Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction On State Highway In Los Angeles County On Routes 5, 10, And 110 At Various Locations

Closed
07-502204State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes site preparation activities such as land surveying, site clearing, and subsurface investigation; construction and utility tasks including tunneling, boring, jacking, and cathodic protection; and surface improvements such as asphalt paving, lighting, and landscaping. Additionally, the project requires various materials and support services, including ready mix, precast concrete, traffic control, and storm water pollution prevention. This solicitation is specifically targeting qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise firms, including MBE, VBE, and OBE certifications. To be considered, responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a bid submission deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
CSAH 102 (Douglas Drive) Safety Improvements
Solicitation # 2211300
The CSAH 102 (Douglas Drive) Safety Improvements project, administered by Hennepin County and the Minnesota Department of Transportation under state project number 027-702-003, involves comprehensive infrastructure work including grading, bituminous surfacing, ADA improvements, and signal system revisions. The scope of work requires the contractor to provide all necessary labor, materials, and equipment to complete the project in accordance with the Department of Transportation Standard Specifications for Construction, 2025 Edition. Key deliverables include as-built feature survey memorandums, drainage and signal system mark-up plans, and professional surveyor certifications. Technical requirements include specific grounding electrode system standards and strict labeling for epoxy-coated bars. Contract administration is governed by a combination of quality control performed by the contractor and quality assurance managed by the agency, with electrical and traffic signal systems requiring certification by the Project Engineer. Financial and legal protections include a required bid bond of 5% of the bid total, as well as payment and performance bonds equal to the contract amount. Bidders must comply with prevailing wage laws, EEO regulations, and provide a Disadvantaged Business Enterprise certification. Proposals must be submitted electronically via the ProcureWare website, with specific requirements for non-collusion declarations and responsible contractor certifications. The contract also includes provisions for cost and fuel escalation and mandates that construction surveyors meet all MnDOT 1508 requirements.
Hennepin County

POSTED

about 18 hours ago

DEADLINE

in 24 days
NAICS: 237310
New
SLED
Roosevelt Way Preservation (FHWA)
Solicitation # 2025-074
The Roosevelt Way Preservation Project (Solicitation 2025-074) is a federally funded infrastructure initiative managed by the City of Seattle Public Works. The project scope encompasses comprehensive roadway improvements along Roosevelt Way NE from NE 92nd Street to Pinehurst Way NE, and Pinehurst Way NE from Roosevelt Way NE to 15th Avenue NE. Key work elements include planing asphalt overlay, removing and replacing concrete panels and base repair, intersection realignment at NE 113th Street, and the installation of curb bulbs at NE 114th and NE 115th Streets. Additional requirements include ADA-compliant curb ramps, sidewalk restoration, channelization, traffic signals, storm drainage, landscaping, and pedestrian safety enhancements. The engineer's estimate for the project is between $12,500,000 and $12,800,000. As a project funded by the Federal Highway Administration (FHWA) and the Seattle Transportation Plan Levy, the contract mandates strict adherence to federal regulations, including Buy America certifications and a 13 percent Federal Small Business Enterprise (FSBE) goal. Bidders must provide a bid guaranty of five percent of the total bid and maintain various state and local registrations, including a Seattle Business License and UBI number. The contract is administered through a base bid structure with specific unit price items. Performance is subject to quality control inspections, with specific oversight from KC Metro for shelter footings and the Owner's Inspector for CIPP installation. The final bid submission deadline was established as November 18, 2026.
Public Works

POSTED

about 24 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Solicitation 07-502204 is a construction project issued by the State of California Department of Transportation for landscape visual and aesthetic improvements on State Highways Routes 5, 10, and 110 at various locations in Los Angeles County. The scope of work includes the installation of sprinkler assemblies, hydroseeding, compost application, slope paving, rock slope protection, and the installation of vinyl-clad chain link fencing. The project is governed by the 2025 Standard Specifications and Standard Plans, with specific requirements for MASH TL-3 compliant temporary barrier systems and the use of certified weed-free straw for erosion control. The project timeline consists of 250 working days for general work and 500 working days for plant establishment, totaling 750 working days, with a final completion year of 2030. Bids must be submitted on a unit price basis by October 28, 2026, and must include bidder's security equal to at least 10 percent of the bid. Eligible contractors must hold either a Class A or Class C-27 license. Key administrative requirements include the designation of an on-site safety representative, adherence to prevailing wage rates, and the submission of a work plan 20 days prior to starting job site activities. Quality control personnel must hold an ACI Concrete Field-Testing Technician Grade 1 certification.

General Info

Caltrans landscape improvements on LA highways; bids due October 28, 2026; completion 2030.

Place of Performance

Sacramento, CA, 95814, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Full Description

Show more
Bid #07-502204: $18

More opportunities from State of California Department of Transportation

Same awarding agency

NAICS: 237310
SLED
Route 22/55 Separation and Tustin Street Overcrossing to Orange Maintenance Facility Improvements Project
Solicitation # 12-0S0804
Solicitation 12-0S0804 is a unit price basis contract issued by the State of California Department of Transportation for the Route 22/55 Separation and Tustin Street Overcrossing to Orange Maintenance Facility Improvements Project. With an estimated cost of 33 million dollars, the project involves construction and building work in Orange County, specifically from 0.1 mile east of the Cambridge Street overcrossing to the Route 22/55 separation and at the Orange Maintenance Facility. The scope of work encompasses site clearing, earthwork for foundations and slabs, the installation of electrical and traffic signal systems, and comprehensive mechanical work including HVAC, plumbing, and natural gas distribution. The project mandates strict adherence to 2025 Standard Specifications and Plans, as well as LEED v4/v4.1 and CALGreen sustainability standards. Key requirements include compliance with Buy America/Build America for manufactured products, the use of accredited manufacturers for pre-engineered steel buildings, and adherence to AWS welding codes. Contractors must provide an on-site safety representative and follow specific ADA compliance survey protocols. Bids open on December 8, 2026, and the contract includes a 10-year warranty period from the date of work completion. Payment and invoicing are managed through the Department's prompt payment monitoring system, with specific requirements for paying material suppliers within 30 days.
Highway, Street, and Bridge Construction

POSTED

19 days ago

DEADLINE

in 24 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS