Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Freedom West 2.0 (710 McAllister Street, 889 McAllister Street, 735 Gough Street, 550 Fulton Street)

Forecast
2020-006887ENVState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Golden Gate Avenue, Gough Street, McAllister Street, Fulton Street, Laguna Street, San Francisco, CA, 94102

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Interested Companies (1)

Full Description

Show more
The proposed project would demolish 22 existing, low-rise buildings and construct 15 new buildings, ranging in height from 85 feet to 335 feet. The proposed development program includes a mix of residential uses (267 co-op housing units and 2,024 additional residential), a 150-room hotel, commercial and CIE uses, as well as associated vehicular and bicycle parking, freight loading, at-grade privately owned public open space, and a mix of residential common and private open space and open space for childcare. In total, the project would construct approximately 3.7 million gross square feet of mixed-use development. Construction of the proposed project would occur over approximately seven years. The project site would be rezoned from RTO to a new special use

Similar Contracts

Same NAICS industry code

More opportunities from California → City and County of San Francisco

Same awarding agency

NAICS: 237990
SLED
Pier 92 Modernization and Plant Replacement ProjectThe Pier 92 Modernization and Plant Replacement Project, managed by the City and County of San Francisco, involves the reconstruction and modernization of an existing sand processing facility at the Port of San Francisco. The project aims to improve environmental controls through the construction of an enclosed warehouse, the installation and upgrading of equipment, the paving of vehicle and equipment areas, and the implementation of a modern stormwater management system. To accommodate these improvements, the facility is seeking to expand its lease area by 34,371 square feet, increasing the total footprint from 190,299 to 224,600 square feet. The project also includes obtaining an Authority to Construct and Permit to Operate from the Bay Area Air District with a proposed annual throughput limit of 800,000 tons. Construction is expected to last up to seven months and will involve the excavation or disturbance of 3,305 cubic yards of soil, while sand processing operations remain active. Environmental reviews conducted under CEQA have identified potential impacts on archaeological resources, which will be managed via accidental discovery procedures, and have addressed public concerns regarding air quality within the Bayview environmental justice community. Key coordinating agencies include the San Francisco Planning Department, the Port of San Francisco, the Bay Area Air District, and the San Francisco Bay Conservation and Development Commission. The project has undergone a comprehensive environmental impact report process with final certification hearings scheduled for October 2026.
Other Heavy and Civil Engineering Construction

POSTED

about 2 months ago

DEADLINE

N/A
View Details
NAICS: 237990
SLED
Potrero Power Staton Mixed-Use Development ProjectThe Potrero Power Station Mixed-Use Development Project is a multi-phased redevelopment of a 29-acre site along San Francisco's central bayshore waterfront, formerly the site of the Potrero Power Plant. The 2025 modified project expands the scope to approximately 5.6 million gross square footage across 15 development blocks, incorporating residential market-rate and affordable housing, commercial office, retail, hotel, research and development, and industrial production, distribution, and repair uses. The project also includes the creation of waterfront open space, a dock facility, shoreline improvements, and an internal grid of public streets and utilities. Construction began in 2020 with an original estimated completion date of 2035. The project is managed by the City and County of San Francisco and is governed by the Potrero Power Station Special Use District and CEQA guidelines. A critical component of the project is the Mitigation Monitoring and Reporting Program, which mandates strict compliance with environmental standards regarding air quality, noise, and biological resources. Key requirements include the use of renewable diesel, a two-minute idling limit for diesel engines, and the implementation of a Construction Emissions Minimization Plan. Additionally, the project requires the installation of ADA-compliant curb ramps and specific on-street ADA parking. Environmental safeguards are in place to protect marine mammals during pile driving and to manage the discovery of archaeological or paleontological resources, which may temporarily suspend construction.
Other Heavy and Civil Engineering Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 237130
SLED
PG&E Power Asset Acquisition Project
Solicitation # 2023-005370ENV
The City and County of San Francisco is undertaking the acquisition of Pacific Gas and Electric Company’s electrical transmission and distribution assets within San Francisco and portions of San Mateo County to assume direct ownership, operation, and maintenance of the local electricity grid. This project does not involve natural gas facilities, which PG&E will continue to provide. The acquisition requires substantial physical separation of the existing electrical infrastructure along the San Francisco–San Mateo county boundary to enable independent and reliable operation by both the City and PG&E. Key construction activities include modifying or rebuilding the Martin Substation, constructing approximately 3.8 miles of new underground express distribution feeders routed through public rights-of-way from Arch Street to the Martin Substation in Brisbane, and making localized above- or below-ground modifications to distribution lines near the county line. Construction is expected to take approximately three years following asset transfer. The project’s environmental compliance is governed by California law, with all contractual obligations binding on the City, its successors, and assigns in perpetuity. Termination rights allow either party to end the agreement with thirty days’ written notice, and any unenforceable provisions will be severed without voiding the remainder. Administrative costs are outlined in detail, including annual recurring expenses for chip sealing, groundwater monitoring, trench maintenance, and DTSC oversight, with a total estimated contract value of $1,587,331 based on a thirty-year net present value calculation. An advance payment of $2,900 is required within ten days of full execution for DTSC, with quarterly billing and sixty-day payment terms. Contractors must comply with rigorous environmental and safety protocols, including mandatory Worker Environmental Awareness Program training covering protected species avoidance, hazardous material handling per Cal/OSHA standards, and site-specific Health and Safety Plans addressing chemicals of potential concern and emergency response. Extensive documentation, including permits, waste manifests, laboratory analyses, and chains of custody, must be submitted to DTSC upon completion. Attachments and appendices provide supporting technical data on noise, biological resources, air quality, hazardous materials, and historic gas plant sites, ensuring comprehensive regulatory adherence throughout the project lifecycle.
Power and Communication Line and Related Structures Construction

POSTED

5 months ago

DEADLINE

N/A
View Details
NAICS: 541620
SLED
2245-2255 Post Street (JFCS Holocaust Center) FMND
Solicitation # 2024-011443ENV
The City and County of San Francisco is overseeing the redevelopment of 2245-2255 Post Street for the Jewish Family and Children's Services Holocaust Center. The project involves the demolition of two existing buildings and the construction of a new four-story building, approximately 60 feet tall with a total height of 68 feet 6 inches including rooftop equipment. The new facility will encompass approximately 34,073 gross square feet and will feature public exhibition rooms, a lecture hall, a library, offices, educational and conference spaces, and archives. The project is designed without vehicular parking and is expected to take approximately 21 months to complete. The project is governed by the California Environmental Quality Act and adheres to NC-3 zoning and 65-A Height and Bulk District regulations. A Mitigated Negative Declaration has concluded that the project will not have significant adverse environmental impacts, provided specific mitigation measures are implemented. These include strict adherence to the San Francisco Clean Construction Ordinance, requiring Tier 4 Final off-road emission standards for equipment over 25 horsepower and a two-minute idling limit for diesel engines. Additionally, the project requires an archeological testing and monitoring program managed by an Environmental Review Officer, which may include construction suspensions of up to four weeks for data recovery. Contractors must also comply with Title 8 of the California Code of Regulations regarding hazard communication and the labeling of hazardous substances.
Environmental Consulting Services

POSTED

10 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS