This Solicitation opportunity from Oregon was posted on June 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for Attachment B - Eastern OYA Control Room Upgrade ARCH REV1: Architectural specifications and drawings for the Eastern OYA Control Room Upgrade, identified as Revision 1. The document provides technical details necessary for the facility upgrade project.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for D3482000 - Oregon Youth Authority Eastern Oregon Facility Control Room Upgrade: Construction documents and technical specifications for the Control Room Upgrade at the Eastern Oregon Youth Correctional Facility (Project No. D3482000). The document includes a comprehensive sheet list covering architecture, electrical, mechanical, and security disciplines, along with material legends, architectural abbreviations, and general construction notes issued for construction in December 2023.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for D3482000 - Oregon Youth Authority Oak Creek Facility Control Room Upgrade: Construction documents and technical drawings for the Oregon Youth Authority Oak Creek Facility Control Room Upgrade, dated December 2023. The file includes a cover sheet, a comprehensive sheet list covering architectural, electrical, mechanical, and security disciplines, material legends, and general construction notes. It is marked 'Issue for Construction' and was produced by Jacobs Engineering Group Inc.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for D3482000 - Rogue Valley OYA Control Room Upgrade Drawings: Construction documents and architectural drawings for the Oregon Youth Authority (OYA) Rogue Valley Facility Control Room Upgrade, dated December 12, 2023. The file includes a cover sheet, sheet list, material and building system legends, and general construction notes regarding demolition, patching, and firestopping.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Oak Creek Control Room Upgrade - Finish Plan: Architectural finish plan and schedules for the Oak Creek Facility control room upgrade at 4400 Lochner Rd SE, Albany, OR. The document includes a finish symbol legend, detailed material specifications (Armstrong ceilings, Tarkett/Tate flooring, Sherwin Williams paint), a room finish schedule for the control room and restroom, and door and window schedules.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for OYA Regional Facilities Control Room Upgrades Specifications Rev 2: Technical specifications for the construction of Control Room Upgrades for the Oregon Youth Authority at Eastern Oregon (Burns), Oak Creek (Albany), and Rogue Valley (Grants Pass) facilities. This document is Revision 2, issued for construction on May 20, 2024, by Jacobs Engineering Group Inc. It includes a detailed table of contents covering multiple divisions (00, 01, 02, 05, 07, 08, 09, 12, 22, 26, 28) and a summary section detailing project administration, permits, owner occupancy, and site access requirements.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Roque Valley OYA Control Room Upgrade - ARCH REV1: Architectural specifications and drawings (Revision 1) for the Roque Valley OYA Control Room Upgrade project. The document provides technical details and design requirements for the facility upgrade.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S-DASOBO-00009651 Addendum #1 - OYA Regional Control Room Upgrades: Solicitation Addendum #1 for ITB S-DASOBO-00009651 regarding OYA Regional Control Room Upgrades. This document modifies Section A and Exhibit 7 of the original ITB to include additional revised drawings for the Eastern Oregon, Oak Creek, and Rogue Valley facilities dated December 2023 and revised April 4, 2024.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for S-DASOBO-00009651 Addendum #2 - OYA Regional Control Room Upgrades: Solicitation Addendum #2 for ITB S-DASOBO-00009651 regarding OYA Regional Control Room Upgrades. The primary purpose of this amendment is to extend the Bid Opening Date and Bid Submittal deadline from July 16, 2024, to July 30, 2024, at 2:00 PM (Pacific).
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for S-DASOBO-00009651 OYA Control Room Renovations Q&A: Questions and Answers document dated 06/25/2024 for the OYA Regional Control Room Renovations (S-DASOBO-00009651). It provides clarifications regarding window blind specifications, OFCI monitor mounts, and the reuse of raised access floor panels and pedestals.
PDF
PDF, High priority: read this firstitb
HighAI Summary for S-DASOBO-00009651 Regional Control Room Upgrades: Invitation to Bid (ITB) issued by the State of Oregon for the renovation of control rooms at three Oregon Youth Authority facilities: Eastern Oregon, Oak Creek, and Rogue Valley Youth Correctional Facilities. The project includes demolition, architectural remodeling, plumbing, lighting, and electronic door installations. Estimated project cost is between $800,000 and $1,200,000, with a bid opening date of July 16, 2024.
PDF
PDF, Low priorityspecial-notice
LowAI Summary for S-DASOBO-00009651 Pre-Bid Conference Attendance List: Attendance list for the mandatory pre-bid conference held on July 13, 2024, for ITB No. S-DASOBO-00009651, Oregon Youth Authority Regional Control Room Upgrades. The document lists participating companies and representatives, including Ordel Construction, OEG, IES Communication, Cedar Mill Construction, and Jacobs.
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
1 update
PhaseClosed
Posted
Solicitation
Deadline changed
Response deadline changed from Aug 15, 2024 to Jul 16, 2024.
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
The purpose of this ITB is to establish a Contract to update control rooms at the following facilities: 1) Eastern Oregon Youth Correctional Facility located at 1800 W Monroe Street, Burns, Oregon 97720, 2) Oak Creek Youth Correctional Facility located at 4400 Lochner Road SE, Albany, Oregon 97322, and 3) Rogue Valley Youth Correctional Facility located at 2001 NE F Street, Grants Pass, Oregon 97526.