This Solicitation opportunity from California was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction On State Highway In Madera County Near Madera From San Joaquin River Bridge To 0.6 Mile North Of Avenue 12 Overcrossing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The California Department of Transportation is soliciting bids for project 06-0H22U4, which involves the construction and rehabilitation of approximately 8 miles of State Highway 99 in Madera County, spanning from the San Joaquin River Bridge to 0.6 mile north of the Avenue 12 Overcrossing. With an estimated contract value of 85 million dollars, the scope of work includes roadway excavation, the placement of Hot Mix Asphalt, Rubberized Hot Mix Asphalt, and Class 2 Aggregate Base, as well as the installation of concrete barriers and Midwest Guardrail Systems. Additional requirements include drainage improvements through the installation and abandonment of culverts, electrical work for changeable message signs, and barrier replacement at the Little Dry Creek Bridge. Extensive traffic control, including ramp and lane closures and the deployment of portable radar feedback units, is required throughout the project. The contract is structured as a firm fixed price agreement with bids due by September 3, 2026, via the Contractor's Corner portal. Key personnel requirements include a full-time, on-site Safety Quality Control Manager with Cal/OSHA 30-hour certification and specialized experience for drilling contractors. Performance is subject to strict quality assurance and inspection standards, including waterproofing tests for electrical components and compliance with NTCIP 1203 v03.05. Contractors must adhere to Buy America provisions, utilize LCPtracker Pro for electronic certified payroll, and coordinate closely with Union Pacific Railroad and utility providers like PG&E and AT&T. Work must commence within 55 calendar days of contract approval, with liquidated damages applicable for delays in ramp completion.
General Info
Place of Performance
Los Molinos, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
