Big Bend, Lower Brule, South Dakota. This project is a 100 percent Small Business Set-Aside under NAICS code 237990, with estimated construction costs ranging from 10 million to 25 million dollars. The scope of work involves the construction of a 100-foot-wide riparian planting bench, a gravel maintenance path, and the creation of a 200-by-1,500-foot island in Reach 4 of the lake. This island will be planted with cottonwood trees and culturally significant vegetation, protected by a riprap revetment to prevent erosion from wind, waves, and ice. These efforts are expected to create approximately 32 acres of riparian habitat and 5.17 acres of emergent wetland. The government plans to issue the Invitation for Bid on approximately October 6, 2026, with a closing date around November 10, 2026, and a scheduled site visit on October 28, 2026. The selected contractor must complete the work within 450 days of receiving the Notice to Proceed, and the contract will include provisions for liquidated damages and requirements for both performance and payment bonds. Bids must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module, and all offerors must maintain an active and verified account in the System for Award Management.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
Other Heavy and Civil Engineering Construction

POSTED

5 days ago

DEADLINE

in about 1 month
View Details
NAICS: 238220
New
Federal
Cooling Water System Repair and Reliability Project
Solicitation # W9128F26XICGB
The U.S. Army Corps of Engineers Omaha District is seeking capability statements for the Cooling Water System Repair and Reliability Project at Cavalier Space Force Station, ND. This project, estimated between 50 million and 70 million dollars, involves the comprehensive rehabilitation and modernization of a large-scale industrial cooling water system. The scope of work includes installing new fluid coolers, pumps, distribution loops, and a redundant heat exchanger arrangement, as well as the demolition and replacement of 24-inch piping. Critical requirements include maintaining full operational continuity of the system throughout construction to support national defense missions, adhering to HEMP requirements, and performing ACM abatement. The government intends to utilize a Progressive Design-Build approach via an Other Transaction Authority agreement under 10 U.S.C. 2808a, which operates outside the Federal Acquisition Regulation. Selection will be based on qualifications rather than price, focusing on team composition and past relevant experience. The anticipated schedule begins with design in the second quarter of fiscal year 2027, followed by construction in the fourth quarter of the same year. Interested firms must be registered in SAM.gov, capable of bonding at least 70 million dollars for a single project, and compliant with Cybersecurity Maturity Model Certification Level 1.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

5 days ago

DEADLINE

in 6 days
View Details
NAICS: 238990
Federal
GARRISON TRASH RACK MODIFICATION CRANE RENTAL
Solicitation # W9128F26QA099
Solicitation W9128F26QA099 is a firm-fixed-price service contract issued by the U.S. Army Corps of Engineers, Omaha District, for the rental of a crane and a qualified operator at the Garrison Dam near Riverdale, North Dakota. The primary objective is to support the modification of intake trash racks to conserve cool waters for fishery missions during drought conditions. The contractor is responsible for providing all equipment, tools, vehicles, and supervision necessary to lift and lower trash racks weighing between 30,000 and 33,000 pounds, with the capacity to overcome friction factors up to 41,000 pounds. The period of performance is scheduled from October 30, 2026, through June 30, 2027. This procurement is a total set-aside for Women-Owned Small Businesses and Economically Disadvantaged Women-Owned Small Businesses under NAICS 238990. Award will be based on the most advantageous offer, evaluating price alongside technical information and past performance, including three project examples from the last two years. Key compliance requirements include adherence to EM 385-1-1 safety standards, the submission of a site-specific Accident Prevention Plan and Lift Plan, and compliance with Service Contract Act wage determinations for North Dakota. Following Amendment 0001, the closing date for the submission of offers has been extended to October 23, 2026, at 2:00 PM.
All Other Specialty Trade Contractors

POSTED

8 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS