Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Kern County

NAICS

221117 - Biomass Electric Power GenerationView NAICS

Place of Performance

170th Street West and Rosamond Boulevard, CA, 93560

Set-Aside

NONE

Documents

(11)

Euismod Energy Storage Project Notice of Completion

PDFnotice-of-completion

Euismod Energy Storage Project Draft Environmental Impact Report Volume 4 Appendices

PDFdeir

Euismod Energy Storage_DEIR_Volume 3

PDF

Euismod Energy Storage Project DEIR Notice of Completion

PDFdeir-noc

Euismod Energy Storage Project Draft Environmental Impact Report Volume 1

PDFdeir

Euismod Energy Storage Project Draft Environmental Impact Report Notice of Availability

PDFnotice-of-availability

CDFW Comment on Euismod Energy Storage Project NOP 2025120791

PDFcomment

Euismod Energy Storage Project Notice of Preparation (NOP) December 2025

PDFpresolicitation

Euismod Energy Storage Project Draft Environmental Impact Report Volume 2

PDFdeir

Euismod Energy Storage Project DEIR Volume 5 Appendices K1 to L

PDFenvironmental-impact-report

2025120791 NAHC Comment on Euismod Energy Storage Project

PDFcomment

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Kern County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Kern County
Office AddressN/A
Contacts
Keith AlvidrezSupervising Planner

Full Description

Show more
The proposed Euismod Energy Storage Project is a battery energy storage system (BESS) facility with associated infrastructure, which will use lithium-ion batteries and ancillary equipment to store approximately 1, 150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid, to be supplied back as needed, on an approximate 120-acre proposed project site in the unincorporated area of southeastern Kern County, California. The proposed project includes land-use entitlement request for a Zone Change Case (ZCC), Conditional Use Permits (CUPs), Zone Variance (ZV), and Nonsummary Street Vacations (NSVs) from the Kem County Planning & Natural Resources Department.

Similar Contracts

Same NAICS industry code

NAICS: 221117
SLED
PA-2500075 (C)
Solicitation # PA-2500075 (C)
San Joaquin County has initiated a conditional use permit process for the construction and operation of a manure anaerobic digestion facility on an existing 78.8-acre dairy property in Manteca, California, situated on a 2.9-acre portion of the site. The project involves installing two above-ground concrete digesters, each measuring 40 feet wide by 180 feet deep and approximately 12.5 feet high, with a rubber bladder lining and a concrete base, to process dairy manure wastewater pumped from existing lagoons approximately 100 yards away. Biogas produced from the digestion process will be upgraded to renewable natural gas (RNG), compressed, and loaded onto specialized gas trucks for offsite distribution, with an estimated monthly volume of 12 truck trips once operational. A third external bladder will serve as emergency methane gas containment, eliminating the need for a combustion flare. The project aligns with renewable energy objectives under the biomass category and is expected to achieve a 29% reduction in greenhouse gas emissions compared to a 2002–2004 baseline, in compliance with San Joaquin Valley Air Pollution Control District’s Best Performance Standards. Emissions are required to remain below thresholds of 10 tons per year for NOx and 0.1 tons per year for PM2.5, with adherence to CEQA, the California Building Code, the California Energy Code, and the SJVAPCD Order R5-2010-0130. The facility is subject to rigorous environmental review under the California Environmental Quality Act and must comply with multiple regulatory frameworks, including water quality standards from the Central Valley Regional Water Quality Control Board, noise ordinances under San Joaquin County Development Code Chapter 9-404, and mitigation obligations under the San Joaquin County Multi-Species Habitat Conservation and Open Space Plan due to impacts on biological resources. Inspections and compliance verification are conducted on-site by the lead agency, San Joaquin County Community Development Department, in coordination with the SJVAPCD and other regulatory bodies. Administrative acceptance of the permit is handled through county offices in Stockton, with no formal contract type or financial terms outlined since this is a regulatory permitting action, not a federal procurement. The solicitation number PA-2500075 (C) relates to the Conditional Use Permit application, with submissions due by June 26, 2026, through the San Joaquin Online
San Joaquin County

POSTED

2 months ago

DEADLINE

N/A
View Details
Euismod Energy Storage Project by Euismod… | CLEATUS