This Solicitation opportunity from California was posted on November 7, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
CONTRACT:25-284052; PORTERVILLE ROOF REPLACEMENT - CENTRAL SCHOOL AND LAUNDRY BLG; DEPARTMENT OF DEVELOPMENTAL SERVICES; PORTERVILLE DEVELOPMENTAL CENTER; PORTERVILLE, TULARE COUNTY, CALIFORNIA; PROJECT: 12027E and 12027F
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves a comprehensive roof replacement project at the Porterville Developmental Center in Tulare County, California, managed by the California Department of General Services' Real Estate Services Division. The scope includes removing existing roofing systems on the Central School Building and Laundry Building down to the structural deck, abating hazardous materials as necessary, and installing new roofing systems with insulation, cover boards, single-ply membranes, and rooftop fall protection. The project also entails replacing skylights with wood-framed decks and sheathing, installing new equipment curbs, and ensuring all work adheres to manufacturer installation standards and project specifications. The estimated cost is approximately 3.2 million dollars, with a project duration of 608 calendar days. Bidders must submit sealed bids by December 3, 2025, at the designated West Sacramento location, with a public bid opening scheduled for December 4, 2025. Mandatory pre-bid site inspections are required, and bidders are encouraged to register on the Cal eProcure website for updates and bid documentation access. Contractors bidding on this project must hold a valid B or C-39 license, comply with health and safety mandates issued by relevant authorities, and submit performance and payment bonds equal to 100% of the contract amount. The project emphasizes adherence to environmental regulations, including the California Air Resources Board fleet vehicle compliance, and mandates submission of Certificates of Reported Compliance prior to contract execution for any fleet vehicles involved. The bidding process incorporates specific requirements for Disabled Veteran Business Enterprise (DVBE) participation, with a minimum 3% goal, and encourages small and microbusiness subcontracting. The project manual, consisting of multiple volumes, provides detailed specifications, plans, and procedural instructions, while bid forms and supporting documentation are accessible via the Cal eProcure portal. The award will be granted based on the lowest responsible bid that meets all prescribed requirements, with evaluation criteria primarily focused on price and compliance, and no explicit evaluation factors or scoring systems detailed in the available documentation.
General Info
Place of Performance
Set-Aside
Documents
2AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- RFP 27-05 Re-Bid Sale of the Hicks Street Tot LotOpen now, due in 33 days
- RELOCATION SERVICEOpen now
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Dec 10, 2025 to Dec 3, 2025. NAICS code changed from 562211 to 531390.
Deadline has passed
Submission Closed
Organization & Contact Information
Full Description
ADVERTISEMENT FOR BIDS
PORTERVILLE ROOF REPLACEMENT - CENTRAL SCHOOL AND LAUNDRY BLG DEPARTMENT OF DEVELOPMENTAL SERVICES PORTERVILLE DEVELOPMENTAL CENTER PORTERVILLE, TULARE COUNTY, CALIFORNIA CONTRACT: 25-284052; PROJECT: 12027E and 12027F
SEALED BIDS: The Office of Business and Acquisition Services will receive Sealed Bids at 707 Third Street, West Sacramento, California 95605 before 2:00 P.M., December 03, 2025. Hand delivered bids shall be placed in the DGS/OBAS Bid/Proposal Drop Box located in the lobby.
Project comprises labor, material and services necessary for: Replace roofing system on Central School Building (12027E) and Laundry Building (12027F) including but not limited to the following. Remove existing roofing system and related accessories down to structural deck, abatement of hazardous materials as necessary. Replace with new roofing system including rigid insulation, cover board, a single-ply membrane, rooftop fall protection system, and all required flashing. Install new equipment curbs as necessary. Remove existing skylights (2) and replace with wood framed deck and sheathing. All work shall conform to the details shown and the roofing membrane manufacturer's standard installation details.
License required to bid the project: B or C-39.
Certificate of Reported Compliance (CRC) ¿ Fleet Vehicles: As a condition of Contract award, prior to Contract execution, Contractor shall submit copies of the valid CRCs for any fleet retained by the Contractor or any listed Subcontractor, for which any vehicles subject to the California Air Resources Board In-Use Off-Road Diesel Fueled Fleet Regulations, Section 2449(i), Title 12, California Code of Regulations, are used in the completion of the work included in the Contract. More information on the In-Use Off-Road Diesel-Fueled Fleets Regulation can be found at the following link: https://ww2.arb.ca.gov/our-work/programs/use-road-diesel-fueled-fleets-regulation
Health and Safety Provisions: Contractor and all subcontractors shall abide by all health and safety mandates issued by federal, state, and local governments and/or public health officers as well as those issued by DGS, and worksite specific mandates. If multiple mandates exist, the Contractor and subcontractors shall abide by the most restrictive mandate. The term ¿employee¿, ¿worker¿, ¿state worker¿ or ¿state employee¿ in health and safety mandates includes contractor and subcontractor personnel.
Costs associated with adhering to health and safety mandates are the responsibility of the Contractor. Contractor is responsible for the tracking and compliance of health and safety mandates and may be audited upon request.
Successful bidder shall furnish payment and performance bonds, each in the amount of 100 percent of the Contract price.
Prospective bidders must attend the mandatory pre bid site inspection tour on November 19th, 2025, at 10:00 A.M., at which time representatives of the State and prospective bidders shall meet at Porterville Developmental Center, Plant Operations Building, located at 26501 Avenue 140, Porterville, CA 93257.The State¿s requirements for Disabled Veteran Business Enterprise (DVBE) participation and other Contract requirements will be presented. Prime Contractors are encouraged to have their Key Administrator and DVBE office coordinator attend to receive this information and to have their questions answered. Attendance for the entire inspection is required in order for bidders to be eligible to submit a bid.
Bid forms, plans, specifications, and addenda will be available for download at http://www.caleprocure.ca.gov/. Click on ¿Start Search.¿ In the Event name field, enter the project number and click search. While viewing the Event Details, click on ¿View Event Package¿ to view bid forms.
It is recommended that all vendors register as a bidder through the Cal eProcure website at https://www.caleprocure.ca.gov/pages/bidder-vendor.aspx. This will allow for automatic notifications if there is any modification to the Event such as the posting of an addendum or additional documentation.
Drawings and Project Manual may also be viewed through Builders' Exchanges.
A public bid opening will be held on December 04, 2025 at 10:00 AM. at 707 Third Street, West Sacramento, CA 95605. Bidders that choose to attend the bid opening shall check in with security in the lobby. A DGS representative will meet attendees in the lobby and escort all parties to the bid opening location. At the public bid opening, all bids received before 2:00 P.M., December 03, 2025 will be opened and recorded onto a Preliminary Bid Tabulation. Bidders do not need to attend the bid opening as the Preliminary Bid Tabulation will be emailed to participating contractors immediately after the bid opening.
States estimated cost: $3,226,400.00. The term of this project is 608 calendar days. The States Project Director is Andrew Hotz at +1 (•••) •••-••••Sign up to see this detail.
More opportunities from California Department of General Services
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 750+ contractors already using CLEATUS
