Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Water Treatment Plant Caustic Soda Storage and Feed System Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Folsom is undertaking a major upgrade to its Water Treatment Plant located at 194 Randall Drive, Folsom, California, with the goal of modernizing the caustic soda storage and feed system. The project involves the complete removal of decommissioned steel tanks and associated piping, demolition of obsolete lime feed lines and an abandoned aqua ammonia tank, and structural modifications to the existing containment wall. New infrastructure includes a dedicated caustic feed tank, an expanded caustic containment area, new caustic feed pumps, and a corresponding feed pipeline. Extensive civil work is also required, such as replacing asphalt concrete pavement and poured concrete surfaces affected by construction activities. The scope integrates full electrical, instrumentation, and controls systems to support safe, automated operation of the new system, with all electrical components required to comply with NEMA enclosure types and NEC hazardous location classifications, including specific requirements for conduit sizing, grounding, sealing of penetrations, and wiring standards. The project is supported by a comprehensive set of 43 technical drawings covering architectural, mechanical, electrical, and structural disciplines, with design finalized in June 2025 under project number WA 2401 and contract number 173-21 23-037. The place of performance is strictly defined as the Folsom water treatment facility, and all work must be completed on-site with no delivery or shipping terms specified. While the contract does not include standard Federal Acquisition Regulation clauses, pricing details, contract value estimates, or formal evaluation factors, the documentation clearly outlines performance expectations tied to technical specifications and installation compliance. Responsibility for inspection, installation, and adherence to standards falls to the contractor, with the City of Folsom’s Utilities Director and Civil Engineer serving as primary points of contact. No socioeconomic set-asides, certifications, or federal procurement identifiers are referenced, indicating this is a local government procurement governed primarily by technical performance criteria rather than federal acquisition protocols.

General Info

Folsom upgrades water plant caustic system with new tanks, piping, electrical, and controls per technical specs.

Agency

California → City of Folsom

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Folsom, CA, 95630

Set-Aside

NONE

Documents

(1)

City of Folsom Water Treatment Plant Caustic Soda Storage & Feed System Design June 2025

PDFcontract-document

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Folsom
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Folsom
Office AddressN/A
Contacts
Marcus YasutakeLead Agency Contact: Utilities Director
Nathan StitesDesignated Project Contact; Assistance Civil Engineer

Full Description

Show more
The project is generally described as the removal of existing, decommissioned steel tanks and associated piping, modifications to the existing tank containment wall, installation of new caustic feed tank and new caustic containment area, installation of new caustic feed pumps and caustic feed pipeline, removal of existing lime feed piping and abandoned aqua ammonia tank, miscellaneous civil sitework including AC pavement and concrete replacement associated with the Work, and associated electrical, instrumentation, and controls.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
45th Ave SW Culvert Replacement and Habitat Restoration
Solicitation # 45th-ave-sw-culvert-replacement-habitat-restoration
The City of Seattle is seeking contractors for the replacement of a culvert along 45th Avenue SW and the associated restoration of surrounding habitat, with the project located in King County, Washington. The solicitation, identified as 2025-017, is open to Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting the city’s commitment to inclusive contracting practices. The work involves the removal of the existing infrastructure and installation of a new culvert system designed to improve water flow and structural integrity, while simultaneously restoring natural habitat features to support local ecosystems. The project is classified under NAICS code 237990, indicating it falls under other heavy and civil engineering construction, and the prime contractor is Shimmick Construction Company, Inc., which manages the solicitation process and serves as the point of contact for inquiries. The response deadline is August 12, 2026, with Jamie Miranda listed as the primary contact for all communications, reachable at 707-410-5070 or jmiranda@shimmick.com. While the physical location is in Seattle, no specific street address or zip code is provided in the data, and all performance is expected to occur within the state of Washington.
Shimmick Construction Company, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
International
City of Calgary - Request for Proposal - RFP 26-1667 For Glenmore RWPS Penstock Crossover Piping and Valve Replacement
Solicitation # AB-2026-05612
The City of Calgary is seeking qualified contractors to perform construction services for the Glenmore Raw Water Pump Station Penstock Crossover Piping and Valve Replacement project, which involves the complete replacement of existing penstock crossover piping and associated valves, demolition of the current standpipe, and lead abatement on existing infrastructure. The scope includes the supply, installation, testing, and commissioning of new crossover and standpipe piping systems, along with all valves, fittings, supports, steelwork, platform structures, grating, and other miscellaneous metalwork required to restore and enhance system functionality. All work must comply with applicable safety and environmental standards, particularly regarding lead abatement procedures. This opportunity is exclusively available to contractors pre-qualified by the City of Calgary and is issued under solicitation number AB-2026-05612, posted on August 8, 2026, with responses due by September 1, 2026. Proposals must be submitted via SAP Ariba, where detailed technical and administrative requirements are outlined in the RFP documents. The project is located in Alberta, and all inquiries should be directed to Waris Khattana, the primary point of contact, via the provided email or phone number. Only firms meeting the City’s pre-qualification criteria will be considered for award.
City of Calgary

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237990
New
SLED
27003-B Solids Removal
Solicitation # PE-65600-NONST-2027-000000250
Fayette County, Georgia is soliciting bids for the dredging and solids removal from lagoons under solicitation number PE-65600-NONST-2027-000000250, titled 27003-B Solids Removal. Interested contractors must submit their proposals by 3:00 p.m. on Tuesday, September 8, 2026, to the Purchasing Department located at 140 Stonewall Avenue West, Suite 204, Fayetteville, GA 30214. The opportunity is open to all qualified bidders without specific set-aside restrictions, and all bids must comply with the detailed requirements outlined in the attached Invitation to Bid document. The work will be performed within Fayette County, Georgia, and the county anticipates selecting a contractor capable of safely and efficiently removing accumulated solids to maintain lagoon functionality and regulatory compliance. All questions regarding the bid should be directed to Colette Cobb, the primary point of contact, via email at ccobb@fayettecountyga.gov or by phone at 770-305-5115. The solicitation was posted on August 7, 2026, and additional information, including full bid documents, can be accessed through the official state procurement portal using the provided UI link. Contractors are responsible for reviewing all documentation thoroughly prior to submission, as failure to meet specifications or deadlines may result in bid rejection. The county reserves the right to accept or reject any or all bids without explanation, and award decisions will be made based on compliance, competitive pricing, and demonstrated technical capability.
Fayette County Board of Commissioners

POSTED

about 15 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Fern Ridge Wildlife Area Coyote Creek Boating Access
Solicitation # S-63500-00017424
The Oregon Department of Fish and Wildlife is soliciting bids for the construction of a boating access facility at Coyote Creek within the Fern Ridge Wildlife Area under solicitation number S-63500-00017424. The project involves a range of civil and infrastructure construction activities including earthwork, driving steel piles, installing a paddle craft launch dock, sheet piling, storm drain piping and conveyance systems, aggregate base placement, concrete curbing and sidewalk construction, and asphalt paving. All work must be completed in accordance with specifications to ensure safe and durable access for recreational boating users. The solicitation is open to qualified contractors with no specific set aside identified and is managed through the state agency’s procurement system. Responses are due by September 3, 2026, at 11:00 PM Pacific Time, with the request publicly posted on August 7, 2026. The contract will be managed by the Oregon Department of Fish and Wildlife based in Salem, Oregon, with Claire Duvall listed as the primary point of contact. The place of performance is located in Salem, Oregon, and all work must be carried out at the designated site within the Fern Ridge Wildlife Area. Contractors are expected to comply with all state and federal regulations governing construction in protected wildlife areas, and full details are accessible through the provided online portal.
ODFW

POSTED

about 16 hours ago

DEADLINE

in 26 days
View Details