Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Multi TD Talbert Marsh Deteriorated Pole Replacement Project, (Notification of Lake or Streambed Alteration, No. EPIMS-ORA-63917-R5)

Forecast
EPIMS-ORA-63917-R5State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Fish and Wildlife has entered into Lake and Streambed Alteration Agreement EPIMS-ORA-63917-R5 with Southern California Edison Company for the Multi TD Talbert Marsh Deteriorated Pole Replacement Project in Costa Mesa, California. The project involves the removal and replacement of eleven deteriorated wood utility poles, one H-frame wood structure, and two associated 3-eyed rod screw anchors. To facilitate these installations, three cranes will be utilized across three designated staging pads. The project is categorically exempt under California Environmental Quality Act guidelines as it involves minor alterations to existing public utility structures with negligible expansion. The project will result in temporary impacts to 0.448 acres of vegetation, including Quailbush Scrub, Menzies Golden Bush Scrub, Mulefat Thickets, and Arroyo Willow Thickets. Mitigation efforts include crown reduction of less than 60 percent for eleven arroyo willow trees and the restoration of impacted areas through the salvage and replacement of the top six inches of topsoil. The agreement mandates the use of qualified biological monitors and requires the submission of a Final Construction Report within 60 days of project completion. The agreement is scheduled to expire on March 4, 2031, and grants the Department of Fish and Wildlife the authority to inspect project areas and revoke the agreement if non-compliance occurs.

General Info

Southern California Edison replaces poles and structures in Talbert Marsh with temporary habitat disturbance and post-construction restoration.

Agency

California → Fish and Wildlife, Region 5 - South Coast, San Diego

Place of Performance

Costa Mesa, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 5 - South Coast, San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 5 - South Coast, San Diego
Office AddressN/A
Contacts
Dane St. GeorgeSenior Environmental Scientist (Specialist)
Victoria ParsonsSenior Manager

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-ORA-63917-R5, pursuant to section 1602 of the Fish and Game Code to Southern California Edison Company (SCE). The Project consists of removing and replacing eleven existing single utility deteriorated wood poles with eleven new single wood utility poles, removing and replacing one existing H-frame wood structure with one new H-frame wood structure, and removing and replacing two existing 3-eyed rod screw anchors with two 3-eyed rod screw anchors associated with the H-frame structure. Three cranes will be used to set new utility poles and the new H-frame wood structure. The Project activity’s total temporary impacts of 0.448-acre include vegetation trimming and crushing, staging, overland travel, excavation, and general work activities. The temporary impact area consists of Quailbush Scrub, Menzies’s Golden Bush Scrub, Mulefat Thickets, and Arroyo Willow Thickets. Tree trimming may occur on a total of eleven arroyo willow trees ranging from 8-24 inches diameter at breast height. Tree trimming will result in crown reduction of less than 60 percent on eleven arroyo willow trees. SCE will restore the 0.448 acre of temporary impacts on site by recontouring and replacing topsoils to pre-Project conditions.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
ACT-1427-00 Construction Cycle 10 (CC10) Concrete Test Pavement Construction at Wm. J. Hughes Technical Center Atlantic City, NJ
Solicitation # act-1427-00-construction-cycle-10-cc10-concrete-test-pavement-construction-wm-j-hughes-technical
Parsons Corporation is soliciting bids for the Construction Cycle 10 project at the William J. Hughes Technical Center in Atlantic City, New Jersey, supporting the FAA Airport Technology Research and Development branch. The scope of work involves the controlled demolition of existing pervious runway test pavement and the construction of new concrete test slabs measuring approximately 310 by 52.5 feet with a thickness of 15.5 inches. Key requirements include providing aggregate subbase, updating the asphalt base to a stabilized drainable base course, and performing minor design adjustments to plans and specifications. The project necessitates a comprehensive approach including the procurement of materials, waste removal, and the integration of professional engineering and testing services. Material characterization tests, such as California Bearing Ratio and Plate Load tests, will be sequenced into the construction process, requiring phased operations and continuous subgrade elevation adjustments. This is a small business set-aside solicitation with a response deadline of January 25, 2027. Work is generally scheduled for normal business hours, Monday through Friday, though some after-hours and weekend work may be required.
Parsons Corporation

POSTED

about 2 hours ago

DEADLINE

in 2 months
View Details
NAICS: 237130
New
International
Нове будівництво електричних мереж 0,4 кВ та ТП-10/0,4 кВ для електропостачання електроустановок індустріального парку КП "Агенція місцевого економічного розвитку" за адресою:м. Чортків, вул. Об'їзна (Чортківська ОТГ), Чортківського р-ну, Тернопільської о
Solicitation # UA-2026-11-09-009495-a
This contract involves the new construction of 0.4 kV electrical networks and a 10/0.4 kV transformer substation to provide power to the industrial park managed by the Municipal Enterprise Agency for Local Economic Development. The project is located on Obyizna Street in Chortkiv, Ternopil region, and is being implemented as part of the Ukraine Facility initiative under the Framework Agreement between Ukraine and the European Union, ratified by Law No. 3786-IX. The procurement process is managed by the Agency for Local Economic Development of the Chortkiv City Council under solicitation number UA-2026-11-09-009495-a. Interested parties must submit their responses by November 25, 2026. Detailed technical, qualitative, and quantitative requirements for the work are specified within the tender documentation's technical specifications.
Комунальне підприємство "Агенція місцевого економічного розвитку" Чортківської міської ради

POSTED

1 day ago

DEADLINE

in 15 days
View Details
NAICS: 237130
New
International
Pacific Science Enterprise Center (PSEC) - Power Distribution Upgrade
Solicitation # 30008413
Fisheries and Oceans Canada is soliciting the supply, installation, testing, and commissioning of new underground electrical distribution and communications infrastructure at the Pacific Science Enterprise Center in West Vancouver, British Columbia. The scope of work includes comprehensive civil works such as excavation, trenching, and surface restoration, as well as the installation of electrical cabling, access vaults, pull boxes, and outdoor electrical kiosks. Additionally, the contractor is responsible for the complete electrical infrastructure for new Electric Vehicle Supply Equipment, including feeders, wiring, and concrete bases. All project activities, including final clean-up and demobilization, must be completed by March 19, 2027. This procurement follows a two-phase selection process. Phase 1 evaluates bidder qualifications and experience, requiring at least one reference project of similar scope completed within the last five years. Pre-qualified bidders will then be invited to Phase 2 to provide a financial bid based on detailed specifications and drawings. This opportunity is a conditional set-aside under the Procurement Strategy for Indigenous Business, requiring certified Indigenous businesses to provide specific certifications. Bidders must also be in good standing with WorkSafeBC and comply with the Canada Labour Code and Canadian Occupational Health and Safety Regulations.
Department of Fisheries and Oceans

POSTED

2 days ago

DEADLINE

in 6 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS