Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

STINGER, ARM

Closed
SPE7M2-26-Q-0776Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336413
New
DIBBS
ROLLER, ADAPTER
Solicitation # SPE4A5-27-T-0059
Solicitation SPE4A5-27-T-0059 is a total small business set-aside issued by the DLA Weapons Support ASC Supplier Oper OEM Division for the procurement of 49 adapter rollers, identified by NSN 4920007823806. This critical application item, specifically part number VAL3900 from Val Rollers Incorporated, is required for delivery to the DLA Distribution DDSP New Cumberland Facility in Pennsylvania. The delivery lead time is 158 days after order, with an original required delivery date of February 8, 2027, and a need ship date of March 17, 2027. Shipping is designated as FOB Origin, with inspection and acceptance occurring at the destination. The contract mandates strict adherence to the DLA Master List of Technical and Quality Requirements, with packaging following ASTM D3951 and MIL-STD-129, and palletization per RP001. Quality assurance will be conducted using sampling methods according to MIL-STD-1916 or ASQ H1331, requiring zero non-conformances for acceptance under MIL-STD-105/ASQ Z1.4. Offerors must submit quotes via the DIBBS system and comply with various federal regulations, including the Buy American Act, the Berry Amendment, and DFARS cybersecurity standards. Notably, the use of additive manufacturing for these parts is prohibited unless specifically authorized. Invoicing and payment must be processed electronically through the Wide Area WorkFlow system.
DLA WEAPONS SUPPORT ASC SUPPLIER OPER OEM DIVISION

POSTED

2 days ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract is for the procurement of seven Stinger Forward Armature Vanes, identified as critical Aircraft Launch and Recovery Equipment (ALRE) items. Due to the critical nature of the application, this is a restricted source procurement requiring engineering source approval from the Naval Air Warfare Center (NAWC) Aircraft Division Lakehurst. Eligible offerors must be approved sources or provide products from an approved source, supported by a source approval letter or equivalent evidence. The delivery timeline is set for 600 days after receipt of order. The procurement is subject to stringent quality and technical requirements, including SAE AS9100 standards, Non-Destructive Testing accreditation, and adherence to MIL-STD-129 for marking. Required deliverables include a First Article Testing Report, Production Test and Inspection Report, and a Certificate of Quality Compliance. The contract strictly prohibits the use of class I ozone-depleting chemicals and the intentional addition of mercury. Additionally, the technical data is subject to ITAR and EAR export controls, requiring contractors to have approved US/Canada Joint Certification Program certification and specific DLA authorization to access the data.

General Info

Procurement of seven Stinger Forward Armature Vanes with NAWC approval and 600-day delivery.

NAICS

336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing

Place of Performance

2083 NORMANDY DRIVE DOOR 113 TO 134, NEW CUMBERLAND, PA, 17070-5002, USA

Set-Aside

NONE

Documents

1

SPE7M2-26-Q-0776 Request for Quotations

PDF, High priority: read this first28 pages · rfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → NUCLEAR REACTOR PROGRAM
Contacts1 person available
OfficeUSA

Full Description

Show more
STINGER, FORWARD ARMATURE VANE
82N CSI ALRE
RC001: DOCUMENTATION REQUIREMENTS FOR SOURCE APPROVAL REQUEST (SAR)
RP001: DLA PACKAGING REQUIREMENTS FOR PROCUREMENT
Certificate of Quality Compliance (CoQC) Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information. If CDRL-COQCCDRLs is missing from DLA Technical Data Management Transformation (TDMT) they can also be viewed in the DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB AT: http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
RA001: THIS DOCUMENT INCORPORATES TECHNICAL AND/OR QUALITY REQUIREMENTS
(IDENTIFIED BY AN 'R' OR AN 'I' NUMBER) SET FORTH IN FULL TEXT IN THE
DLA MASTER LIST OF TECHNICAL AND QUALITY REQUIREMENTS FOUND ON THE WEB
AT:
http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx http://www.dla.mil/HQ/Acquisition/Offers/eProcurement.aspx
FOR SIMPLIFIED ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE SOLICITATION ISSUE DATE OR THE AWARD DATE CONTROLS. FOR LARGE ACQUISITIONS, THE REVISION OF THE MASTER IN EFFECT ON THE RFP ISSUE DATE APPLIES UNLESS A SOLICITATION AMENDMENT INCORPORATES A FOLLOW-ON REVISION, IN WHICH CASE THE AMENDMENT DATE CONTROLS.
The following Contract Data Requirements Lists (CDRLs), DD Form 1423s, apply to this procurement. Review the Technical Data Package (TDP) for additional information. -First Article Testing Report -Production Test and Inspection Report -Certificate of Quality Compliance RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
NOTE: THIS IS A RESTRICTED SOURCE ITEM AND
REQUIRES ENGINEERING SOURCE APPROVAL BY THE
GOVERNMENT DESIGN CONTROL ACTIVITY.
AIRCRAFT LAUNCH AND RECOVERY EQUIPMENT (ALRE) CRITICAL APPLICATION ITEM
SOURCE APPROVAL TO BE ELIGIBLE FOR AWARD UNDER THIS SOLICITATION, AN
OFFEROR MUST BE AN APPROVED SOURCE OR PROVIDE THE PRODUCT OF AN APPROVED
SOURCE AS DETERMINED BY THE ENGINEERING SUPPORT ACTIVITY, NAVAL AIR
WARFARE CENTER (NAWC) AIRCRAFT DIVISION LAKEHURST. THE CRITERIA AND
PROCEDURES FOR SOURCE APPROVAL ARE CONTAINED IN PART I OF THE NAVAL
INVENTORY CONTROL POINT (NAVICP) PHILADELPHIA BROCHURE ENTITLED "SOURCE
APPROVAL INFORMATION BROCHURE FOR SPARES". THE LATEST VERSION OF THIS
BROCHURE MAY BE OBTAINED BY ACCESSING NAVICP'S WEBSITE:
HTTPS://WWW.NAVSUP.NAVY.MIL, OUR TEAM, NAVICP, BUSINESS OPPORTUNITIES,
COMMODITIES, SOURCE APPROVAL REQUEST (SAR) BROCHURE SPARES
TO ASSIST IN THE DETERMINATION OF SOURCE APPROVAL, THE OFFEROR MAY BE
REQUIRED TO SUBMIT TO A SURVEY PRIOR TO AWARD IN WHICH NAWC LAKEHURST
MAY PARTICIPATE.
IN ADDITION, THE OFFEROR MUST PROVIDE THE FOLLOWING INFORMATION, WHICH
MAY BE CONSIDERED IN DETERMINING WHETHER THE OFFEROR IS AN APPROVED
SOURCE:
(1) A SOURCE APPROVAL LETTER FROM NAVICP'S ENGINEERING AND PRODUCT
SUPPORT DIRECTORATE; OR;
(2) OTHER EVIDENCE INDICATING THAT THE OFFEROR MEETS THE SOURCE APPROVAL
CRITERIA.
ALL REQUESTS FOR WAIVERS OR DEVIATIONS CLASSIFIED AS CRITICAL, MAJOR, OR
MINOR MUST BE FORWARDED TO THE DSC CONTRACTING OFFICER FOR REVIEW AND
APPROVAL.
SPE7M2-26-Q-0776
SECTION B
SUPPLY/SERVICE: 1680-01-666-9391 CONT'D
ALL ITEMS OF SUPPLY SHALL BE MARKED IAW MIL-STD-129. IN ADDITION, EACH
UNIT PACK WILL BE MARKED WITH LOT AND SERIAL NUMBER (IF AVAILABLE),
CONTRACTOR'S CAGE CODE, ACTUAL MANUFACTURER'S CAGE CODE AND PART NUMBER.
(February 2016)
RD002, COVERED DEFENSE INFORMATION APPLIES
RQ040: Non-Destructive Testing (NDT) Accreditation Requirements
RQ039: Non-Tailored Higher-Level Quality Requirements (SAE AS9100) for Manufacturers and Non-Manufacturers
CLASS I OZONE DEPLETING CHEMICALS ARE NOT TO BE USED NOR INCORPORATED IN ANY ITEMS TO BE DELIVERED UNDER THIS CONTRACT.THIS PROHIBITION SUPERSEDES ALL SPECIFICATION REQUIREMENTS BUT DOES NOT ALLEVIATE ANY PRODUCT REQUIREMENTS. SUBSTITUTE CHEMICALS MUST BE SUBMITTED FOR APPROVAL UNLESS THEY ARE AUTHORIZED BY THE SPECIFICATION REQUIREMENTS. RQ002: CONFIGURATION CHANGE MANAGEMENT ENGINEERING CHANGE PROPOSAL REQUEST FOR VARIANCE (DEVIATION OR WAIVER)
MERCURY OR MERCURY CONTAINING COMPOUNDS SHALL
NOT BE INTENTIONALLY ADDED TO<(>,<)> OR COME IN DIRECT
CONTACT WITH<(>,<)> ANY HARDWARE OR SUPPLIES FURNISHED
UNDER THIS CONTRACT. EXCEPTION: FUNCTIONAL MERCURY
USED IN BATTERIES, FLUORESCENT LIGHTS, REQUIRED
INSTRUMENTS; SENSORS OR CONTROLS; WEAPON SYSTEMS;
AND CHEMICAL ANALYSIS REAGENTS SPECIFIED BY NAVSEA.
PORTABLE FLUORESCENT LAMPS AND PORTABLE INSTRUMENTS
CONTAINING MERCURY SHALL BE SHOCK PROOF AND CONTAIN
A SECOND BOUNDARY OF CONTAINMENT OF THE MERCURY OR
MERCURY COMPOUND. (IAW NAVSEA 5100-003D).
THIS MATERIAL MUST MEET NAVAIR AIRCRAFT LAUNCH &
RECOVERY EQUIPMENT TRACEABILITY REQUIREMENTS. BARE
ITEM MARKINGS SHALL BE IAW THE TECHNICAL DATA
DRAWINGS PROVIDED.
BARE ITEM MATERIAL SHALL BE MARKED WITH CONTRACT
NUMBER, NAWC CAGE, AND PART NUMBER UNLESS OTHERWISE
SPECIFICIED ON ASSOCIATED DRAWING. IF A CONFLICT
EXISTS WITH MARKING REQUIREMENTS OF THIS 82N ALRE/SE
ITEM, THE ASSOCIATED DRAWING REQUIREMENTS SHALL APPLY.
The Government Procuring Activity has determined that Surplus is not Acceptable for this NSN. (End of TQ Requirement)
RQ032: EXPORT CONTROL OF TECHNICAL DATA
This item has technical data some or all of which is subject to export-control of either the International Traffic in Arms regulations (ITAR) or the Export Administration Regulations (EAR), and cannot be exported without prior authorization from either the Department of State or the Department of Commerce. Export includes disclosure of technical data to foreign persons and nationals whether located in the United States or abroad. This requirement applies equally to foreign national employees and U.S. companies and their foreign subsidiaries. DFARS 252.225-7048 is applicable to this data.
The Defense Logistics Agency (DLA) limits distribution of export-control technical data to DLA contractors that have an approved US/Canada Joint Certification Program (JCP) certification, have completed the Introduction to Proper Handling of DOD Export-Controlled Technical Data Training and the DLA Export-Controlled Technical Data Questionnaire (both are available at the web address given below), and have been approved by the DLA controlling authority to access the export-controlled data. NSN/Part Number: 1680-01-666-9391 Quantity: 7 EA Purchase Request: 7017868114QTY: 7 Delivery: 600 days ADO

More opportunities from Department Of Defense → NUCLEAR REACTOR PROGRAM

Same awarding agency

NAICS: 331318
New
DIBBS
CABLE, POWER, ELECTRICAL
Solicitation # SPE7M2-26-T-7073
Solicitation SPE7M2-26-T-7073 is a fixed-price request for quotations issued by the DLA Land and Maritime Nuclear Reactor Program for 500 feet of electrical power cable (NSN 6145-01-229-0031). The material must be delivered in 500 feet per reel with minimum lengths of 150 feet. Specific length requirements are dictated by the Advice code: codes 2N, 28, or 34 require continuous length with no multiple unit packs, while codes 2P or 39 require continuous length but allow multiple unit packs. The item must comply with MIL-DTL-24640/23E and MIL-DTL-24640C specifications and is subject to Qualified Products List (QPL) or Qualified Manufacturers List (QML) requirements. The contract mandates strict adherence to quality and safety standards, including the prohibition of Class I ozone-depleting chemicals and the restriction of mercury compounds. Bare items must be marked with the contract number, NAWC CAGE, and part number, while overall packaging and preservation must follow MIL-DTL-12000 and MIL-STD-2073-1E. Delivery is required within 151 days, with a need ship date of March 9, 2027, and an original required delivery date of September 18, 2027, shipped FOB Origin to the DLA Distribution New Cumberland facility. Inspection and acceptance will occur at the destination. Contractors must maintain supply chain traceability documentation and utilize the Wide Area WorkFlow (WAWF) system for invoicing.
Other Aluminum Rolling, Drawing, and Extruding

POSTED

3 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS