Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction On State Highway In Alameda County In Fremont From 0.3 Mile North Of Scott Creek Road Undercrossing To 1.0 Mile South Of East Warren Avenue Undercrossing

Closed
20260703004State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # pier-b-dock-rail-support-facility-west-expansion-pier-b-street-realignment
Kiewit Infrastructure West Co. is soliciting quotes from qualified Small Business Enterprises (SBE) and Veteran-Owned Small Business Enterprises (VSBE) for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, encompassing civil and site work, utilities and piping, paving and structures, and specialized electrical and telecommunications systems. Key activities include tunneling, boring, micro-tunneling, asphalt and concrete paving, and the installation of various piping materials. The bid deadline is September 15, 2026, with invitations to bid issued through the BuildingConnected system. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatories to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided by multiple grants, including the U.S. DOT MARAD 2021 Port Infrastructure Development Program, the State of California Transportation Agency, and FHWA through LACMTA, necessitating strict adherence to DBE Program requirements. Qualified bidders must possess a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100% of their contract value, for which Kiewit will reimburse the premiums. SBE and VSBE firms must provide certification evidence from the Department of General Services and the Port of Long Beach PlanetBids portal.
Kiewit Infrastructure West Co.

POSTED

about 14 hours ago

DEADLINE

in 18 days

AI Contract Overview

Show more

The project involves comprehensive pavement rehabilitation and infrastructure improvements along Route 680 in Fremont, California, from 0.3 mile north of Scott Creek Road Undercrossing to 1.0 mile south of East Warren Avenue Undercrossing. Work includes cold planing, placement of Hot Mix Asphalt (HMA), and application of High Friction Surface Treatment (HFST) with strict performance criteria for aggregate and resin binder properties, including Los Angeles Abrasion Loss ≤10%, viscosity between 1,000–3,000 centipoise, and bond strength testing per ASTM C1583. Drainage system upgrades consist of new inlets and culverts, while safety enhancements involve installation and removal of Midwest Guardrail System (MGS), concrete barriers, and alternative in-line terminal TL-3 systems. Lighting systems and Traffic Monitoring Stations (TMS) will be modified with new conduits, conductors, and loop detectors. Additional tasks include irrigation system adjustments, erosion control measures such as hydroseed and fiber rolls, removal and replacement of pavement markings, and street sweeping. The project requires compliance with Caltrans specifications, ASTM D4280 for pavement marker retroreflectivity, and 23 CFR 635.410 for Buy America provisions. All bonded joint seals and iron and steel products must be accompanied by manufacturer certification and mill test reports verifying origin and compliance. Pavement markers must meet minimum luminous intensity standards initially and after one year of service. The contract is a state-funded highway construction effort administered by the California Department of Transportation (Caltrans) under solicitation number 04-1W7104 and estimated value of $3,630,000. It features a mix of unit-priced items such as HMA, HFST, and pipe lengths, along with lump-sum bid lines for mobilization, job site management, and system modifications. Bids must be submitted electronically via Caltrans’s Contractor’s Corner portal with a deadline of August 18, 2026, and are subject to two addenda issued in July 2026. The contract includes special provisions modifying Caltrans standard specs, such as replacing section 5-1.13E and deleting section 2-1.20, and requires a Warranty Bond form (TOTE-1) and manufacturer installation manuals. There is no formal FAR clause incorporation; instead, the contract relies on state-specific technical and procedural requirements. While the

General Info

Pavement rehabilitation on Route 680 with asphalt, friction treatment, drainage, guardrails, lighting, and traffic monitoring updates by Caltrans.

Agency

State of California, Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Fremont, CA, USA

Set-Aside

NONE

Documents

(7)

Addendum No. 2 for 04-1W7104 Alameda County Highway Construction

PDFamendment

Contract 04-1W7104 Special Provisions for Alameda County Highway Construction

PDFspecial-provisions

04-1W7104 Pavement Structure Plans for Route 680

PDFconstruction-plans

Addendum No. 1 for Project 04-1W7104 Alameda County Highway Construction

PDFamendment

California Construction Wage Determination CA20260018

PDFwage-determination

04-1W7104ad1plans - California Highway Guardrail and Electrical Systems Plans

PDFplans

04-1W7104ad2plans_1785560211301.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
Contacts1 person available
OfficeN/A
Organization / Agency
State of California, Department of Transportation
View Agency Profile
Office AddressN/A
Contacts
Maria Elda Lerma

Full Description

Show more
Bid #04-1W7104: The project involves pavement rehabilitation including cold planing, placing Hot Mix Asphalt (HMA), and applying High Friction Surface Treatment (HFST) on Route 680 in Fremont. Work also includes drainage system improvements with new inlets and culverts. Safety upgrades consist of installing and removing Midwest Guardrail System (MGS), concrete barriers, and terminal systems. The project will also modify existing lighting systems and Traffic Monitoring Stations (TMS), including new conduits, conductors, and loop detectors. Additional work includes irrigation system modifications, erosion control, and new pavement markings and striping.

More opportunities from State of California, Department of Transportation

Same awarding agency

NAICS: 236220
SLED
Caples Lake Maintenance Station Dormitory, Sand Storage, and Generator Building
Solicitation # 10-1H5604
The project involves the demolition of an existing sand storage building and the construction of a new four-story dormitory building, a new sand storage facility, and the renovation of an existing generator building at the Caltrans Caples Lake Maintenance Station. The scope encompasses extensive site work including roadway excavation, paving with HMA and Class 2 AB material, installation of retaining walls, and new drainage systems comprising RCP, flared end sections, and RSP, along with temporary water pollution control measures. Building construction requires concrete foundations, structural steel, masonry, and full integration of architectural, structural, mechanical, electrical, plumbing, and fire protection systems, all to be executed in a high mountain environment with strict environmental and material handling constraints. Materials must be stored in weathertight enclosures, protected from freezing and direct sunlight, and maintained within ambient temperature ranges of 45°F to 90°F; coatings and sensitive products require adherence to manufacturer specifications, including dehydration and sealing prior to shipment. All work must comply with referenced industry standards such as ASTM A36/A36M, NEMA 250, NFPA 80, UL 325, and AISI S240, and acceptance testing must adhere to the latest NETA Acceptance Testing Specification, with inspections conducted on-site by the contractor and verified by the Engineer. Bids are solicited under solicitation number 20260724021, with a response deadline of August 27, 2026, and the work is classified under NAICS code 236220 for construction of buildings. The procuring agency is the California Department of Transportation, and submissions must be made in both electronic and hard-copy formats using approved digital file types such as PDF, JPG, and MPEG, with proper file labeling and metadata retention. Bidders must declare their small business enterprise status with certification from the California Department of General Services, and any request for small business preference requires submission of formal commitment and confirmation forms; failure to provide these renders the bid nonresponsive. Contractors must also submit installer qualification statements, manufacturer certifications on official letterhead, and all system passcodes and passwords no later than 14 days before final completion. While no contract value is disclosed and no explicit evaluation factors, payment details, or contract type are provided, the project requires strict compliance with quality assurance provisions, including shop drawings, product data, welder qualifications, and inspection reports. Delivery and performance are to occur at the job
Commercial and Institutional Building Construction

POSTED

about 1 month ago

DEADLINE

in about 3 hours
View Details