This Solicitation opportunity from California was posted on July 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Construction On State Highway In Solano County At Various Locations From 0.2 Mile South Of Route 80/29 Separation To Nut Tree Road Overcrossing
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to safety improvements along State Route 80 in Solano County, covering 22 off-ramp and connector locations between 0.2 mile south of the Route 80/29 separation and the Nut Tree Road overcrossing. The scope encompasses the removal of existing guardrails and installation of new Midwest Guardrail Systems featuring both wood and steel posts, Type 60MS concrete barriers, transition railings, and terminal end treatments. Pavement delineation includes new thermoplastic striping, pavement markings, and non-glass retro reflective markers, alongside the installation and removal of roadside signs. Erosion control measures such as fiber rolls and hydroseeding will be applied to disturbed areas, and extensive traffic control measures, including nighttime closures of lanes, ramps, and connectors, are required to execute the work under safe conditions. All materials must comply with applicable standards including ASTM specifications for steel, concrete, and coating, and must adhere to Buy America requirements under 23 CFR 635.410, mandating U.S. origin for iron, steel, and manufactured products. Concrete components must meet Tier 3 precast standards with compressive strength, slump, and air content testing conducted in accordance with ASTM protocols, while retroreflective markers must retain at least 50% of initial reflectivity. Environmental Product Declarations for hot mix asphalt and concrete must be submitted through DIME and conform to product category rules. The project requires use of Tier 4 diesel engines for off-road vehicles, with pre-submission of vehicle inventories to Caltrans, and mandates compliance with CARB emissions standards, subject to a $2,000 daily penalty for noncompliance. Electronic certified payrolls must be filed via LCPtracker Pro, and utilization reports are required for DVBE and DBE participation. The solicitation number is 04-1Y0004, issued by the California Department of Transportation, with bids due electronically via the Bid Express portal by August 18, 2026. The contract is structured as a construction solicitation with no specified pricing data or total estimated value, indicating all line items are to be bid as unit prices or lump sums without disclosed cost expectations. Inspection and acceptance occur on-site at project locations, overseen by Caltrans engineers, with the contractor responsible for quality control, including employing ACI-certified technicians for concrete testing. Materials must be manufacturer-prepackaged and properly marked with manufacturer name, serial number, lot
General Info
Place of Performance
Vacaville, CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
