Cooks Reservoir Management System (RMS) C-9550B

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Santa Margarita Water District is advancing improvements to the Cooks Reservoir Management System located at 25702 Calle Ricardo in San Juan Capistrano, California, with a project classified under CEQA Class 1 for Existing Facilities, exempting it from full environmental review. The work includes the installation of a new RMS mixer to enhance water circulation, a chlorine dosing system complete with electrical power and control infrastructure, and a dedicated chemical storage facility supported by a retaining wall system to ensure safe handling of treatment chemicals. The project was formally noticed on January 20, 2026, though the associated environmental documentation was filed and approved on April 22, 2024, with a Notice of Exemption and Certificate of Determination submitted to the Orange County Clerk-Recorder. There is no disclosed contract value, pricing structure, or detailed scope of work beyond the described construction elements, and no standard federal acquisition regulations or contract clauses are referenced, as the documentation stems entirely from state-level environmental compliance procedures rather than a formal federal procurement. The place of performance is strictly limited to the identified site in San Juan Capistrano, with no provisions for deliveries, shipping terms, or alternate performance locations specified. There is no publicly available contract type, period of performance, invoicing mechanism, or payment office details, and no designation of a Contracting Officer’s Representative, Technical Representative, or Procurement Contracting Officer has been made public. While Tricia Butler, Chief Engineer, serves as the primary point of contact with a listed phone number and email, her official role in contract administration remains unspecified. No formal solicitation number is assigned beyond a reference to 24-85000351, and no subcontracting, socioeconomic set-asides, size certifications, or unique entity identifiers are included. All submissions must be delivered as hard-copy documents in accordance with CEQA filing protocols, with no electronic options permitted, and there are no evaluation factors, award criteria, or competition parameters outlined. The project proceeds under an administrative exemption and lacks the formal procurement structure associated with federal contracts.

General Info

Santa Margarita Water District installs RMS mixer, chlorine system, and chemical storage at Cooks Reservoir under CEQA Class 1 exemption.

Agency

California → Santa Margarita Water District

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Calle Ricardo and Avenida Evita, San Juan Capistrano, CA, 92675

Set-Aside

NONE

Documents

(1)

NOE 24-85000351 Cooks Reservoir Management System (RMS) C-9550B

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Santa Margarita Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Santa Margarita Water District
Office AddressN/A
Contacts
Tricia ButlerChief Engineer

Full Description

Show more
Construct reservoir improvements that include new RMS mixer, and chlorine dosing System that include electrical power and controls, and a new chemical storage facility with a retaining wall system.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details