Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

TD2259242 Springville Ranch Idle Pole Removal Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The TD2259242 Springville Ranch Idle Pole Removal Project, managed by the State Water Resources Control Board and Southern California Edison, involves the removal of two specific poles, 5020347E and 5022801E, along the Idle Springfield-Tule River 66 kV sub-transmission line. The work is located in Tulare County, California, at two distinct sites relative to Highway 190, specifically 40 feet to the west at coordinates 36.136979, -118.796220 and 370 feet to the east at coordinates 36.135925, -118.793260. This project is classified as maintenance of an existing electrical facility with no expansion of use, qualifying it for a categorical exemption under section 15301 of the California Public Resources Code. The project will result in temporary environmental impacts to wetland habitats and stream channels due to equipment staging and the pole removal process. Administrative oversight includes primary contact Shawn Agarwal, an Engineering Geologist, and Robert LeMoine, Director of Environmental Services. While the technical scope and environmental exemptions are detailed, the available documentation does not specify the contract value, pricing schedules, or specific performance timelines.

General Info

Removal of two idle poles in Tulare County by SCE and State Water Board.

Agency

California → SWRCB, Division of Water Quality

NAICS

237130 - Power and Communication Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for Springfield Ranch Idle Pole Removal Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → SWRCB, Division of Water Quality
Contacts2 people available
OfficeN/A
Organization / Agency
California → SWRCB, Division of Water Quality
Office AddressN/A
Contacts
Shawn AgarwalEngineering Geologist
Robert LeMoineDirector of Environmental Services

Full Description

Show more
The purpose of the Project is to remove two poles (Poles 5020347E and 5022801E) along the Idle Springville-Tule River 66 kV sub-transmission line. The Project will result in temporary impacts to stream channel and wetland habitat from pole removal and equipment staging.

Similar Contracts

Same NAICS industry code

NAICS: 237130
New
Kittrell Job Corps Center-12 Strand Fiber Optic Replacement- Bldg 2, Bldg 3, Bldg 4
Solicitation # kittrell-job-corps-center-12-strand-fiber-optic-replacement-bldg-2-bldg-3-bldg-4
Covenant Learning Solutions, operator of the Kittrell Job Corps Center in North Carolina, is soliciting sealed bids for the replacement of 12-strand aerial fiber optic cables and associated connectors between Buildings 2, 3, and 4. The contractor is responsible for providing all labor, materials, equipment, and supervision to install outdoor-rated fiber optic cable along existing aerial pathways and terminate them into existing network switches. A critical requirement of this project is that the existing network service must remain fully operational without interruption until the owner authorizes the final switch-over. The contractor must also provide a construction timeline for approval during a pre-construction meeting and adhere to standard work hours of 8:00 AM to 3:00 PM, Monday through Friday. The project requires strict adherence to industry standards, local codes, and manufacturer specifications regarding cable support and bend radius. Acceptance is contingent upon successful Optical Loss Testing, OTDR testing, continuity testing, and polarity verification, as well as the submission of a complete closeout package with as-built documentation. Bidders must hold a valid North Carolina General Contractor license and maintain all necessary Builder's Risk and Liability insurance. Proposals must be submitted via email to Rachelle Judkins by September 30, 2026, and must include a completed Mandatory Bid Document. Payment will be issued as a single lump sum upon project completion, provided all required purchasing documentation is submitted.
Covenant Learning Solutions operator of Kittrell Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in 14 days
View Details
NAICS: 237130
New
SLED
Repair, Maintenance, Replacement, Refurbishment, Installation, Testing, And Inspection Of Embedded Piping And Associated Piping Systems In Hydroelectric And Other Related Facilities
Solicitation # 10213669
The California Department of Water Resources is soliciting bids for as-needed repair, maintenance, replacement, refurbishment, installation, testing, and inspection of embedded piping and associated systems within the State Water Project. The scope of work supports 29 hydroelectric power and pumping plant facilities, focusing on water, air, and oil piping, as well as control wiring conduits typically ranging from 2 to 12 inches in diameter. The anticipated contract term is three years with an option for three additional one-year renewals. Performance will take place across several field divisions, primarily in Oroville, Byron, and Gustine, with occasional work in Bakersfield and Pearblossom. The contract will be awarded to the lowest responsible bidder meeting all specifications. Key requirements for bidders include registration as a Public Works Contractor with the Department of Industrial Relations, ASME Pressure Piping Certification, and the submission of a 10 percent bidder's bond. Additionally, a minimum 3 percent commitment to the Disabled Veteran Business Enterprise program is mandatory. Bidders must provide a Quality Assurance/Quality Control program, an Injury and Illness Prevention Program, and three customer references from the last five years. Payment is based on hourly rates for various labor classifications, with purchased materials and subcontracted work invoiced at cost plus 15 percent. Hourly rates are subject to escalation on July 1 of 2027, 2028, and 2029 based on the US Department of Labor Employment Cost Index. Bids are due by September 28, 2026, and must be submitted as both a hardcopy and an electronic version on a USB drive under sealed cover. Final project deliverables include a project schedule and a comprehensive final report documenting all work performed.
Department of Water Resources

POSTED

1 day ago

DEADLINE

in 13 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS