Discovery Solar PV and Storage Project by Discovery Solar PV and Storage, LLC

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Discovery Solar PV and Storage Project, managed by Discovery Solar PV and Storage, LLC, is a renewable energy initiative located on approximately 7,700 acres of privately owned land in southeastern Kern County, California, specifically near Mojave. The project is designed to generate up to 1,400 megawatts of solar energy and provide up to 8 gigawatt-hours of energy storage capacity. Key infrastructure includes photovoltaic solar modules, battery energy storage systems, a 230 kilovolt switchyard, up to three onsite collector substations, an operations and maintenance facility, and a generation-tie line connecting the facility to the existing Windhub Substation. The project has undergone an extensive environmental review process under the California Environmental Quality Act, including the preparation of a Draft Environmental Impact Report and consultations with the California Department of Fish and Wildlife and the Native American Heritage Commission. Key environmental considerations include the protection of special-status species, such as the western Joshua tree and Mojave desert tortoise, and the preservation of tribal cultural resources. The project is subject to prevailing wage requirements and community workforce agreements for construction exceeding one million dollars. Construction is scheduled in phases starting in October 2025, with system installation and building construction continuing through June 2027. Final approval was granted via a Notice of Determination issued by the Kern County Board of Supervisors on June 16, 2026.

General Info

Discovery Solar project in Kern County: 1,400MW solar, 8GWh storage, starting October 2025.

Agency

California → Kern County

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

Tehachapi Willow Springs Road and LADWP Aqueduct, Mojave, CA, 93560

Set-Aside

NONE

Documents

(19)

Discovery_Draft EIR_Vol 4

PDF

Discovery Solar PV and Storage Project Draft Environmental Impact Report Volume 2

PDFenvironmental-impact-report

2025071048_CDFW Comment on Discovery Solar PV and Storage Project NOP

PDFcomment-letter

Notice of Public Hearing for Discovery Solar PV and Storage Project

PDFspecial-notice

Discovery Solar PV and Storage Project Draft Environmental Impact Report Volume 6

PDFenvironmental-impact-report

Discovery Solar PV and Storage Project Draft Environmental Impact Report Notice of Availability

PDFspecial-notice

Discovery Solar PV and Storage Project NOP July 2025

PDFnotice-of-preparation

Discovery Solar PV and Storage Project DEIR Summary Form

PDFenvironmental-impact-report-summary

Discovery Solar PV and Storage Project Notice of Completion

PDFnotice-of-completion

Discovery Draft Environmental Impact Report Volume 5 Appendix H Phase I Environmental Site Assessment

PDFenvironmental-impact-report

Discovery_Draft EIR_Vol 5

PDF

Notice of Determination for Discovery Solar PV and Storage Project

PDFnotice-of-determination

Memo for SCH #2025071048 Discovery Solar PV and Storage Project

PDFmemo

Discovery Solar PV and Storage Project Notice of Completion

PDFnotice-of-completion

Discovery Solar PV and Storage Project Draft Environmental Impact Report Volume 3

PDFenvironmental-impact-report

_Discovery_DEIR_Revision_Memo_OCR_

ZIP

2025071048 NAHC Comment on Discovery Solar PV and Storage Project

PDFcomment

Draft Environmental Impact Report for Discovery Solar PV and Storage Project SCH# 2025071048 Volume 1

PDFenvironmental-impact-report

2025071048_CDFW Comment on Discovery Solar PV and Storage Project DEIR

PDFcomment-letter

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts
Mark TolentinoPlanner III
Simon DayVice President – Head of Solar Development

Full Description

Show more
The proposed Discovery Solar PV and Storage Project is a photovoltaic (PV) solar facility with associated infrastructure necessary to generate up to to 1,400 megawatts (MW) of renewable electrical energy with up to 8 gigawatt-hours (GWh) of energy storage capacity (approximately 1,000 MW) on an approximate 7,700 acre project site, across 473 privately owned parcels, in an unincorporated area of southeastern Kern County. Associated project infrastructure includes an operations and maintenance (O&M) facility, telecommunication facilities, energy storage system(s), a 230 kilovolt switchyard, up to three onsite collector substations, and temporary laydown yards. The proposed project also includes a generation-tie (gen-tie) line to connect the project to the existing Windhub Substation.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 237130
New
SLED
Radio Tower & Building Tower, San Antonio DHQ - SAT
Solicitation # 15-470426753
The Texas Department of Transportation (TxDOT) is soliciting bids for a turnkey communications site project at the San Antonio DHQ in Bexar County, Texas. This State Let Building Contract involves the demolition of an existing 300ft tower and the design, fabrication, and installation of a new 350ft self-supporting tower, a 10x20 equipment shelter, a 30KW diesel generator, and a heavy hurricane fence. The scope includes all civil site work, power and data hookups, antenna systems, and the installation of Drake Lighting for FAA compliance. All technical drawings and design calculations must be sealed and signed by a Texas licensed engineer and adhere to ANSI/TIA/EIA-222H and AISI structural standards. Bids are due by November 3, 2026, at 12:00 PM CT and must be submitted via the Euna Procurement Portal. The contract will be awarded to the lowest responsive bidder. Required submission documents include a lump sum bid form, a bid bond of 20,000, a HUB subcontracting plan, and a signed E-Verify memorandum. The project has a contract duration of 365 days, and the agency will not disclose an estimated construction cost. Contractors must comply with the Davis-Bacon Act, Texas Government Code Chapter 2258 for prevailing wages, and TxDOT's third-party ethics and Buy Texas requirements. Payment is processed through TxDOT forms and requires the submission of an updated work progress schedule.
Texas Department Of Transportation

POSTED

3 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237130
New
International
Fibre Optic Infrastructure Expansion 80 Avenue - 202A Street to 216 Street
Solicitation # 26-160
The Township of Langley is soliciting tenders for solicitation number 26-160, titled Fibre Optic Infrastructure Expansion 80 Avenue - 2020A Street to 216 Street. The primary scope of work involves the supply and installation of underground communication conduit infrastructure from 212 Street to 216 Street and the installation of fibre optic cabling from 202A Street to 216 Street along 80 Avenue. This includes the installation of approximately 800 meters of fibre optic duct via horizontal directional drilling, with pavement restoration required at entry and exit pit locations in accordance with the Township's Subdivision And Development Servicing Bylaw 2019 No: 5382. The project includes optional work to connect nearby traffic intersection cabinets to the new fibre optic trunk cable at seven specific locations along 80 Avenue, ranging from 202A Street to 216 Street. This optional scope encompasses the supply and installation of 12F SM fibre optic cable between FOSC vaults, wall mount patch panels, accessories, fusion splices, and cable testing. Contractors must adhere to the project Erosion Control plan for water discharge and follow the Township's Archaeological Chance Find Management Guidelines if any artifacts or remains are discovered. The response deadline for this solicitation is October 14, 2026.
Township of Langley

POSTED

3 days ago

DEADLINE

in 23 days
View Details
NAICS: 237130
New
Federal
SOURCES SOUGHT ANNOUNCEMENT / INDUSTRY DAY FOR SENTINEL UTILITY CORRIDOR AT MALMSTROM AIR FORCE BASE, MONTANA
Solicitation # W9128F26SM024
The U.S. Army Corps of Engineers Omaha District is conducting market research via Sources Sought Announcement W9128F26SM024 for the Sentinel Utility Corridor project at Malmstrom Air Force Base, Montana. This initiative involves the construction of approximately 1,750 to 2,225 miles of underground communications infrastructure, including microducts, manholes, and handholes with a minimum bury depth of six feet, to support the Ground Based Strategic Deterrent system. The project includes complex civil works such as crossings of railways, rivers, and roadways, as well as environmental and cultural support, including Supplemental Environmental Impact Statements and coordination with Tribal Cultural Specialists. The estimated magnitude for the overall effort is between 1.4 billion and 2.0 billion dollars, with incremental funding expected from fiscal year 2029 through approximately 2033. The government intends to utilize a Progressive Design-Build Other Transaction Agreement under 10 U.S.C. Section 2808a, employing a Qualifications Based Selection process that prioritizes team composition, past relevant experience, and innovative problem-solving over price. Interested firms under NAICS 237130 are requested to submit an industry questionnaire and a capability statement not exceeding 12 pages by the response deadline of September 24, 2026. Awardees must be registered in SAM.gov and comply with Davis-Bacon labor laws, OSHA, and EM 385-1-1 safety requirements. The acquisition strategy emphasizes a collaborative, flexible approach to manage risks associated with Montana's specific construction seasons and stringent environmental and cultural resource protections.
W071 Endist Omaha

POSTED

4 days ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS