Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Phase II Desert View Conservation Area Recreational Trails Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

San Bernardino County Department of Public Works, Special Districts, is advancing the Phase II Desert View Conservation Area Recreational Trails Project to enhance the Desert View Conservation Area as a conservation and recreational destination. The project involves constructing trail directional signage, mileage posts, informational kiosks, habitat shelters with seating, viewing platforms, interpretive panels, and picnic tables across the conservation area located near Joshua Tree, California, within Assessor’s Parcel Nos. 0589-311-25 and 0589-321-73. Installation of trail kiosks is scheduled between April 1 and April 9, 2026, with all work taking place on-site under strict environmental compliance protocols. The lead point of contact for the project is John Hernandez, Project Manager, who also serves as the Contracting Officer’s Representative, supported by environmental consultant Stephanie Tang of Aspen Environmental Group. The project adheres to the California Environmental Quality Act (CEQA), incorporating mitigation measures for protected species including desert tortoise, burrowing owl, and Western Joshua Tree, and requires pre-construction biological surveys, daily sweeps by a Qualified Biologist, and Worker Environmental Awareness Program training for all personnel. Compliance is also governed by the California Endangered Species Act, the Western Joshua Tree Conservation Act, and oversight from the California Department of Fish and Wildlife and the Mojave Desert Air Quality Management District. Acceptance of all constructed components occurs at the project site, with inspections conducted during construction to ensure adherence to environmental standards and regulatory permits. While the contract is classified as a forecast with no specified value, pricing details, contract type, or formal FAR clauses included, the procurement remains focused on environmental stewardship, site-specific execution, and regulatory compliance rather than traditional acquisition structures. Submission of public comments is accepted through email or mail until February 16, 2026, and all environmental documentation must be submitted to the State Clearinghouse in both electronic and hardcopy formats.

General Info

Construct trails, signage, and facilities in Desert View Conservation Area with strict environmental compliance and species protections.

Agency

California → San Bernardino County

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Onaga Trail, Larkspur Ave, Quail Springs Rd, CA, 92252

Set-Aside

NONE

Documents

(5)

Phase II Desert View Conservation Area Recreational Trails Project Notice of Completion

PDFnotice-of-completion

Phase II Desert View Conservation Area Recreational Trails Project IS/MND January 2026

PDFinitial-study-mitigated-negative-declaration

NOI - Phase II Desert View Conservation Area Recreational Trails Project

PDFnotice-of-intent

Phase II Desert View Conservation Area Recreational Trails Project Summary

PDFenvironmental-summary

2026010533_CDFW Comment on Desert View Conservation Area MND

PDFcomment-letter

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → San Bernardino County
Contacts2 people available
OfficeN/A
Organization / Agency
California → San Bernardino County
Office AddressN/A
Contacts
John HernandezProject Manager
Stephanie TangEnvironmental Scientist

Interested Companies (1)

Show more
Aspen Environmental Group
Agoura Hills, CA

Full Description

Show more
The San Bernardino County Department of Public Works, Special Districts proposes to construct improvements that include trail directional signage, mileage posts, informational kiosks, habitat shelters with seating areas, viewing platforms, discovery interpretive panels, and picnic tables, throughout the Desert View Conservation Area (DVCA). The proposed Project components would improve the DVCA as a conservation and regional recreational area.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
AIRFIELD 2029 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure improvements at the Port of Seattle, focusing on modernization and safety enhancements across multiple systems. Key components include replacing airfield lighting circuits with low megger readings with new LED fixtures and signs to improve reliability and energy efficiency, replacing deteriorating pavement and critical utilities to maintain operational integrity, and implementing comprehensive wildlife hazard management measures such as removing turf edge dams, installing anti-perching devices on signs, and regrading areas with new storm drainage to eliminate ponding and reduce bird attractants. Additionally, failing flush fire hydrant access hatches will be replaced to ensure rapid and unobstructed access for emergency response. The project is part of the AIRFIELD 2029 ALL PROJECTS initiative, classified under NAICS code 237990 for other heavy and civil engineering construction, and is managed by the Aviation Project Management Group under the Port of Seattle. Solicitations are open with a posted date of July 31, 2026, and inquiries should be directed to Yanet Maldonado, the primary point of contact. The work is critical to maintaining airfield safety, regulatory compliance, and long-term operational readiness, with all efforts centered on upgrading aging infrastructure to meet current aviation standards.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
AIRFIELD 2030 ALL PROJECTS (AIP / AUI / CIRCUITS / FOD) CombinedThe contract encompasses a broad range of airfield infrastructure upgrades at the Port of Seattle, focusing on enhancing safety, efficiency, and compliance. Key components include replacing aging airfield lighting circuits with low megger readings with modern LED fixtures and signs to improve visibility and reduce maintenance costs. Concurrently, failing pavement sections and critical utilities will be removed and replaced to ensure structural integrity and operational reliability. Wildlife hazard mitigation measures involve removing turf edge dams along runways, taxiways, and access roads, installing anti-perching devices on signs to deter birds, and addressing ponding issues through regrading and new storm drainage infrastructure. Additionally, deteriorating flush fire hydrant access hatches will be replaced to ensure rapid access for emergency response teams. The project is categorized under NAICS code 237990 and falls under the Aviation Project Management Group, with the Port of Seattle as the overseeing agency. The solicitation is posted as a forecast with no set-aside classification, indicating it is open to all eligible contractors. Primary point of contact for inquiries is Yanet Maldonado, reachable via email or phone, and additional details can be accessed through the provided portal link. The project is anticipated to begin after the posted date in July 2026, with all work taking place at the airport facility.
Aviation Project Management Group

POSTED

about 10 hours ago

DEADLINE

N/A
View Details
NAICS: 237990
New
SLED
Ground Grid Substations Surface Restoration and Vegetation Abatement
Solicitation # CS 07-26-04
The contract pertains to the restoration of surface conditions and vegetation abatement at substation sites in California, addressing significant issues including dense weed and woody vegetation growth within fenced areas, reduced crushed-rock depth below minimum effective levels, and the accumulation of organic material that compromises surface resistivity. The work encompasses removing invasive vegetation, reestablishing proper crushed-rock coverage to meet safety and operational standards, and eliminating organic buildup to ensure proper electrical grounding performance and site integrity. All tasks must be executed in compliance with utility safety and environmental protocols to safeguard personnel and infrastructure. The solicitation, identified as CS 07-26-04, was posted on July 31, 2026, with responses due by September 2, 2026, and is managed by the Engineering and Operations division of Alameda County, California. Work performance will occur at various substations within the state, with primary point of contact being Bill Staton, Electrical Equipment Superintendent, reachable at 510-748-3958 or staton@alamedamp.com, and secondary contact Jeffrey Braun, Support Services Manager, at 510-748-3971 or braun@alamedamp.com. The project is administered under a state and local government entity with no set-aside designation specified, and details can be accessed via the provided online portal.
Engineering and Operations

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details