Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Cherry Valley Dam Spillway Short-Term Improvement Project

Forecast
2022-000353ENVState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The San Francisco Public Utilities Commission is implementing the Cherry Valley Dam Spillway Short-Term Improvement Project in Tuolumne County, California. The project focuses on rehabilitating a segment of the unlined spillway discharge channel to restore its original north-south alignment and properly direct water toward Cherry Creek. This action is necessary because landslide debris has obstructed the channel, causing flows to divert toward public camping areas and the Cherry Power Tunnel Adit entrance. The scope of work includes debris removal, embankment construction, erosion protection, and road improvements, with construction anticipated to last approximately six months starting in June 2026. The project is governed by the California Environmental Quality Act, with a Mitigated Negative Declaration and a Mitigation Monitoring and Reporting Program adopted on January 6, 2026. Key regulatory coordination involves the California Department of Fish and Wildlife regarding endangered species and streambed alterations, the Central Valley Regional Water Quality Control Board for water quality and storm water permits, and Caltrans for traffic impacts and encroachment permits on State Route 120. Special requirements include strict hazardous materials management using secondary containment and onsite spill kits, noise mitigation in compliance with local ordinances, and the potential suspension of work if archaeological resources are discovered. Traffic control measures, including flaggers and non-peak hour scheduling, are required to maintain pedestrian and vehicle circulation.

General Info

SFPUC will rehabilitate Cherry Valley Dam spillway in Tuolumne County starting June 2026.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Timothy JohnstonSenior Planner
Kelly YongProject Applicant

Interested Companies (1)

AecomDenver, Colorado

Full Description

Show more
The San Francisco Public Utilities Commission is proposing the Cherry Valley Dam Spillway Short-Term Improvement Project. The project would rehabilitate a segment of the ·existing unlined spillway discharge channel thatreceives Cherry Valley Dam spillway flows and directs the water toward Cherry Creek, in a generally north??south orientation. Debris from landslides on steep side slopes along the-discharge channel has obstructed the channel and caused the spillway flows to be diverted·east toward the Cherry Power Tunnel Adit entrance and public dispersed camping areas. The project would restore the alignment of the discharge channel to its original north-south orientation. Cherry Valley Dam and Lake are west of Lake Eleanor and Hetch Hetchy Reservoir in Tuolumne County, California, approximately 12 miles directly north of California State Route 120 or 23 miles north via Cherry Lake Road.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
CPK2504 - Eldridge Park Improvements
Solicitation # 2026-ITB-049
The City of Sugar Land has issued Invitation for Bid 2026-ITB-049 for the Eldridge Park Improvements project located at 2511 Eldridge Rd, Sugar Land, TX. The scope of work requires all labor, materials, and supervision to complete a Base Bid consisting of site preparation, tree protection, selective demolition, parking lot pavement and curb construction, waterline installation and connection to the City main, irrigation, grading, hydroseeding, ADA-compliant sidewalks, playground walls, and dumpster enclosure renovation. Additionally, the project includes two optional add-alternates: Add Alternate 1 for building improvements and Add Alternate 2 for the construction of a 210 by 345 foot synthetic turf field featuring an underground detention system, fencing, and furnishings. Bids must be submitted electronically via the OpenGov procurement portal by November 12, 2026, at 11:00 am. Respondents are required to submit a detailed bid pricing form covering the Base Bid, Owner Set Cash Allowances, and both Add Alternates, as well as complete a mandatory vendor questionnaire and acknowledge compliance with all insurance requirements. The selected contractor will be required to enter into the City of Sugar Land Standard Contract for Civil Engineering Construction Projects. The contract will be awarded by the City Council based on the terms provided in the Invitation to Bid.
Engineering

POSTED

about 19 hours ago

DEADLINE

in 6 days
View Details
NAICS: 237990
New
SLED
PIER B ON-DOCK RAIL SUPPORT FACILITY RAIL YARD ACCESS IMPROVEMENTS
Solicitation # HD-S3215
Solicitation HD-S3215, issued by the Long Beach Harbor Department for the Port of Long Beach, covers rail yard access improvements for the Pier B On-Dock Rail Support Facility. The scope of work includes the realignment, relocation, resurfacing, and rehabilitation of existing railroad tracks and the construction of new lead tracks within the Pier B rail yard and Pico Avenue corridor. Key technical requirements involve the installation of new railroad signal systems, modification of the signal system at CP Gaspur, and the implementation of special trackwork such as turnouts and crossovers. The project also encompasses extensive demolition of tracks, pavement, and utilities, as well as earthwork, grading, storm drain improvements, and the relocation of street lighting, all phased around active railroad operations. The contract requires strict adherence to AREMA manuals and CPUC General Orders, with a heavy emphasis on quality control and safety. Deliverables include a Site-Specific Safety Plan, a Railroad Work Plan, and certified Acceptance Test Reports, with testing for equipment and cabling performed by a NETA-certified independent agency. Bidders must submit electronic bids through the Port of Long Beach PB System, including a comprehensive proposal package and an SBE/VSBE Commitment Plan. The project is subject to various federal and state regulations, including the Davis-Bacon Act, the Buy America Act, and the Americans with Disabilities Act. Performance security is required in the form of payment and performance bonds for 100% of the contract price, and bid security must be at least 10% of the base bid.
Port of Long Beach

POSTED

about 19 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
46108 CONSTRUCTION
Solicitation # 46108-C
Project No. 46108-C is a unit price construction contract for the Cayuga Inlet Flood Risk Reduction and Restoration project located at 900 Taber Street in Ithaca, New York. Issued by the New York State Department of Environmental Conservation and the Office of General Services, the project has an estimated value between 23 million and 24 million dollars. The scope of work encompasses comprehensive site preparation, earthwork, and hydraulic dredging operations, including the management of filtrate from geotextile tube dewatering and the off-site disposal of organic, dredge, and construction debris. Key deliverables include a Marine Traffic Control Plan, daily hydraulic dredge reports, and detailed subsurface investigation reports. The project also requires pre-construction and progress bathymetric and topographic surveys, as well as the establishment of a site management facility for staging and spoil management. Bids are due by December 9, 2026, and must be submitted via Bid Express or as sealed paper bids to the Office of General Services in Albany. The contract will be awarded to the apparent low bidder based on a determination of bid responsiveness and bidder responsibility, which includes an evaluation of financial data, past performance on similar contracts, and the qualifications of key personnel such as the Project Manager and Site Safety Officer. Bidders must provide bid security of 599,200 dollars and, upon award, furnish performance and labor and material bonds for 100 percent of the contract price. Compliance with New York State Labor Law, prevailing wage schedules, and MWBE/SDVOB utilization plans is required. All imported materials must be approved by the Director's Representative and verified by a qualified geotechnical testing laboratory.
NYS OGS Design & Construction - Construction Contractors

POSTED

about 20 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
SLED
Freedom Park Boardwalk Repairs - Boardwalks 1 & 2
Solicitation # 26-8700
Solicitation 26-8700 is an invitation to bid issued by the Collier County Board of County Commissioners for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in Florida. The project has an anticipated budget of 1,300,000 dollars, which includes a 198,120 dollar Owner's Allowance for unforeseen conditions. The scope of work involves replacing deteriorated decking, structural supporting timber, fasteners, and hardware, as well as repairing damaged pilings and support beams. Technical requirements specify the use of IPE Wood and 5500 psi Type IV Portland Cement, with strict adherence to FDOT and ASCE standards and environmental protections for mangroves. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid and selected alternates. Bidders must provide a 5% bid bond and, upon award, furnish performance and payment bonds for 100% of the contract amount. The project timeline mandates completion within 134 calendar days from the Notice to Proceed, with work generally limited to weekdays between 7:00 a.m. and 7:00 p.m. Bids must be submitted electronically via the OpenGov portal by November 13, 2026, at 3:00 p.m. Contractors are required to hold a valid State of Florida General Contractors or Building Contractor license and must comply with all Environmental, Health, and Safety requirements, including OSHA and EPA regulations.
Procurement

POSTED

about 23 hours ago

DEADLINE

in 7 days
View Details

More opportunities from California → City and County of San Francisco

Same awarding agency

NAICS: 237990
SLED
Pier 92 Modernization and Plant Replacement ProjectThe Pier 92 Modernization and Plant Replacement Project, managed by the City and County of San Francisco, involves the reconstruction and modernization of an existing sand processing facility at the Port of San Francisco. The project aims to improve environmental controls through the construction of an enclosed warehouse, the installation and upgrading of equipment, the paving of vehicle and equipment areas, and the implementation of a modern stormwater management system. To accommodate these improvements, the facility is seeking to expand its lease area by 34,371 square feet, increasing the total footprint from 190,299 to 224,600 square feet. The project also includes obtaining an Authority to Construct and Permit to Operate from the Bay Area Air District with a proposed annual throughput limit of 800,000 tons. Construction is expected to last up to seven months and will involve the excavation or disturbance of 3,305 cubic yards of soil, while sand processing operations remain active. Environmental reviews conducted under CEQA have identified potential impacts on archaeological resources, which will be managed via accidental discovery procedures, and have addressed public concerns regarding air quality within the Bayview environmental justice community. Key coordinating agencies include the San Francisco Planning Department, the Port of San Francisco, the Bay Area Air District, and the San Francisco Bay Conservation and Development Commission. The project has undergone a comprehensive environmental impact report process with final certification hearings scheduled for October 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 1 month ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Potrero Power Staton Mixed-Use Development ProjectThe Potrero Power Station Mixed-Use Development Project is a multi-phased redevelopment of a 29-acre site along San Francisco's central bayshore waterfront, formerly the site of the Potrero Power Plant. The 2025 modified project expands the scope to approximately 5.6 million gross square footage across 15 development blocks, incorporating residential market-rate and affordable housing, commercial office, retail, hotel, research and development, and industrial production, distribution, and repair uses. The project also includes the creation of waterfront open space, a dock facility, shoreline improvements, and an internal grid of public streets and utilities. Construction began in 2020 with an original estimated completion date of 2035. The project is managed by the City and County of San Francisco and is governed by the Potrero Power Station Special Use District and CEQA guidelines. A critical component of the project is the Mitigation Monitoring and Reporting Program, which mandates strict compliance with environmental standards regarding air quality, noise, and biological resources. Key requirements include the use of renewable diesel, a two-minute idling limit for diesel engines, and the implementation of a Construction Emissions Minimization Plan. Additionally, the project requires the installation of ADA-compliant curb ramps and specific on-street ADA parking. Environmental safeguards are in place to protect marine mammals during pile driving and to manage the discovery of archaeological or paleontological resources, which may temporarily suspend construction.
Other Heavy and Civil Engineering Construction

POSTED

3 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
PG&E Power Asset Acquisition Project
Solicitation # 2023-005370ENV
The City and County of San Francisco is undertaking the acquisition of Pacific Gas and Electric Company’s electrical transmission and distribution assets within San Francisco and portions of San Mateo County to assume direct ownership, operation, and maintenance of the local electricity grid. This project does not involve natural gas facilities, which PG&E will continue to provide. The acquisition requires substantial physical separation of the existing electrical infrastructure along the San Francisco–San Mateo county boundary to enable independent and reliable operation by both the City and PG&E. Key construction activities include modifying or rebuilding the Martin Substation, constructing approximately 3.8 miles of new underground express distribution feeders routed through public rights-of-way from Arch Street to the Martin Substation in Brisbane, and making localized above- or below-ground modifications to distribution lines near the county line. Construction is expected to take approximately three years following asset transfer. The project’s environmental compliance is governed by California law, with all contractual obligations binding on the City, its successors, and assigns in perpetuity. Termination rights allow either party to end the agreement with thirty days’ written notice, and any unenforceable provisions will be severed without voiding the remainder. Administrative costs are outlined in detail, including annual recurring expenses for chip sealing, groundwater monitoring, trench maintenance, and DTSC oversight, with a total estimated contract value of $1,587,331 based on a thirty-year net present value calculation. An advance payment of $2,900 is required within ten days of full execution for DTSC, with quarterly billing and sixty-day payment terms. Contractors must comply with rigorous environmental and safety protocols, including mandatory Worker Environmental Awareness Program training covering protected species avoidance, hazardous material handling per Cal/OSHA standards, and site-specific Health and Safety Plans addressing chemicals of potential concern and emergency response. Extensive documentation, including permits, waste manifests, laboratory analyses, and chains of custody, must be submitted to DTSC upon completion. Attachments and appendices provide supporting technical data on noise, biological resources, air quality, hazardous materials, and historic gas plant sites, ensuring comprehensive regulatory adherence throughout the project lifecycle.
Power and Communication Line and Related Structures Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
2245-2255 Post Street (JFCS Holocaust Center) FMND
Solicitation # 2024-011443ENV
The City and County of San Francisco is overseeing the redevelopment of 2245-2255 Post Street for the Jewish Family and Children's Services Holocaust Center. The project involves the demolition of two existing buildings and the construction of a new four-story building, approximately 60 feet tall with a total height of 68 feet 6 inches including rooftop equipment. The new facility will encompass approximately 34,073 gross square feet and will feature public exhibition rooms, a lecture hall, a library, offices, educational and conference spaces, and archives. The project is designed without vehicular parking and is expected to take approximately 21 months to complete. The project is governed by the California Environmental Quality Act and adheres to NC-3 zoning and 65-A Height and Bulk District regulations. A Mitigated Negative Declaration has concluded that the project will not have significant adverse environmental impacts, provided specific mitigation measures are implemented. These include strict adherence to the San Francisco Clean Construction Ordinance, requiring Tier 4 Final off-road emission standards for equipment over 25 horsepower and a two-minute idling limit for diesel engines. Additionally, the project requires an archeological testing and monitoring program managed by an Environmental Review Officer, which may include construction suspensions of up to four weeks for data recovery. Contractors must also comply with Title 8 of the California Code of Regulations regarding hazard communication and the labeling of hazardous substances.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine