This Solicitation opportunity from Pennsylvania was posted on June 2, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Cranberry Township in Butler County, Pennsylvania, is inviting sealed bids for the Northfield Road Storm Water Upgrades project, which involves installing approximately 130 linear feet of double 30-inch storm sewer, along with additional storm sewer segments, concrete inlets, headwalls, endwalls, asphalt, and lawn restoration, as detailed in the contract documents. Bidding documents are available free of charge through the PennBid platform, and bids must be submitted electronically via PennBid by 2:00 PM on June 23, 2025. Bids submitted directly to the Township will be deemed invalid. All proposals must include a certified check or bid bond of $1,000 payable to Cranberry Township, and bids will remain irrevocable for 60 days after opening. The project is estimated to cost over $25,000, and the Pennsylvania Prevailing Wage Act will apply. The Township reserves the right to reject any or all bids and to waive irregularities if deemed in the best interest of the Township. The project aims to improve stormwater management infrastructure and involves coordination with the Township’s bidding procedures and requirements.
HighAI Summary for 00 21 13.1 - Instructions for Electronic Bidding: This document provides detailed instructions for bidders on how to use the PennBid electronic bid management system to respond to a Request-for-Quotation. It outlines the process for registration, downloading documents, communicating with the project owner, and the specific steps for submitting and finalizing electronic bids. Additionally, it lists the mandatory submission documents, including the Bid Form, Bid Bond, Bidder's Acknowledgement, Qualification Statement, Non-Collusion Affidavit, Agreement of Surety Company, Certificate of Insurance, and Public Works Employment Verification Form.
PDF
PDF, High priority: read this first5 pages · amendment
HighAI Summary for 2025-178 Northfield Road Storm Sewer Upgrades - Addendum No. 1: Addendum No. 1 issued June 10, 2025, for the Northfield Road Storm Sewer project in Cranberry Township. This document modifies the contract documents by inserting a four-page 'General Requirements and Clarifications' section. Key updates include contractor conduct standards, topsoil management, permit compliance, soil conditions (coal/rock), restoration requirements for landscaping and fences, and a prohibition on the use of SDR-35 pipe.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for 2025-178 Northfield Road Storm Sewer Upgrades - Addendum No. 2: Issued June 18, 2025, this addendum modifies the contract documents for the Northfield Road Storm Sewer Upgrades (2025-178). It provides critical clarification that Mobilization, Traffic Control, and Soil and Erosion and Sedimentation Control are incidental to other bid items and shall be completed at no additional cost to the owner.
PDF
PDF, High priority: read this first1 page · itb
HighAI Summary for Conshohocken Borough - Weinmann Park Concrete Advertisement for Bids: Advertisement for sealed bids from Conshohocken Borough for the Weinmann Park Concrete project. The work involves installing concrete sidewalks and curb ramps, with an alternate bid for stamped integral colored concrete. Bids are due by 10:00 A.M. on May 9, 2025, via PennBid. The project must be completed by August 1, 2025, and is subject to Pennsylvania Prevailing Wage and Public Works Employment Verification acts.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Contract 0420-24-546: Northfield Road Storm Sewer Project Drawing Index: Drawing index and profile sheets for the Northfield Road Storm Sewer Project (Contract 0420-24-546) for Cranberry Township, PA, dated April 2025. The document includes a list of plan sheets (Cover, Plan, Profile, Miscellaneous Details, and Erosion and Sediment Control) and specific profile data for inlets and headwalls.
PDF
PDF, High priority: read this first76 pages · itb
HighAI Summary for Contract No. 2025-178 Northfield Road Storm Sewer Upgrades: Invitation to Bid (ITB) issued by Cranberry Township, PA, for the Northfield Road Storm Sewer Upgrades (Contract No. 2025-178). The project involves the installation of various sizes of HDPE storm sewers, concrete inlets, headwalls, and restoration work. Bids are due electronically via PennBid by 2:00 PM on June 23, 2025. The document includes the invitation, bid proposal form with a detailed unit price schedule, bid bond requirements, and a non-collusion affidavit.
PDF
PDF, High priority: read this first122 pages · specifications
HighAI Summary for Cranberry Township - Northfield Road Storm Sewer Upgrades Technical Specifications: Technical specifications prepared by The Eads Group, Inc. in June 2025 for the Northfield Road Storm Sewer Project in Cranberry Township, Butler County, Pennsylvania. The document outlines the scope of work, including the installation of approximately 130 LF of Double 30", 26 LF of 30", and 48 LF of 48" N-12 storm sewer, concrete inlets, headwalls, and restoration. It includes detailed divisions for general requirements, concrete, earthwork, exterior improvements, and utilities.
PDF
PDF, High priority: read this first11 pages · itb
HighAI Summary for Document 00 21 13 - Instructions to Bidders: This document provides the formal Instructions to Bidders for a construction project. It outlines the rules and procedures for bidding, including defined terms, bidder qualifications, site examination requirements, bid preparation, submission processes, and contract award criteria. It specifies that bidding documents are available via PennBid and details the bidder's responsibility to investigate site and subsurface conditions.
PDF
PDF, High priority: read this first1 page · bid-form
HighAI Summary for Document 00 41 00 - Bid Form: A placeholder document for the Bid Form (Document 00 41 00), directing bidders to the PennBid website to locate the actual form under the 'Bids' tab for the specific contract.
PDF
PDF, High priority: read this first16 pages · specifications
HighAI Summary for Document 00 73 00 - Supplementary Conditions: This document contains the Supplementary Conditions for a construction contract, amending and supplementing the EJCDC No. C-700 (2007 Edition) General Conditions. It defines key terms, establishes contract commencement times, outlines the schedule of values, and specifies the composition of contract documents. It also addresses subsurface conditions, insurance requirements, and references the Project Manual and Drawings.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Document 00 91 13 - Addenda: This document outlines the procedure for issuing addenda for bidding documents, specifying that they will be included in the documents or posted on the PennBid website.
PDF
PDF, High priority: read this first68 pages · specifications
HighAI Summary for EJCDC Standard General Conditions of the Construction Contract: Standard General Conditions of the Construction Contract prepared by the Engineers Joint Contract Documents Committee (EJCDC). This document establishes the legal and operational framework for construction contracts, covering definitions, bonds, insurance, contractor and owner responsibilities, change orders, payment terms, and dispute resolution.
PDF
PDF, High priority: read this first11 pages · wage-determination
HighAI Summary for Project 25-04171 Weinmann Park Concrete Prevailing Wage Determination: Prevailing minimum wage determination for the Weinmann Park Concrete project (Serial Number 25-04171) in Conshohocken Borough, Montgomery County. Issued by the Bureau of Labor Law Compliance with a determination date of 4/17/2025 and a contract award date of 5/21/2025. The document lists hourly rates and fringe benefits for various trade classifications including Asbestos & Insulation Workers, Carpenters, Cement Masons, and Electricians.
PDF
PDF, High priority: read this first2 pages · sow
HighAI Summary for Section 01 11 13 - Weinmann Park Summary of Work: This document is a Summary of Work for the Weinmann Park project in Conshohocken Borough. It details the scope of concrete work, including the installation of curbs and sidewalks, grading, and roadway restoration. It outlines contractor responsibilities regarding site use, utility protection (per Pennsylvania Act 287), and safety compliance, while specifying that the owner will handle future landscaping and lighting installation.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 22 00 - Measurement and Payment: This technical specification document outlines the measurement and payment criteria for unit price work, specifically covering plain cement concrete curb, plain cement concrete sidewalk, and stamped integral colored concrete. It defines the scope of compensation, measurement methods, and identifies items that are considered incidental to the work, such as mobilization and maintenance of traffic.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This technical specification section outlines the administrative requirements for contract management, including the submission of the schedule of values, monthly application for payment procedures, and formal change order processes (stipulated price, unit price, and time and material). It references EJCDC forms and defines the roles of the Engineer and Contractor in managing modifications to the contract price and time.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and the conduct of preconstruction and progress meetings. It outlines the responsibilities of the Contractor and Owner regarding survey control, meeting attendance, and agenda items for project management.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 01 32 16 - Narrative Construction Schedule: This document outlines the requirements for the preparation, maintenance, and revision of the construction project schedule. It specifies that the contractor must submit an initial schedule and workday calendar prior to construction, noting that progress payments may be withheld until the schedule is accepted. The Engineer's review period is set at 10 calendar days.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 33 00 - Submittals: This technical specification section outlines the requirements and procedures for project submittals, including construction progress schedules, product data, shop drawings, certificates, and manufacturer's reports. It defines the submission process, review timelines, and documentation standards required for the Engineer and Owner.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 40 00 - Quality Control: Technical specification section 01 40 00 detailing quality control requirements, including installation monitoring, tolerances, reference standards, testing laboratory services, observation services, and manufacturer field services. It outlines the contractor's responsibilities for quality assurance and substrate preparation.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section (01 42 13) providing a comprehensive schedule of acronyms and associated organizations or references used throughout the Project Manual, including standards from AASHTO, ANSI, ASTM, and PennDOT.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specification section 01 50 00 detailing requirements for construction facilities and temporary controls. It covers temporary utilities (electricity, sanitary), site barriers, fencing, water and dust control, security, progress cleaning, and the removal of temporary facilities upon project completion.
PDF
PDF, High priority: read this first3 pages · specifications
HighAI Summary for Section 01 55 26 - Traffic Regulation: Technical specifications detailing the Contractor's obligations for traffic regulation and control during construction. It covers the implementation of Traffic Control Plans, notification requirements for emergency services and residents, the use of flag persons, haul routes, and the installation and removal of traffic signs and signals.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specification section 01 60 00 detailing requirements for the procurement, transportation, handling, storage, and protection of materials and equipment. It outlines the rules for product options and the formal procedure for requesting substitutions.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Section 01 70 00 - Contract Closeout: This technical specification document outlines the requirements for contract closeout, including final cleaning, adjusting, project record documents, and the submission of final applications for payment. It details the necessary documentation for final acceptance, such as punchlists, payroll certifications, and lien waivers.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Section 07 92 00 - Sealants and Caulking: Technical specifications for Section 07 92 00, detailing the materials, installation, and quality assurance requirements for sealants and caulking. It specifies ASTM C920 compliance, approved manufacturers (Tremco, Sika), and detailed execution procedures for joint preparation and sealant application.
PDF
PDF, High priority: read this first4 pages · specifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, including temporary and permanent paving, asphalt overlay, shoulder and walkway restoration, and curb/gutter repairs. The document mandates compliance with PennDOT Publication 408 and specifies materials such as Superpave base and wearing courses, concrete requirements, and execution standards for trench backfilling and compaction.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Section 32 13 13 - Portland Cement Concrete Paving: Technical specifications for Portland Cement Concrete Paving, covering the construction of sidewalks, steps, curbs, driveway aprons, and pads. The document details quality assurance standards (ACI, ASTM, PennDOT Publication 408), material requirements for concrete mixes (minimum 3,500 psi), reinforcement, and execution procedures for forming and placement.
PDF
PDF, High priority: read this first5 pages · specifications
HighAI Summary for Section 32 13 16 - Stamped Colored Concrete Paving: Technical specifications for stamped colored concrete paving, including requirements for high Solar Reflective Index (SRI) colored admixtures, texture stamping, and curing. The document details material standards (ACI, ASTM), submittal requirements, manufacturer qualifications, and specific product bases such as Sika Corporation and Lithotec. It includes mix design constraints, installation procedures, and specific color/pattern selections like Moonstone and Rock Salt Texture.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Section 32 92 00 - Finish Grading and Seeding: Technical specifications for finish grading and seeding, including requirements for topsoil placement, soil conditioning, fertilizer and lime application, seed mixtures, and mulching materials. It outlines quality assurance standards (PennDOT Publication 408), submittal requirements, and detailed execution procedures for subgrade preparation and tillage.
PDF
PDF, High priority: read this first6 pages · contract-document
HighAI Summary for Weinmann Park Concrete Agreement: Agreement between the Borough of Conshohocken (Owner) and a Contractor for the installation of concrete sidewalks and curb ramps at Weinmann Park. The document specifies compliance with PennDOT standards, a completion deadline of August 1, 2025, liquidated damages of $500.00 per day for delays, and detailed payment procedures including retainage and interest terms.
PDF
PDF, High priority: read this first4 pages · past-performance
HighAI Summary for Weinmann Park Concrete - Bidder Qualification Statement: A mandatory Bidder Qualification Statement for the Weinmann Park Concrete project. The document requires bidders to provide organizational background, work history for similar projects completed in the last five years, financial statements, and a sworn affidavit to verify the bidder's qualifications and experience.
PDF
PDF, High priority: read this first4 pages · other
HighAI Summary for Weinmann Park Concrete - Bidder's Acknowledgement Form (00 45 10): A formal Bidder's Acknowledgement Form for the Weinmann Park Concrete project. The document requires bidders to certify they have reviewed all bidding documents and addenda, visited the site, and complied with all laws and regulations. It includes certifications against collusive or fraudulent practices and acknowledges the basis of the bid, time of completion, and required attachments such as the PennBid Bid Form and Bid Bond.
PDF
PDF, High priority: read this first7 pages · specifications
HighAI Summary for Weinmann Park Concrete Drawings - Borough of Conshohocken: Technical drawings and specifications for concrete work at Weinmann Park in Conshohocken Borough, Montgomery County, PA. The document includes general survey notes from August 2022, utility coordination requirements, roadway restoration details, and specific technical requirements for cement concrete sidewalks (3500 PSI, slope requirements, and plant-mixed concrete standards).
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Weinmann Park Concrete - List of Drawings: A list of drawings for the Weinmann Park Concrete project, specifying a total of 7 sheets.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Weinmann Park Concrete Project Manual - Conshohocken Borough: Project manual for the Weinmann Park Concrete project prepared by Gilmore & Associates, Inc. for Conshohocken Borough, dated April 2025 (G&A File No. 22-07019-01).
PDF
PDF, Low priority2 pages · bid-bond
LowAI Summary for 00 43 13 Bid Bond - Borough of Conshohocken: A standard Bid Bond form for the Borough of Conshohocken. The document outlines the legal obligations of the Bidder and Surety to pay a penal sum upon the Bidder's default in executing the contract and providing required performance and payment bonds.
PDF
PDF, Low priority1 page · other
LowAI Summary for 00 45 53 Agreement of Surety Company - Borough of Conshohocken: A legal template for an Agreement of Surety Company for the Borough of Conshohocken. The document outlines the surety's commitment to provide Performance and Payment Bonds (100% of contract amount) for Weinmann Park Concrete upon contract award.
PDF
PDF, Low priority2 pages · other
LowAI Summary for 00 61 19 - Maintenance Bond (Weinmann Park Concrete): A template for a Maintenance Bond for the Weinmann Park Concrete project. The document outlines the obligations of the Principal and Surety to indemnify the Obligee against defects in materials or workmanship for 18 months after final completion, with a bond value of 15% of the completed contract price.
PDF
PDF, Low priority1 page · contract-document
LowAI Summary for 00 65 19.13 - Contractor's Affidavit (Weinmann Park Concrete): A legal affidavit template for the Weinmann Park Concrete project between Conshohocken Borough and a contractor. The document serves as a sworn statement that all labor, materials, and outstanding claims related to the agreement have been paid in full.
PDF
PDF, Low priority1 page · other
LowAI Summary for 00 65 19.19 - Consent of Surety to Final Payment (Weinmann Park Concrete): A legal template for the 'Consent of Surety to Final Payment' regarding the Weinmann Park Concrete project. The document serves as a formal agreement where the surety company approves final payment to the contractor, confirming that labor and material claims have been settled while maintaining the surety's obligations to the Owner, Conshohocken Borough.
PDF
PDF, Low priority1 page · bid-tabulation
LowAI Summary for 44-Weinmann Park Concrete Bid Tabulation: A bid tabulation document for the Weinmann Park Concrete project, comparing unit prices and total costs from multiple contractors, including Donato Spaventa & Sons, Delaware Environmental Construction Services, Joseph J Danielle LLC, NJS Concrete, Ply-Mar Construction, Premier Concrete, T. Schiefer Contractors, and The Ambient Group. Items bid include concrete curbs, sidewalks, and stamped integral colored concrete.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Appendix B - Public Works Employment Verification Form: A Commonwealth of Pennsylvania Public Works Employment Verification Form requiring contractors and subcontractors to affirm compliance with the Public Works Employment Verification Act through the use of the federal E-Verify Program.
PDF
PDF, Low priority1 page · other
LowAI Summary for Conshohocken Borough Weinmann Park Concrete - Table of Contents: Table of Contents for the Conshohocken Borough Weinmann Park Concrete project. It outlines the structure of the procurement and contracting requirements (Division 00), general requirements (Division 01), thermal and moisture protection (Division 07), and exterior improvements (Division 32), including specific sections for bidding instructions, bonds, and concrete paving.
PDF
PDF, Low priority1 page · bid-opening
LowAI Summary for Contract 2025-178: Northfield Road Storm Sewer Upgrades Bid Opening Results: Bid opening results for Contract No. 2025-178 regarding Northfield Road Storm Sewer Upgrades, listing base bids from 11 vendors, with Fryer Excavating as the lowest bidder at $136,266.92.
PDF
PDF, Low priority2 pages · other
LowAI Summary for Document 00 45 19 - Non-Collusion Affidavit: A legal affidavit for the Borough of Conshohocken, Pennsylvania, requiring the bidder to swear that they have not engaged in collusion or restraint of free, competitive bidding for the project.
PDF
PDF, Low priority3 pages · performance-bond
LowAI Summary for Document 00 61 13.13 - Performance Bond: A standard Performance Bond template for Conshohocken Borough. The document outlines the legal obligations of the Surety and Contractor to ensure the completion of the contract, including terms for declaring contractor default, payment procedures, and legal jurisdiction in Montgomery County or the Eastern District of Pennsylvania.
PDF
PDF, Low priority3 pages · contract-document
LowAI Summary for Document 00 61 13.16 - Payment Bond: A standard Payment Bond template for projects involving the Conshohocken Borough. The document outlines the legal obligations of the Contractor and Surety to ensure payment for labor, materials, and equipment furnished by claimants during the performance of the contract.
PDF
PDF, Low priority2 pages · contract-document
LowAI Summary for Document 00 65 19.16 - Contractor's Release of Liens: A legal release form for the Weinmann Park Concrete project, where the contractor acknowledges receipt of payment from Conshohocken Borough and releases the owner from all claims and demands arising from the agreement.
PDF
PDF, Low priority1 page · specifications
LowAI Summary for Weinmann Park Concrete - Certificate of Insurance (00 62 16): Document 00 62 16 outlines the insurance requirements for the Weinmann Park Concrete project. It identifies the Borough of Conshohocken and Gilmore & Associates, Inc. as additional insureds and refers to Document 00 73 00, Section 1.10 for specific coverage and limit requirements.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyPennsylvania → Cranberry Township, Butler County, PA
Notice is hereby given that the Cranberry Township Board of Supervisors, Butler County, 2525 Rochester Road, Suite 400, Cranberry Township, PA 16066-6499, will accept sealed bids for the following contracts: Contract No. 2025-178 - Northfield Road Storm Water Upgrades. Provide all labor, materials, equipment and supervision necessary to install approximately 130 LF of Double 30”, 26 LF of 30”, 26 LF of 12” and 48 LF of 48” N-12 storm sewer, concrete inlets, storm sewer headwall and endwall, asphalt and lawn restoration and all associated appurtenances as more clearly specified in the contract documents. Bidding documents are available at no cost on PennBid (www.pennbid.net). Proposals shall be submitted upon forms provided by the Township. Bids will be received electronically via the PennBid Program until 2:00 PM on Monday, June 23, 2025, at which time the bids will be opened, with the results made available on PennBid. Bids submitted directly to Cranberry Township will be invalid and considered non-responsive. Questions regarding this bid shall be submitted via the “Messages” feature within PennBid. All bids must be accompanied by a certified check or bid bond in the amount of One-Thousand Dollars ($1,000) payable to Cranberry Township. All bids shall remain irrevocable for 60 days after the actual date of the opening. The estimated cost of this Project is greater than Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. The Board of Supervisors reserves the right to reject any or all bids and to waive any defects or irregularities in the best interest of the Township. Daniel D. Santoro, Township Manager/Secretary
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award