Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Contra Costa Regional Medical Center Cafeteria Replacement, Project No. WW1068, CP#26-05

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Contra Costa Regional Medical Center will replace its aging two-story cafeteria and adjacent Ward E building with a new three-story, earthquake-resistant South Wing Cafeteria to meet the California Department of Health Care Access and Information’s non-structural performance category 5 standards by January 1, 2030. The existing structures, built in the early 1950s, do not comply with current seismic safety requirements, necessitating the full demolition of Ward E and partial demolition of the cafeteria, removing about 25,600 square feet of floor space. The new cafeteria will span approximately 38,200 square feet, constructed largely within the footprint of the demolished buildings, and will be fully electric with no natural gas connections. The project includes new pedestrian walkways, landscaping with specimen trees, bioretention planters, hardscaping, and outdoor furniture to enhance campus aesthetics and functionality. Utility extensions for water, sewer, electrical, steam, storm drain, and telecommunications will be installed to connect the new building to existing lines between the Martinez Health Center and the main CCRMC building. Construction is scheduled to begin in November 2026 and last approximately 2.5 years, requiring comprehensive site management including temporary traffic control with valet parking, shuttle services for staff and construction workers, and coordination for hospital and construction deliveries. Approximately 25 landscape trees will be removed, with appropriate trimming and vegetation management conducted in compliance with environmental regulations. Hazardous materials, including asbestos and lead-based paint, have been identified in the existing Ward E building and will be professionally abated prior to demolition in accordance with state and federal requirements, with all debris disposed of off-site. The project will adhere to the California Green Building Standards Code and is targeting LEED Silver certification. Environmental permits will be secured prior to construction, and Best Management Practices will be implemented to prevent water pollution during site work. The project is managed by Contra Costa County with primary contacts including Syd Sotoodeh, Senior Planner, and Christian Montoya, Project Manager.

General Info

Replace aging cafeteria and Ward E with new electric, seismic-resistant South Wing cafeteria by 2030, targeting LEED Silver.

Agency

California → Contra Costa County

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Alhambra Avenue and C Street, Martinez, CA, 94553

Set-Aside

NONE

Documents

(1)

CP#26-05-NOE CCRMC Cafeteria Replacement Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Contra Costa County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Contra Costa County
Office AddressN/A
Contacts
Syd SotoodehSenior Planner
Christian MontoyaProject Manager

Full Description

Show more
The California Department of Health Care Access and Information (HCAI) requires that all general acute hospital buildings must meet non-structural performance category (NPC) 5 standards by January 1, 2030. The purpose of this project is to comply with NPC-5 standards by replacing the existing two-story cafeteria with a new, more earthquake-resistant, three-story cafeteria at the Contra Costa Regional Medical Center (CCRMC) campus. The project is necessary because the existing Cafeteria and Ward E buildings were built in the early 1950s and do not meet current NPC standards mandated by HCAI. The project proposes to fully demolish the existing Ward E building and partially demolish the existing Cafeteria building, which would remove approximately 25,600 square feet of floor area. The new South Wing Cafeteria building will be constructed on the CCRMC campus, roughly within the footprint of the existing Ward E building and the demolished portion of the existing cafeteria and add approximately 38,200 square feet of floor area. Additional exterior features will include adding pedestrian walkways, landscaping, new specimen trees, bioretention planters, hardscaping, as well as furniture. Associated water, sewer, electrical, steam, storm drain, and telecommunication utility extensions are needed to connect existing utility lines located between the Martinez Health Center building and main CCRMC building to the new South Wing Cafeteria building. Natural gas lines will be omitted from this all-electric building. Tree and vegetation trimming and removal will be required; the project anticipates removal of approximately 25 landscape trees. A temporary traffic control system will be implemented consisting of valet parking for patients, a shuttle service to off-site parking for hospital staff and construction workers, and traffic control for deliveries to the hospital and construction site. Appropriate Best Management Practices (BMPs) for water pollution control will be implemented during construction. Hazardous materials including asbestos containing materials and lead containing paint and materials have been identified in the existing Ward E building. All hazardous materials will be abated prior to demolition in compliance with applicable regulations. Applicable environmental permits will be obtained, and hazardous building materials will be properly disposed of off-site. The project would comply with the current California Green Building Standards (CALGreen) Code as required by HCAI and is anticipated to achieve Leadership in Energy and Environmental Design (LEED) Silver standards. Construction is anticipated to begin in November 2026 and take approximately 2.5 years.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Bicentennial Mall SP WWII Globe Vault Replacement
Solicitation # 32701-13972
This contract involves a one-time purchase by the Tennessee Department of Environment and Conservation for the replacement of the WWII Globe vault and Kugel at Bicentennial Mall State Park in Nashville, Tennessee. The project requires the complete removal of a 20,000-pound granite globe, thorough cleaning of the granite socket, leak testing of existing piping with dry nitrogen at 80 psi over 48 hours, and the installation of a new concrete foundation measuring seven by ten feet by six inches thick with reinforced welded wire. The new mechanical vault must be a prefabricated fiberglass shell measuring 60 inches wide by 90 inches long by 72 inches deep with at least one foot of topsoil cover, and must include a pump control disconnect, a 450-gallon collector tank with automatic fill valve, filter pump, fine particulate backwash filter, chlorinator, sump pump, and an exhaust fan rated at minimum 180 CFM operated by a door switch. All work must comply with State-approved versions of the IBC, manufacturer specifications, industry best practices, and be approved by Facilities Management. The contract is subject to the availability of state or federal funds and requires adherence to Tennessee-specific statutes and regulations rather than standard federal FAR clauses. All bidders must be registered in the Tennessee Supplier Portal and hold an active Tennessee contractor license under the BC, BC-B, BC-B(sm), or BC-C classification as mandated by Tenn. Code Ann. § 62-6-101 et seq. Additional mandatory requirements include registration with the Tennessee Department of Revenue, certification of compliance with the Iran Divestment Act and the prohibition of boycotts of Israel under Tennessee law, attestation regarding foreign adversary companies under Public Chapter 768 (2026), and certification that neither the bidder nor any of its principals or subcontractors are debarred, suspended, or have been terminated for cause within the past three years. A $1,000,000 commercial general liability insurance policy, a $1,000,000 workers’ compensation policy with specific per-accident and per-employee limits, and an automobile liability policy with a minimum $1,000,000 combined single limit are required. A payment bond equal to 25% of the Maximum Liability must be provided, and a Certificate of Insurance must be submitted at least ten business days prior to the contract effective date. The response deadline is September
Tennessee Department of Environment and Conservation

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
SLED
7289 South End Branch Library (Re-Ad)
Solicitation # BD-27-1142-PFD01-PFD01-132077
The project involves the complete demolition of the existing South End Branch Library in Boston, Massachusetts, with the construction of a new, fully electric, two-story facility to serve as a branch of the Boston Public Library. The new building will include reading areas, meeting spaces, staff work areas, and supporting functions, while retaining only the basement retaining walls from the old structure, which will be infilled with structural fill. Minor site improvements adjacent to the building include replacement of landscape elements and updated hardscape paver zones within the nearby park. The contract is structured as a two-phase procurement: Phase I is a Request for Qualifications (RFQ) to prequalify contractors based on their Statements of Qualifications, and Phase II is an Invitation for Bids (IFB) where prequalified firms submit price proposals, suggesting an award will be based on lowest price after technical acceptance. The estimated project cost is $24,340,000, with performance scheduled from March 24, 2027, to March 24, 2029. All work must comply with Massachusetts General Laws, Chapter 149, Sections 44D½ and 44D³, which govern public construction procurement and contractor prequalification. Submission requires a Statement of Qualifications accompanied by a DCAMM Certificate, a DCAMM Update Statement, and a Commitment Letter, with proposals accepted either in person at 26 Court Street, First Floor, Boston, MA 02108, or electronically through the Trimble Unity Construct portal. The solicitation window opened on August 10, 2026, and closes on September 10, 2026; no federal contract clauses apply, as this is a state-funded municipal project administered by the City of Boston’s Public Facilities Department. Bidders must be prequalified under state law, and while no formal contract type is specified, the procurement process implies a Firm-Fixed-Price structure. No contract line items, payment details, invoicing systems, or contracting officer representatives are listed, and inspection and acceptance responsibilities are implied but not explicitly assigned.
PFD01 - Public Facilities Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 236220
New
Enlisted Unaccompanied Personnel Housing at Eglin AFB, FL
Solicitation # enlisted-unaccompanied-personnel-housing-eglin-afb-fl
The contract is for the construction of two two-story enlisted unaccompanied personnel housing barracks at Eglin Air Force Base in Florida, each accommodating 120 personnel across 32 individual dwelling units. Each unit is equipped with a kitchen, dining area, living space, and laundry room, while shared building amenities include a lobby, elevator, entrance vestibule, exercise room, day room, lounge, and dedicated mechanical, electrical, and communications rooms. The project includes parking facilities for both vehicles and motorcycles, as well as outdoor recreational amenities such as a large open pavilion, basketball court, and volleyball court. Comprehensive sitework is required, encompassing parking lots, roadways, concrete sidewalks, grading, storm sewer installation, utilities, landscaping, and related incidental work. The scope further spans all major construction trades including concrete, masonry, steel, millwork, insulation, roofing, waterproofing, drywall, flooring, paint, elevators, plumbing, HVAC, fire protection, electrical systems, fencing, and asphalt paving. The solicitation is issued under a Small Business set-aside, actively encouraging participation from Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses. The contracting entity, Roy Anderson Corp, requires potential subcontractors to submit bids by August 18, 2026, at 1:00 PM CT, with responses to be directed via email or fax. The contract incorporates mandatory equal opportunity requirements under Executive Order 11246, Section 503 of the Rehabilitation Act of 1973, and the Vietnam Era Veterans’ Readjustment Assistance Act of 1974, ensuring affirmative action for equal employment practices. While detailed pricing, contract value, and performance period are not specified, offerors must propose comprehensive bids covering labor, materials, supervision, and equipment for their assigned scopes, with no additional attachments or explicit inspection criteria provided in the solicitation.
Roy Anderson Corp

POSTED

about 11 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, Hagatna, GU
Solicitation # rfo-awp-1072-iija-zua-ccf-environmental-wing-underground-utilities-hagatna-gu
The contract solicitation RFO AWP-1072, IIJA: ZUA CCF Environmental Wing and Underground Utilities, Hagatna, GU, seeks qualified firms to undertake a major construction project involving the development of a new environmental wing and associated underground utility improvements. The scope encompasses the demolition of existing structures, full upgrades to the building’s electrical and HVAC systems, and comprehensive utility enhancements. The project exceeds $10 million in value and is classified under multiple NAICS codes including 236220, 236210, 237990, and 238110, reflecting its complexity and diverse construction activities. The initiative is funded under the Infrastructure Investment and Jobs Act and is being managed by PTSI Managed Services, Inc. with performance located in Hagatna, Guam. This solicitation is set aside exclusively for small business entities, including Small Disadvantaged Businesses, Women-Owned Small Businesses, HUBZone Small Businesses, Veteran-Owned Small Businesses, and Service-Disabled Veteran-Owned Small Businesses, in accordance with SBA guidelines. Interested parties must express interest by contacting Anna Ma, Parsons Subcontract Administrator, at anna.t-ctr.ma@faa.gov or by phone at 3602044418. The solicitation was posted on August 10, 2026, with a response deadline of August 27, 2026, and all submissions must align with the competitive and regulatory requirements for federally set-aside contracts.
PTSI Managed Services, Inc.

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
Windsor SECONDARY TREATMENT SYSTEM UPGRADES PROJECT
Solicitation # windsor-secondary-treatment-system-upgrades-project-0
The project involves a major upgrade to the Water Reclamation Facility’s secondary treatment system, requiring complete dewatering and excavation of the existing aeration basin, followed by construction of a new concrete aeration basin equipped with a flow splitting structure, air lines, diffusers, a mixing system, a surface wasting pumping system, and a high flow return pump linked to the adjacent high flow storage pond. Parallel construction includes a new blower building with integrated blowers and a dedicated electrical control building, along with a separate carbon feed building housing internal tanks and chemical metering pumps. Additional scope includes a below-grade secondary clarifier weir flow splitting structure and the relocation of a concrete sand filter high flow diversion structure. The work is scheduled to be completed within 482 working days, with defined intermediate milestones to track progress. Funding may come partially or fully through the EPA’s WIFIA program, requiring strict adherence to Section 9 of the Special Provisions governing contractor and subcontractor obligations under this federal financial assistance. Bidders must comply with Small Business Administration set-asides that prioritize Small Business, Small Disadvantaged Business, Women-Owned Small Business, and certified Disadvantaged, Minority, and Woman Business Enterprises. Pre-bid conference requirements have been met with a session held January 14, 2026. All contract documents including plans, specifications, and proposal forms are accessible at no cost via BuildingConnected and the Town of Windsor’s bidding portal, with login registration required for access. Proposals must be submitted by the response deadline of September 3, 2026. The project is managed by C. Overaa & Co. with Anna Stein as the primary point of contact, and performance is located in California.
C. Overaa & Co.

POSTED

about 11 hours ago

DEADLINE

in 23 days
View Details
NAICS: 236220
New
RFO AWP-1403, GUM ATCT Cab Replacement, Hagatna, GU
Solicitation # rfo-awp-1403-gum-atct-cab-replacement-hagatna-gu
The contract involves the demolition of the existing Air Traffic Control Tower cab level and the construction of a new cab level in Hagatna, Guam, encompassing heavy structural work as well as both exterior and interior construction components. The project is classified under NAICS code 236220 with an estimated value between five and ten million dollars, indicating a significant capital construction effort requiring specialized expertise in commercial and institutional building. The solicitation is issued under the title RFO AWP-1403, GUM ATCT Cab Replacement, and is set aside exclusively for small business categories including Small Business, Small Disadvantaged Business, Women-Owned Small Business, HUBZone, Veteran-Owned, and Service-Disabled Veteran-Owned Small Businesses, reflecting a strong emphasis on fostering participation from federally certified small and disadvantaged firms. Interested parties must respond to the solicitation before the deadline of August 27, 2026, and are directed to contact Anna Ma, the subcontract administrator at Parsons, via email at anna.t-ctr.ma@faa.gov to confirm their intent to participate. The project is managed by PTSI Managed Services, Inc., and the place of performance is clearly identified as Guam with no further location details specified.
PTSI Managed Services, Inc

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details