Bidwell Canyon Underground Residential Distribution (URD) Replacement

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Surprise Valley Electric Corporation will undertake a powerline system improvement project along County Road 224 in Bidwell Canyon, Fort Bidwell, California, replacing existing overhead powerlines with an underground residential distribution cable. The project will install approximately 4,800 feet of underground power cable starting at the end of the pavement and extending westward within the existing county right-of-way. This initiative is designed to significantly reduce the risk of wildfires by eliminating exposed overhead lines while simultaneously enhancing the reliability of electric service to customers in the area. The work is part of a broader effort to modernize the local distribution infrastructure and is being managed under the jurisdiction of Modoc County, with Sean Curtis serving as the primary point of contact as Interim Planning Director and Nick Brandow as the Distribution Manager for SVEC. The project was posted as a forecast on June 18, 2026, and the place of performance is clearly identified in the 96112 zip code area of California.

General Info

SVEC to install 4,800 feet of underground power cable along County Road 224 to reduce wildfire risk and improve reliability.

Agency

California → Modoc County

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA, 96112

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Bidwell Canyon URD Replacement Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Modoc County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Modoc County
Office AddressN/A
Contacts
Sean CurtisInterim Planning Director
Nick BrandowDistribution Manager

Full Description

Show more
Surprise Valley Electric Corporation (SVEC) will install Underground Power Cable alongside County Road 224 in Bidwell Canyon, Fort Bidwell CA within the existing County right-of-way. SVEC and contracting parties will be conducting a Powerline system improvement in which overhead powerlines will be removed and underground power lines will be installed. The underground cable will start at the end of the pavement on County Road 224 and extend west approximately 4,800 feet alongside the County Road. This system improvement will greatly reduce the risk of wildfires and deliver reliable power to customers supplied by this section of line.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 6 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
Federal
Sources Sought for the Recapitalization of the Navy’s High Voltage (230kV) Transmission Loop and all Ancillary Equipment at Naval Submarine Base Kings Bay, GA
Solicitation # N69450-26-R-PW20
The Department of Defense, through Navfacsyscom Southeast, is conducting a sources sought effort to identify qualified participants for the wholesale recapitalization and cybersecurity hardening of the 230kV high voltage transmission loop and all ancillary equipment at Naval Submarine Base Kings Bay, Georgia. This critical infrastructure project is essential for the nuclear deterrent mission and requires seamless integration with the Georgia Power Company (GPC) grid. The anticipated scope of work is a design-build effort including the relocation of the high power loop and crossing tower, replacement of conductors, installation of smart motor-operated disconnects and vacuum/SF6 circuit breakers, and the modernization of substation digital protective relays with encrypted SCADA telemetry. All work must comply with NERC CIP standards and DoD Unified Facilities Criteria for Industrial Control Systems. The estimated magnitude of the procurement is between $100 million and $250 million, with a projected period of performance of approximately 900 calendar days. Due to the proprietary nature of the utility provider's SCADA software and the requirement for specialized network access, the government is considering a sole-source procurement with GPC under FAR 6.103-1. However, interested parties under NAICS 237130 or 221122 may respond by October 6, 2026. Qualified respondents must demonstrate a single-project bonding capacity of $200 million, provide evidence of NERC CIP compliance, and ensure key personnel possess at least Tier 3/Secret security clearances. The resulting contract is expected to be a firm-fixed-price award.
Navfacsyscom Southeast

POSTED

about 22 hours ago

DEADLINE

in 14 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement