Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on November 19, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction, Park Boulevard Extension From FM 2514 to SH 78

Closed
2024-458State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
DEMOLITION OF THE CAMP HILL SQUARE APARTMENTS
Solicitation # 2027-RFP-033
Solicitation 2027-RFP-033 is a request for proposals issued by the Housing Opportunities Commission of Montgomery County (HOC) for the demolition of the Camp Hill Square Apartments in Gaithersburg, Maryland. The project scope involves the demolition of five apartment buildings containing 51 vacant units and a management office, including the removal of all above-grade structures, slabs, foundation walls, footers, and lead walks. While above-grade utilities must be removed, underground utilities are to be capped or abandoned in place, and all asphalt, curbs, and gutters are to remain. Additionally, the contractor is responsible for removing dumped materials from the neighboring Emory Grove Village parcel. The initial period of performance is four months from the Notice to Proceed, and the contractor is responsible for obtaining all necessary raze permits and adhering to the Montgomery County Approved Sediment Control Plan. Proposals must be submitted via the OpenGov Procurement Portal by November 13, 2026, at 12:00 pm. Evaluation is points-based, with 20% of the score weighted toward the schedule and 15% toward the price proposal. Award criteria emphasize safety, expedited completion, and quality assurance. Mandatory requirements include 100% payment and performance bonds, comprehensive insurance, and strict adherence to HOC Contractor and Subcontractor Background Screening Requirements. Compliance with the HOC Works Program, Davis-Bacon Wages, Maryland Prevailing Wage Laws, and HUD certifications regarding debarment and suspension is required. Payment terms include a 30-day processing window following approval, with a 5% retainage held until final acceptance by HOC.
Real Estate

POSTED

about 6 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

Collin County, Texas, has issued a solicitation for bids on the 2024-458 project, which involves the construction of the Park Boulevard Extension from FM 2514 to SH 78. The project aims to develop a four-lane segment of an eventual six-lane divided roadway, including significant infrastructure such as an underground storm sewer system, a 1,300-foot bridge over the Kansas City Southern railroad, open channels, culverts, embankments, retaining walls, and various roadway components like concrete pavement, sidewalks, signage, pavement markings, guard fences, and railings. The scope also encompasses the removal of existing pavement, temporary traffic control measures, and other necessary elements to ensure a fully operational roadway segment. The estimated construction cost is approximately $44.2 million, reflecting the project's scale and complexity. The contract is open for bids until January 23, 2025, and is managed by Collin County, with Ruyue Ding serving as the primary contact. The project falls under the NAICS code 238910, indicating its focus on site preparation, paving, and roadway construction. Interested bidders can find additional details and submit their proposals through the designated procurement portal. The project emphasizes comprehensive infrastructure development to improve transportation connectivity in the area, with a focus on quality construction and adherence to specified technical requirements.

General Info

Place of Performance

TX, USA

Set-Aside

NONE

Documents

10

2024-458 Construction, Park Boulevard Extension From FM 2514 to SH 78

PDF, High priority: read this firstifb
High

IFB 2024-458 Bid Bond Form

DOC, High priority: read this firstbid-bond
High

IFB No. 2024-458: Construction, Park Blvd

PDF, High priority: read this firstifb
High

005200 W-9 Form

PDF, Low priorityother
Low

005213 Construction Agreement - Collin County, Texas

DOCX, Low prioritycontract-document
Low

Conflict of Interest Questionnaire (Form CIQ)

PDF, Low priorityother
Low

IFB 2024-458 Maintenance Bond - Park Boulevard Extension

DOC, Low priorityother
Low

IFB 2024-458 Payment Bond - Park Boulevard Extension

DOC, Low priorityother
Low

IFB 2024-458 Performance Bond - Park Boulevard Extension

DOC, Low priorityother
Low

IFB 2024-458 Product Substitution Request Form

DOCX, Low prioritysupporting-documents
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Collin County
Contacts1 person available
OfficeN/A
Organization / AgencyTexas → Collin County
Office AddressN/A
Contacts

Full Description

Show more
NOTICE IS HEREBY GIVEN that Collin County, TX invites sealed bids for 2024-458, Construction, Park Boulevard Extension From FM 2514 to SH 78.The Park Boulevard Extension Paving and Drainage Improvements project includes construction of 4-lanes of an ultimate 6-lane divided roadway from just west of Parker Road to just north of State Highway 78 with an underground storm sewer system, a 1,300-foot bridge over the Kansas City Southern (KCS) railroad, open channels and culverts. Other major items of work include construction of embankment and retaining walls for elevated sections of the roadway, unclassified roadway excavation, reinforced concrete pavement and sidewalks, storm sewers, culverts and headwalls, inlets and manholes, concrete rip-rap and protection stone rip-rap, signs and pavement markings, metal beam guard fence, and railing. Additional items of work include removal of existing reinforced concrete and asphalt pavement, temporary traffic handling devices and temporary asphalt pavement and other items to provide a complete operable section of roadway.The opinion of probable construction cost for this contract is $44,204,131.00.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS