Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction On State Highway In Monterey County At Various Locations From Main Street Overcrossing To 0.7 Mile South Of De La Torre Street

Closed
20260710033State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract entails the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water supplies. The project requires integrated engineering solutions to meet regulatory standards for drinking water safety, with scope covering all phases from site preparation to system commissioning, ensuring seamless integration with existing infrastructure. All work must comply with industry best practices and performance benchmarks for PFAS mitigation. Interested parties must submit responses by September 3, 2026, under solicitation number lacsd-surface-water-pfas-removal-project-no-251-ca, with the project designated for Disadvantaged Business Enterprise participation under Department of Transportation guidelines. The North American Industry Classification System code is 237310, reflecting wastewater and sewage system construction. The contracting entity is Pyramid Building & Engineering, Inc., and inquiries should be directed to John Garrison at estimating@pyramidbuilding.net or 760-949-9005. Performance is limited to California locations, with no specified city or zip details provided for the worksite.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 22 days
NAICS: 237310
New
SLED
2026/2027 Street Rehabilitation
Solicitation # 20260811030
The City of Yucaipa is soliciting bids for the 2026/2027 Street Rehabilitation project, identified as Project No. 11256. This public works construction project involves the rehabilitation of various street segments, including Fremont Street and Calimesa Boulevard. The scope of work encompasses asphalt concrete paving, full width milling, full depth removals and patching, AC overlays, and geogrid installation. Additional requirements include the adjustment of sewer manholes and water utility valve covers to grade, construction of asphalt concrete dikes, installation of new signage, and the application of pavement striping and markings. All work must adhere to the Standard Specifications for Public Works Construction (Greenbook), Caltrans standards, and City Engineer specifications. The contract will be awarded to the lowest responsible bidder based on the total bid amount for Base Bid Schedule A. Bidders must provide proof of a valid California Contractor’s License, comply with California Labor Code prevailing wage and apprenticeship requirements, and maintain comprehensive insurance coverages, including General Liability and Automobile Liability of 5 million dollars per occurrence. Required surety bonds include bid, performance, payment, and maintenance bonds. The successful contractor must start work within 15 calendar days of the Notice to Proceed and complete all activities within 40 working days. Proposals must be submitted as physical hard copies in sealed envelopes to the Yucaipa Public Works Department by the specified deadline.
City of Yucaipa

POSTED

about 7 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

The project involves construction and traffic mitigation work on State Highway 101 in Monterey County between post mile 77.0 and 84.5, focusing on reducing crossing and left-turn movements at 11 designated locations. Key activities include closing median openings, installing approximately 8,100 linear feet of Double Thrie Beam Barrier (Type M) with transition railings and end anchors, roadway excavation, placement of Class 2 aggregate base and Hot Mix Asphalt Type A, cold planing, and vegetation control. Drainage improvements involve adjusting inlets and pouring concrete aprons, while lighting systems will be modified and new flashing sign panels installed on local roads. All work must comply with environmental protection standards, particularly within 250–500 feet of protected biological resources, and adhere to Buy America requirements per 2 CFR 184.6 and 23 CFR 635.410, mandating U.S.-manufactured materials. Traffic control measures must be maintained across all active work zones, and the project is scheduled for completion by February 26, 2027. The contract, issued by the California Department of Transportation (Caltrans) under solicitation number 20260710033 and contract number 05-1S5904, is structured as a fixed-price construction contract with detailed bid line items for materials and services including roadway excavation, paving, signage, and mobilization, though no unit prices or total contract value are disclosed. Laminated wood box posts, where used, must be treated per AWPA U1 Commodity Specification F, Use Category UC4A, waterproofed using AMS-STD-595A color 20122 in accordance with MPI Standard 132, and permanently labeled with a corrosion-resistant metal plate displaying the manufacturer’s details, fabrication date, and contract number. Inspection and acceptance occur at the project site, with ESA signs required to be weatherproof, fade-proof, 8.5–11 inches high, legible from 20 feet, and secured with tie wire or locking fasteners. Contractors must submit a Site Safety and Health Plan at least 15 days before work begins, maintain a certified Safety Representative on-site, and report all incidents immediately. Payment processing is handled through Caltrans’ online system, and monthly subcontractor payment reports are required. While formal FAR clauses are not identified, compliance with state and federal construction standards

General Info

Highway improvements on Route 101 include median closures, barrier installation, paving, drainage upgrades, and new signage with traffic control.

Agency

State of California Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Chualar, CA, 93925, USA

Set-Aside

NONE

Documents

(6)

Addendum No. 2 for 05-1S5904 Monterey County Highway Construction

PDFamendment

05-1S5904plans Project Control and Survey Data

PDFspecifications

California Construction Wage Determination CA20260018 Revision 6

PDFwage-determination

05-1S5904ad1plans_1785528126586.pdf

PDF

Contract No. 05-1S5904 Special Provisions and Notice to Bidders for Highway Construction in Monterey County

PDFspecial-provisions

Addendum No. 1 for Project 05-1S5904 Monterey County Highway Construction

PDFamendment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyState of California Department of Transportation
Contacts1 person available
OfficeN/A
Organization / Agency
State of California Department of Transportation
View Agency Profile
Office AddressN/A
Contacts
Benjamin Jensen

Full Description

Show more
Bid #05-1S5904: The project involves reducing crossing and left-turn movements on Route 101 in Monterey County across 11 locations. Key work includes closing median openings and installing approximately 8,100 LF of Double Thrie Beam Barrier (Type M), along with transition railings and end anchors. The scope also covers roadway excavation, placing aggregate base and hot mix asphalt, cold planing, and vegetation control. Drainage systems will be modified by adjusting inlets and placing concrete aprons. Additionally, the project includes modifying existing lighting systems and installing new flashing sign panel systems on local roads. Extensive traffic control will be required across the various work zones spanning from post mile 77.0 to 84.5.