Aliso Creek Estuary Restoration Plan
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → City of Laguna Beach
NAICS
237990 - Other Heavy and Civil Engineering ConstructionView NAICS
Place of Performance
Country Club Drive and South Coast Highway, Laguna Beach, CA, 92651Set-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → City of Laguna Beach
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Laguna Beach
Office AddressN/A
Contacts
Interested Companies (1)
Show more
WSP USA
San Diego, CA
Full Description
Show more
The proposed Project would restore the Aliso Creek Estuary by removing artificial fill, widening the channelized watercourse, creating new functional wetland habitats, improving water quality, and returning the estuary to its natural intermittently open condition. These proposed restoration activities would include the demolition of the existing beach overflow parking lot, construction of a new multi-modal facilities, installation of landscaping, and reconstruction of the play area and tot lot.
The proposed Project would restore the Aliso Creek Estuary from its current condition to a healthy, functional ecosystem. In its existing state the estuary is a degraded lagoon, which stores urban runoff and provides no significant value as a natural habitat for native plants, fish, or wildlife. The proposed Project would restore a portion of the wetland habitat that historically occupied the Project site, by removing the existing surface parking lot and associated artificial fill, widening the channelized watercourse, and restoring the estuarys natural connection to the ocean.
The Restoration Site Plan proposes new, upgraded park facilities designed to provide public opportunities to experience the restored ecosystem in a wilderness park setting. These features include an interpretive loop trail around the restored estuary with seating and viewing areas, a pedestrian bridge over the restored wetland habitat, and an overlook area suitable for guided educational visits (see Figure 3). The Public Access Plan emphasizes enhanced access to the site via multiple modes of transportation through a multi-modal mobility hub, consistent with citywide visitor mobility strategies (see Figure 3).
Similar Contracts
Same NAICS industry code
