PG&E Power Asset Acquisition Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City and County of San Francisco is undertaking the acquisition of Pacific Gas and Electric Company’s electrical transmission and distribution assets within San Francisco and portions of San Mateo County to assume direct ownership, operation, and maintenance of the local electricity grid. This project does not involve natural gas facilities, which PG&E will continue to provide. The acquisition requires substantial physical separation of the existing electrical infrastructure along the San Francisco–San Mateo county boundary to enable independent and reliable operation by both the City and PG&E. Key construction activities include modifying or rebuilding the Martin Substation, constructing approximately 3.8 miles of new underground express distribution feeders routed through public rights-of-way from Arch Street to the Martin Substation in Brisbane, and making localized above- or below-ground modifications to distribution lines near the county line. Construction is expected to take approximately three years following asset transfer. The project’s environmental compliance is governed by California law, with all contractual obligations binding on the City, its successors, and assigns in perpetuity. Termination rights allow either party to end the agreement with thirty days’ written notice, and any unenforceable provisions will be severed without voiding the remainder. Administrative costs are outlined in detail, including annual recurring expenses for chip sealing, groundwater monitoring, trench maintenance, and DTSC oversight, with a total estimated contract value of $1,587,331 based on a thirty-year net present value calculation. An advance payment of $2,900 is required within ten days of full execution for DTSC, with quarterly billing and sixty-day payment terms. Contractors must comply with rigorous environmental and safety protocols, including mandatory Worker Environmental Awareness Program training covering protected species avoidance, hazardous material handling per Cal/OSHA standards, and site-specific Health and Safety Plans addressing chemicals of potential concern and emergency response. Extensive documentation, including permits, waste manifests, laboratory analyses, and chains of custody, must be submitted to DTSC upon completion. Attachments and appendices provide supporting technical data on noise, biological resources, air quality, hazardous materials, and historic gas plant sites, ensuring comprehensive regulatory adherence throughout the project lifecycle.

General Info

San Francisco to acquire PG&E’s electric assets, build new feeders and upgrade Martin Substation for local grid control.

Agency

California → City and County of San Francisco

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City and County of San Francisco
Contacts4 people available
OfficeN/A
Organization / Agency
California → City and County of San Francisco
Office AddressN/A
Contacts
Julie MooreSenior Planner
Monica HugginsPlanner Technician
Sue ChauProject Applicant
Karen LancelleConsultant

Interested Companies (1)

ESALos Angeles, CA

Full Description

Show more
The City and County of San Francisco (the “City”) is proposing to purchase Pacific Gas and Electric Company (PG&E)-owned electrical transmission and distribution assets (the “Assets”) in San Francisco and San Mateo County that are needed to provide electricity service to customers within the city (the “project”). After the City completes its acquisition of the Assets, the City would own, operate, and maintain the electricity grid in San Francisco, most of which is currently owned by PG&E. This project does not include the purchase of PG&E’s natural gas facilities; thus, PG&E would continue providing natural gas services to customers in San Francisco. The change in ownership itself would not result in physical changes to the environment requiring environmental review; however, construction would be needed to physically separate PG&E’s existing electric system into two separate systems (generally divided along the San Francisco/San Mateo county border), to allow both systems to be safely, reliably, and independently operated by the City and PG&E. The City would provide electricity service to city customers; PG&E would continue to provide electricity service to its customers outside of San Francisco. The EIR focuses on these areas where physical changes to the environment would occur as a result of the project. The portion of the project requiring new construction or modifications to existing facilities would primarily be in the southern portion of San Francisco and along the county border in the northern portions of Brisbane and Daly City. The City would modify the existing Martin Substation (or construct a new substation, which is analyzed in the EIR as a new substation variant), construct new underground express distribution feeders, and modify the existing distribution infrastructure. The distribution express feeders alignment would be approximately 3.8 miles long and generally installed within streets, sidewalks, and other publicly owned land. It would extend from near Arch Street in the west, south to Brotherhood Way and Sagamore Street, east along Sickles Avenue, northeast along Huron Avenue and Alemany Boulevard, and southeast along Geneva Avenue to the Martin Substation in Brisbane. Disconnecting and connecting distribution lines between overhead poles and underground vaults could occur either above- or below-ground, and would be performed in small, discontinuous areas generally located near the county border. Construction associated with the project would take approximately 3 years after the purchase and transfer of the Assets.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
SLED
24-17.10
Solicitation # 24-17.10
The City of Piqua, Ohio, is soliciting bids for project 24-17.10, which involves the electrical construction of the Piqua 69kV The Site Substation. With an engineer's estimate of $1,310,000, the scope of work includes furnishing and installing major equipment such as liquid-filled step-down transformers, circuit breakers, and switches, as well as the construction of 69kV incoming, switch, metering, and transformer structures. Additional requirements encompass the installation of grounding systems, above-ground conduits, and comprehensive site work including excavation, structural fill, grading, and site restoration. The project must adhere to strict technical standards, including NESC, NEC, IEEE, and ANSI, and requires compliance with Ohio State Prevailing Wage laws and the Americans with Disabilities Act. Bids are due by October 29, 2026, and must be submitted in duplicate. Award selection will be based on a comparison of relative merits and the lowest and best bid. Successful bidders must provide a bid bond of no less than 10%, as well as performance and payment bonds equal to the contract price. The contract also mandates a Drug Free Workplace Compliance Affidavit and requires contractors to assist the owner during the start-up and commissioning of all systems. Performance is subject to a penalty of $500 per calendar day for deliveries exceeding the designated completion date. All equipment must be delivered F.O.B. to the job site in undamaged condition with detailed packing lists.
City of Piqua

POSTED

about 8 hours ago

DEADLINE

in 1 day
View Details
NAICS: 237130
New
SLED
Traffic Signal Synchronization Project Along Hamner Ave And Archibald Ave
Solicitation # 26-119CIP
The City of Eastvale, California, is soliciting bids for the Traffic Signal Synchronization Project Along Hamner Avenue and Archibald Avenue under solicitation number 26-119CIP. The project involves the installation of traffic signal controllers, field ethernet switches, fiber optic trunk and breakout cables, and conflict monitor units, as well as the implementation of hybrid detection systems. The scope includes significant infrastructure work such as installing PVC conduits, pull boxes, and performing pavement restoration. All work must be completed within 50 working days from the commencement date and must adhere to the standards of the County of Riverside, Caltrans, and the Americans with Disabilities Act. The contract will be awarded to the apparent low bidder based on the total bid price, including the base bid and specific alternates. To be eligible, the prime contractor must hold a current California Class A General Engineering Contractor license. Required submission documents include a signed bid form, bid security, a statement of qualifications, and a non-collusion declaration, all submitted via the PlanetBids portal. The selected contractor will be required to provide construction performance, labor and material payment, and warranty bonds. Payment will be administered on a lump sum basis according to an approved schedule of values, with final payment contingent upon the submission of project record drawings and the execution of a release of claims.
City of Eastvale

POSTED

about 11 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers Chicago District is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified contractors for the CSSC Utility Feed Transformer Replacement project. Located at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois, the project requires the turnkey removal and disposal of two existing utility feed transformers and the installation, testing, and commissioning of two new operational replacements. The new units must have a capacity of 4,000/5,000 kVA, a primary voltage of 13,200 volts, and a secondary voltage of 480Y/277 volts in a three-phase, 60 Hz, Delta-Wye configuration. The contractor will be responsible for all labor, materials, rigging, and supervision, while reusing existing concrete pads, cabling, and switchgear. The anticipated period of performance is 365 calendar days from the Notice to Proceed. This is not a formal request for proposals or quotes, but a capability assessment to determine the availability of small businesses under NAICS code 237130. Key requirements for interested firms include a proven track record with medium-voltage electrical systems, compliance with USACE EM 385-1-1 and NFPA 70E safety standards, and the ability to meet strict procurement lead times. Responses must be submitted by November 5, 2026, and include a technical capability statement, project examples, and documentation of bonding limits. Firms must also specify their ability to satisfy limitations on subcontracting per FAR 52.219-14.
W072 Endist Chicago

POSTED

about 16 hours ago

DEADLINE

in 9 days
View Details
NAICS: 237130
New
SLED
2026-28 Electric Infrastructure Reconducts
Solicitation # 2026-28
The City of Covington, Georgia, is soliciting proposals under RFP #2026-28 for the reconduct of three-phase overhead utility lines across three separate projects. The scope of work includes Project 1 at Cornish Creek Newtonsboro Road, Project 2 at Elm and Reynold Streets, and Project 3 involving Eagle and Goldar General locations. The selected contractor will provide all labor, equipment, and coordination for the installation of poles, crossarms, conductors, and hardware, while the City will supply all materials. All work must be completed by May 31, 2027, and must adhere to first-quality workmanship and standard utility practices. Proposals must be submitted in sealed envelopes, including one USB drive copy, to the Covington Utility Complex by 10:00am on November 24, 2026. A mandatory pre-proposal meeting is scheduled for November 9, 2026. Submission requirements include a 5% bid bond, a non-collusion affidavit, and verification of compliance with the Illegal Immigration Reform and Enforcement Act of 2011. The awarded contractor must provide payment and performance bonds for 100% of the contract amount within ten days of notification and maintain comprehensive general liability, automobile liability, and worker's compensation insurance with limits of at least $1,000,000. Evaluation will be based on experience, personnel certifications, project approach, cost reasonableness, safety records, and references.
City of Covington

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 237130
New
SLED
Solar Streetlight Project – Phase 3
Solicitation # 8385
The Solar Streetlight Project – Phase 3 (C.I.P. No. 8385) is a solicitation by the City of Vista, California, for the receiving, storing, transporting, and installation of 125 solar streetlights. The scope of work includes the installation of galvanized steel and concrete light poles, solar modules, power centers, batteries, and luminaires. Comprehensive tasks involve excavation, concrete placement, pole erection, and the repair of any work-related damage to sidewalks, curbs, and utilities. The contractor is responsible for all labor, materials, and equipment, including hoisting and rental gear, traffic and parking control, public notifications, and the implementation of erosion and stormwater protection measures. All work must adhere to ADA standards for curb ramps and sidewalks and be performed during specified working hours, with lane closures restricted to 8:30 AM to 3:30 PM, Monday through Friday. The contract will be awarded to the lowest responsible bidder based on the total amount of Base Bid Items. To be eligible, bidders must possess the required licensure, provide proof of DIR registration per Section 1725.5 of the California Labor Code, and submit bids electronically via the OpenGov Procurement portal by November 25, 2026. Local business entities, as well as certified veteran-owned or disabled veteran business enterprises, may be eligible for specific preferences. Awarded contractors must provide performance and payment bonds, as well as workers' compensation insurance, within ten working days of the Notice of Intent to Award. Payment is processed via progress payments within 30 calendar days of receipt of a valid invoice, contingent upon the submission of certified payroll records and lien releases. Construction must commence within ten working days of the Notice to Proceed, with punchlist items to be completed within twenty working days of issuance.
City of Vista

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 237130
New
SLED
ON-CALL FIBER OPTIC INSTALLATION, FUSION SPLICING, TERMINATION, TESTING AND RELATED SERVICES
Solicitation # 26-032
The City of Carson is soliciting proposals under RFP #26-032 for qualified telecommunications firms to provide on-call fiber optic installation, fusion splicing, termination, testing, and related services for its municipal fiber optic network. The scope includes working on both new and existing infrastructure, with specific requirements for pulling cable and performing industry-standard testing, including power meter and bi-directional OTDR (1310/1550 nm). The City may award a single or multiple contracts with an anticipated term of five years. Performance standards are strict, requiring emergency onsite arrival within two hours and the start of splice work within four hours, while all test results and documentation must be submitted within two business days of assignment completion. Proposals must be submitted electronically via PlanetBids by November 12, 2026, at 2:00 PM PT. The evaluation process consists of a mandatory written proposal review, followed by optional interviews for high-ranking firms, with the award based on the best overall value in accordance with Carson Municipal Code. Selected contractors must adhere to a minimum local hiring requirement of 30 percent for employees and subcontractors. Financial security requirements include performance and payment bonds totaling 100 percent of the total compensation. Additionally, contractors must provide a detailed safety plan for any trench excavations five feet or deeper on projects exceeding 25,000 dollars and comply with all prevailing wage and insurance requirements.
City of Carson

POSTED

2 days ago

DEADLINE

in 16 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS