Aliso Creek Estuary Restoration Plan

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Laguna Beach

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Country Club Drive and South Coast Highway, Laguna Beach, CA, 92651

Set-Aside

NONE

Documents

(5)

2026010462 NAHC Comment on Aliso Creek Estuary Restoration Plan Project

PDFcomment

Caltrans Comments on Aliso Creek Estuary Plan NOP 2026010462

PDFcomments

Aliso Creek Estuary Restoration Plan Notice of Preparation 011526

PDFnotice-of-preparation

CDFW Comment on Aliso Creek Estuary Restoration Plan Project NOP

PDFcomment-letter

Aliso Creek Estuary Restoration Plan Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Laguna Beach
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Laguna Beach
Office AddressN/A
Contacts

Interested Companies (1)

Show more
WSP USA
San Diego, CA

Full Description

Show more
The proposed Project would restore the Aliso Creek Estuary by removing artificial fill, widening the channelized watercourse, creating new functional wetland habitats, improving water quality, and returning the estuary to its natural “intermittently open” condition. These proposed restoration activities would include the demolition of the existing beach overflow parking lot, construction of a new multi-modal facilities, installation of landscaping, and reconstruction of the play area and tot lot. The proposed Project would restore the Aliso Creek Estuary from its current condition to a healthy, functional ecosystem. In its existing state the estuary is a degraded lagoon, which stores urban runoff and provides no significant value as a natural habitat for native plants, fish, or wildlife. The proposed Project would restore a portion of the wetland habitat that historically occupied the Project site, by removing the existing surface parking lot and associated artificial fill, widening the channelized watercourse, and restoring the estuary’s natural connection to the ocean. The Restoration Site Plan proposes new, upgraded park facilities designed to provide public opportunities to experience the restored ecosystem in a wilderness park setting. These features include an interpretive loop trail around the restored estuary with seating and viewing areas, a pedestrian bridge over the restored wetland habitat, and an overlook area suitable for guided educational visits (see Figure 3). The Public Access Plan emphasizes enhanced access to the site via multiple modes of transportation through a multi-modal mobility hub, consistent with citywide visitor mobility strategies (see Figure 3).

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 14 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

1 day ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS