Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Construction On State Highway In Solano County At Various Locations From 0.2 Mile South Of Route 80/29 Separation To Nut Tree Road Overcrossing

Active
20260717016State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to safety improvements along State Route 80 in Solano County, covering 22 off-ramp and connector locations between 0.2 mile south of the Route 80/29 separation and the Nut Tree Road overcrossing. The scope encompasses the removal of existing guardrails and installation of new Midwest Guardrail Systems featuring both wood and steel posts, Type 60MS concrete barriers, transition railings, and terminal end treatments. Pavement delineation includes new thermoplastic striping, pavement markings, and non-glass retro reflective markers, alongside the installation and removal of roadside signs. Erosion control measures such as fiber rolls and hydroseeding will be applied to disturbed areas, and extensive traffic control measures, including nighttime closures of lanes, ramps, and connectors, are required to execute the work under safe conditions. All materials must comply with applicable standards including ASTM specifications for steel, concrete, and coating, and must adhere to Buy America requirements under 23 CFR 635.410, mandating U.S. origin for iron, steel, and manufactured products. Concrete components must meet Tier 3 precast standards with compressive strength, slump, and air content testing conducted in accordance with ASTM protocols, while retroreflective markers must retain at least 50% of initial reflectivity. Environmental Product Declarations for hot mix asphalt and concrete must be submitted through DIME and conform to product category rules. The project requires use of Tier 4 diesel engines for off-road vehicles, with pre-submission of vehicle inventories to Caltrans, and mandates compliance with CARB emissions standards, subject to a $2,000 daily penalty for noncompliance. Electronic certified payrolls must be filed via LCPtracker Pro, and utilization reports are required for DVBE and DBE participation. The solicitation number is 04-1Y0004, issued by the California Department of Transportation, with bids due electronically via the Bid Express portal by August 18, 2026. The contract is structured as a construction solicitation with no specified pricing data or total estimated value, indicating all line items are to be bid as unit prices or lump sums without disclosed cost expectations. Inspection and acceptance occur on-site at project locations, overseen by Caltrans engineers, with the contractor responsible for quality control, including employing ACI-certified technicians for concrete testing. Materials must be manufacturer-prepackaged and properly marked with manufacturer name, serial number, lot

General Info

Install guardrails, concrete barriers, striping, and signs on SR-80 off-ramps with erosion control and nighttime traffic closures.

Agency

State of California, Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Vacaville, CA, USA

Set-Aside

NONE

Documents

(4)

Contract No. 04-1Y0004 Special Provisions and Notice to Bidders for Solano County Highway Construction

PDFnotice-to-bidders

Addendum No. 1 for 04-1Y0004 Construction Project in Solano County

PDFamendment

State of California HSIMG-0802(379) Project Plans for Solano County Highway Construction

PDFproject-plans

04-1Y0004ad1plans_1785874323765.pdf

PDFother

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyState of California, Department of Transportation
Contacts1 person available
OfficeN/A
Organization / Agency
State of California, Department of Transportation
View Agency Profile
Office AddressN/A
Contacts
Ahmed RahidProject Manager

Full Description

Show more
Bid #04-1Y0004: The project involves safety improvements at 22 off-ramp and connector locations along State Route 80 in Solano County. The scope of work includes the removal of existing guardrails and the installation of new Midwest Guardrail Systems (MGS) with both wood and steel posts, concrete barriers (Type 60MS), and associated transition railings and terminal end treatments. Pavement delineation work consists of new thermoplastic striping, pavement markings, and markers. The project also includes the installation and removal of new roadside signs. Erosion control measures, such as fiber rolls and hydroseeding, will be implemented in disturbed areas. Extensive traffic control, including night-time lane, ramp, and connector closures, will be required to perform the work.

Similar Contracts

Same NAICS industry code

More opportunities from State of California, Department of Transportation

Same awarding agency

NAICS: 236220
SLED
Caples Lake Maintenance Station Dormitory, Sand Storage, and Generator Building
Solicitation # 20260724021
The project involves the demolition of an existing sand storage building and the construction of a new four-story dormitory building, a new sand storage facility, and the renovation of an existing generator building at the Caltrans Caples Lake Maintenance Station. The scope encompasses extensive site work including roadway excavation, paving with HMA and Class 2 AB material, installation of retaining walls, and new drainage systems comprising RCP, flared end sections, and RSP, along with temporary water pollution control measures. Building construction requires concrete foundations, structural steel, masonry, and full integration of architectural, structural, mechanical, electrical, plumbing, and fire protection systems, all to be executed in a high mountain environment with strict environmental and material handling constraints. Materials must be stored in weathertight enclosures, protected from freezing and direct sunlight, and maintained within ambient temperature ranges of 45°F to 90°F; coatings and sensitive products require adherence to manufacturer specifications, including dehydration and sealing prior to shipment. All work must comply with referenced industry standards such as ASTM A36/A36M, NEMA 250, NFPA 80, UL 325, and AISI S240, and acceptance testing must adhere to the latest NETA Acceptance Testing Specification, with inspections conducted on-site by the contractor and verified by the Engineer. Bids are solicited under solicitation number 20260724021, with a response deadline of August 27, 2026, and the work is classified under NAICS code 236220 for construction of buildings. The procuring agency is the California Department of Transportation, and submissions must be made in both electronic and hard-copy formats using approved digital file types such as PDF, JPG, and MPEG, with proper file labeling and metadata retention. Bidders must declare their small business enterprise status with certification from the California Department of General Services, and any request for small business preference requires submission of formal commitment and confirmation forms; failure to provide these renders the bid nonresponsive. Contractors must also submit installer qualification statements, manufacturer certifications on official letterhead, and all system passcodes and passwords no later than 14 days before final completion. While no contract value is disclosed and no explicit evaluation factors, payment details, or contract type are provided, the project requires strict compliance with quality assurance provisions, including shop drawings, product data, welder qualifications, and inspection reports. Delivery and performance are to occur at the job
Commercial and Institutional Building Construction

POSTED

20 days ago

DEADLINE

in 11 days
View Details