Cabin Creek Biomass Facility Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Cabin Creek Biomass Facility Project, identified by project number PLN25-00298, is located at the Eastern Regional Materials Recovery Facility and Transfer Station at 900 Cabin Creek Road in Truckee, California. Managed by Placer County, the project focuses on the conversion of sustainably sourced woody biomass into biochar using a thermal conversion pyrolysis process. This operation utilizes modular, transportable kilns, each with a 10 cubic yard capacity, designed to produce biochar with no visible emissions and minimal particulate and volatile organic compound emissions. The project is positioned as a technological advancement over previous analyses, offering benefits to climate change, forest management, organic processing, transportation, and air quality. The facility's infrastructure includes an 11,000 square-foot two-story structure to house emissions control and power generating equipment, with additional onsite improvements to support operations. The scope also encompasses the construction of a two-megawatt wood-to-energy biomass facility utilizing gasification technology. The project has undergone environmental review pursuant to the California Environmental Quality Act, resulting in a certified Environmental Impact Report and a Notice of Determination. Administrative and environmental filing fees have been processed, and the project is overseen by the Placer County Community Development Resource Agency.

General Info

Placer County project converting woody biomass into biochar and energy in Truckee, California.

Agency

California → Placer County

Place of Performance

Truckee, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Placer County
Contacts2 people available
OfficeN/A
Organization / Agency
California → Placer County
Office AddressN/A
Contacts
Meghan SchwartzSenior CDRA Technician
Dylan VandemarkProject Manager

Full Description

Show more
The project would use modular, transportable kilns, each 10 cubic yards in size, to convert woody biomass into biochar through a thermal conversion (i.e., pyrolysis) process. Through this process, shredded sustainably sourced biomass would be loaded into kilns and heated to high temperatures under constant vacuum to initiate the thermal conversion. This results in the production of biochar with no visible emissions and minimal particulate and volatile organic compound (VOC) emissions. This technology is an advancement over the technology analyzed in the certified EIR and it includes benefits to Air Quality, Transportation, Forest Management and Organic Processing, Climate Change, and Technology. Project #: PLN25-00298

Similar Contracts

Same NAICS industry code

NAICS: 221117
SLED
Euismod Energy Storage Project by Euismod Project LLC and Euismod Project I, LLC.
Solicitation # PP26401
The Euismod Energy Storage Project, managed by Euismod Project LLC and Euismod Project I, LLC under solicitation PLN25-00046, involves the development of a battery energy storage system (BESS) facility in southeastern Kern County, California. The project will utilize lithium-ion batteries to store approximately 1,150 megawatts (MW) or 9,200 megawatt-hours (MWh) of electricity from the regional grid on a 120-acre site. Infrastructure includes battery energy storage arrays, collector substations, SCADA systems, microwave communications towers, O&M buildings, and SCE tie-line and substation infrastructure. The project requires several land-use entitlements from the Kern County Planning and Natural Resources Department, including a Zone Change Case, Conditional Use Permits, Zone Variance, and Nonsummary Street Vacations. The project is subject to rigorous environmental and safety standards, including compliance with the California Environmental Quality Act (CEQA), OSHA standards, and NFPA 70E for electrical work. Key operational requirements include the implementation of a Storm Water Pollution Prevention Plan (SWPPP) and adherence to NFPA 72 for fire alarm system testing. Construction is expected to employ approximately 150 onsite workers utilizing union labor with wages meeting or exceeding IRS prevailing wage standards. Environmental reviews have highlighted potential impacts on aesthetics, air quality, biological resources, and wildfire risks, while specific mandates are in place for the protection of tribal cultural resources and the handling of human remains according to State Health and Safety Code Section 7050.5.
Kern County

POSTED

11 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS