Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 5, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Construction Project Management Services to Support Salton Sea SCH Project

Closed
0000039492State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
R.T. Orr Dam Geotechnical Investigations
Solicitation # 2026-05
The Upper Thames River Conservation Authority is soliciting proposals for geotechnical investigations and assessments of the R.T. Orr Dam located in Stratford, Ontario. The project, which initiates in 2026 and must be substantially completed by March 15, 2027, is based on recommendations from a 2023 Dam Safety Review by D.M. Wills Associates Limited. The scope of work includes reviewing existing structural data, conducting a detailed seepage investigation at the downstream left armour stone retaining wall, performing supplementary field investigations for embankment slope stability, installing two nested monitoring wells in both earth embankments, and updating stability analyses for armour stone structures. All work must adhere to the LRIA Technical Bulletin for Geotechnical Design and Factors of Safety and meet Ontario Accessibility Standards for electronic deliverables. Proposals must be submitted electronically via the bids and tenders platform by 3:00 PM Eastern Daylight Time on November 18, 2026. The selection process utilizes a two-envelope system where technical qualifications in Envelope A are evaluated before the cost proposal in Envelope B is opened. Award decisions are based on best value, considering experience, understanding of the work, proposed methodology, schedule, and cost reasonableness. Selected consultants must provide proof of professional licensing, WSIB standing, and required insurance policies, while maintaining strict confidentiality regarding project information.
Upper Thames River Conservation Authority

POSTED

about 8 hours ago

DEADLINE

in 21 days
NAICS: 541330
New
SLED
Oso Parkway/Pacific Park Drive/Glenwood Drive Regional Traffic Signal Synchronization Project
Solicitation # 20261026016
The City of Aliso Viejo is soliciting proposals for a professional licensed consultant to provide regional traffic signal synchronization services for the Oso Parkway, Pacific Park Drive, and Glenwood Drive corridor. The project involves coordinating traffic signals across multiple jurisdictions, including the Cities of Aliso Viejo, Laguna Hills, Mission Viejo, Laguna Niguel, the County of Orange, and Caltrans, extending from Moulton Parkway to the SR-241 Northbound On-Ramp. The projected period of performance is from April 1, 2027, to September 30, 2030. The selected consultant will be responsible for providing all necessary labor, materials, and equipment to implement optimized signal timing in accordance with the Regional Traffic Signal Synchronization Master Plan and the City's Local Signal Synchronization Plan. Proposals are due by December 2, 2026, and must be submitted as one hard copy and one electronic PDF on a USB drive, with the cost proposal in a separate sealed envelope. Award decisions will be based on a weighted evaluation of the consultant's ability and skills, character and reputation, cost reasonableness, ability to meet time requirements, financial resources, and previous experience with the vendor. The contract is governed by the laws of the State of California with venue in Orange County. Key requirements include compliance with California prevailing wage laws, adherence to the City's Minority Business Enterprise program, and the submission of annual political contribution disclosures.
City of Aliso Viejo

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 541330
New
SLED
Buckhead CID Livable Centers Initiative Master Plan
Solicitation # 2026-10
The Buckhead Community Improvement District is soliciting proposals for the Buckhead Livable Centers Initiative Master Plan, a project aimed at updating the 2017 LCI plan to improve accessibility, walkability, and transit use. The scope of work focuses on the Buckhead and Lenox MARTA station areas and their connected mixed-use districts. Key deliverables include an existing conditions assessment report, a regulatory code study and audit, and the advancement of both a central gathering place/park plan and a walkable streetscape prototype to 30 percent completion. The total budget for this project is 300,000 dollars, with payments made via monthly invoices and progress reports. The project is funded through the Atlanta Regional Commission’s Livable Centers Initiative program and must adhere to federal regulations 49 CFR Part 18 and 49 CFR Part 26 regarding competitive procurement and Disadvantaged Business Enterprise participation. Additionally, the contractor must comply with the Georgia Security and Immigration Compliance Act and the Clean Air Act Amendments of 1990. The performance period begins with a notice to proceed on December 21, 2026, with a project kickoff in January 2027 and a final completion deadline of November 19, 2027. Selection will be based on the consultant's qualifications, prior experience, proposed approach, and understanding of the local Buckhead context.
Buckhead Community Improvement District

POSTED

about 11 hours ago

DEADLINE

in 16 days

AI Contract Overview

Show more

The California Department of Water Resources is soliciting qualified firms to provide expert technical advisory and consulting services for the Salton Sea Species Conservation Habitat Design-Build Project at the New River, with an estimated contract value between $5 million and $10 million. The solicitation, identified by number 0000039492 and posted on June 5, 2026, with a response deadline of June 26, 2026, is a Request for Qualifications (RFQ) under NAICS code 541330, targeting firms with proven capabilities in construction management, contract administration, inspection, project management, and related engineering services. Proposals must be submitted as a Statement of Qualification (SOQ) in text-readable PDF format, accompanied by mandatory documents including the signed Potential Qualified Firms Certification Sheet, Generative AI Disclosure Form, Certification Regarding Lobbying, Conflict of Interest Statement, references from the past five years (at least one non-DWR), and a completed SOQ Checklist. The SOQ is limited to 50 pages excluding resumes, licenses, certifications, and administrative exhibits. Submissions must be emailed to David Barber or delivered via USB drive by appointment, with late submissions returned unopened. Selected firms will undergo an interview process following an initial pass/fail screening for completeness and compliance. Contract performance will be governed by a task-order basis under Exhibit A, Scope of Work, detailing required deliverables such as daily inspection reports, construction schedule and delay analyses, constructability reviews, environmental compliance documentation under CEQA, as-built drawings, and Notice of Exemption forms. Contractors must provide comprehensive inspection services across civil, structural, electrical, mechanical, and commissioning disciplines, including materials testing reviewed and approved by a licensed California civil engineer. Key personnel, clearly identified in the firm’s organization chart, are expected to remain engaged throughout the contract term, and subcontractor use is permitted with a 3% markup cap. The contract is based on the Department’s Standard Agreement (STD. 213), with costs structured as actual expenses plus a fixed DWR-established profit rate, invoiced monthly in arrears and paid within 45 days of receipt. Contractors must comply with California state laws, prevailing wage requirements, the Americans with Disabilities Act, and federal regulations including the Clean Air Act and Federal Water Pollution Control Act, and adhere to FEMA reimbursement protocols under 2 CFR Part 200, Appendix II. Additional requirements include bonding for public works exceeding

General Info

California DWR seeks firms for $5-$10M Salton Sea habitat construction management, due June 26, 2026.

Place of Performance

CA, USA

Set-Aside

NONE

Documents

1

RFQ 10219665 Construction Project Management Services for Salton Sea SCH Project

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Water Resources
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
The Department of Water Resources (DWR), Division of Engineering, invites qualified firms to submit a Statement of Qualification (SOQ). The contractor will provide expert technical advice and consultation in the areas of construction management and contract administration, inspection, project management and other CPMS related engineering and management services for the Salton Sea Species Conservation Habitat (SCH) Design-Build Project at the New River. Estimated Contract Value: $5,000,000 - $10,000,000.

More opportunities from California Department of Water Resources

Same awarding agency

NAICS: 611430
New
SLED
RFP Secondary # 10222291 - PMBOK
Solicitation # 0000040802
The California Department of Water Resources is soliciting bids under solicitation 0000040802 to develop a training program and provide consulting services aimed at implementing consistent project management business practices. The contractor will be required to analyze existing departmental practices and provide practical application training and guidance based on the Project Management Institute's PMBOK Guide and Department Administration Manual 7900. Key deliverables include the production of instructional materials, manuals, and digital media, with additional specific services to be authorized through individual work orders. The contract is awarded to the highest scored responsive and responsible bidder, with specific preferences applied for certified Small Businesses and Disabled Veteran Business Enterprises. Key personnel must possess a PMP certification, at least 10 years of PMBOK-based project management experience, 5 years of instructional experience in PMBOK courses, and 5 years of experience with State of California processes. Proposers must adhere to a minimum 3.0 percent DVBE participation commitment and provide comprehensive insurance coverage, including commercial general liability and automobile liability. Proposals must be submitted under sealed cover by November 18, 2026. Administrative terms include a 10 percent payment retention clause, a 30-day termination notice for convenience, and a requirement to renew Contractor Certification Clauses every three years. All copyright works created during the performance of the agreement remain the property of the State.
Professional and Management Development Training

POSTED

about 10 hours ago

DEADLINE

in 21 days
View Details
NAICS: 532412
New
SLED
IFB 10222581 for Crane Rental with Operator, Oiler, and Rigger/Signal Person Services.
Solicitation # 10222581
The California Department of Water Resources issued Invitation for Bid 10222581 to secure as-needed crane rental services for the Oroville Field Division. The contractor is required to provide fully maintained cranes ranging from 30 to 300 tons, along with certified operators, oilers, and rigger/signal persons, to support routine services and unanticipated equipment failures. The anticipated contract term is three years, with a start date of June 1, 2027. Performance will take place at the Oroville Field Division and various other worksites within the department's jurisdictional boundaries. Key requirements include mandatory NCCCO certification for all operators and strict adherence to California Code of Regulations General Industry Safety Orders. Equipment must comply with Air Quality Management District rules, and the contractor must maintain a valid California Air Resource Board Certificate of Compliance. Bidders must commit to a minimum 3% Disabled Veteran Business Enterprise participation rate and pay workers the prevailing wage. The contract includes specific insurance mandates for general liability, workers compensation, and automobile liability. Bids are evaluated based on responsiveness and responsibility, with calculation preferences available for certified Small Businesses and those subcontracting with Small Businesses.
Construction, Mining, and Forestry Machinery and Equipment Rental and Leasing

POSTED

about 22 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 213115
New
SLED
IFB 10222937 Geological Exploration Drilling
Solicitation # 10222937
The California Department of Water Resources is soliciting bids for geological exploration drilling in the Salton Sea watershed to support vegetation enhancement projects at dust suppression areas. The contract consists of a one-year base term starting in February 2027, with two optional one-year extensions. Key technical requirements include reaming exploratory holes to a 16-inch diameter at depths of 800 feet and installing triple nested monitoring wells and extraction wells using SCH80 PVC casing. Bidders must possess a C-57 Water Well Drilling License, and personnel must document at least five years of applicable experience along with current certifications in First Aid, CPR, Defensive Driving, and Sexual Harassment Prevention. The contract will be awarded to the lowest responsible bidder based on the total bid amount for all years. Bidders must commit to a minimum of 3 percent Disabled Veteran Business Enterprise participation and provide performance and payment bonds equal to 100 percent of the contract amount. Bids are due by December 9, 2026, at 4:00 PM and must be submitted under sealed cover, including both a hardcopy and an electronic version on a USB drive. Payment is processed monthly in arrears within 45 days of receiving an undisputed invoice, with a 10 percent retention held until 30 days after the satisfactory completion of work as verified by the DWR Contract Manager.
Support Activities for Nonmetallic Minerals (except Fuels) Mining

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS