This Solicitation opportunity from Florida was posted on November 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation 26-8700 is a construction project for the repair and restoration of Boardwalks 1 and 2, as well as Outlooks 1 and 2, at Freedom Park in Florida. The scope of work includes replacing deteriorated boardwalk decking with IPE wood or equivalent, replacing damaged structural supporting timber, fasteners, and hardware, and repairing or installing new pilings and support beams. Technical requirements include the use of 5500 psi Type IV Portland Cement for concrete repairs and the installation of floating turbidity barriers and standard integral pile jackets. The project is subject to strict environmental constraints regarding mangrove protection and must comply with FDOT and ASCE standards, as well as Florida Statute 255.20 regarding the use of Florida-produced lumber and timber.
The contract has an anticipated budget of $1,300,000, which includes an Owner's Allowance of $198,120 for unforeseen conditions. Award will be granted to the lowest responsive and responsible bidder based on the base bid and selected alternates. The successful contractor must provide payment and performance bonds for 100% of the contract amount and adhere to a completion timeline of 134 calendar days from the Notice to Proceed. Bidders must be enrolled in the E-Verify program and submit a comprehensive bid package including a 5% bid bond and various certifications. Work is generally limited to 7:00 a.m. to 7:00 p.m., Monday through Friday. There is no set-aside status specified for this solicitation.
General Info
Repair and restore Freedom Park boardwalks and outlooks for $1.3 million within 134 days.
PDF, High priority: read this first1 page · amendment
HighAI Summary for Addendum #26-8700 – Freedom Park Boardwalk Repairs: Issued November 5, 2026, by Procurement Manager Olivia Puga, this addendum modifies the solicitation for Freedom Park Boardwalk Repairs (Boardwalks 1 & 2). The primary change is an extension of the bid opening date from November 6, 2026, to Thursday, November 13, 2026, at 3:00 PM.
PDF
PDF, High priority: read this first2 pages · amendment
HighAI Summary for Addendum #2 - Solicitation #26-8700 Freedom Park Boardwalk Repairs: Issued November 5, 2026, by Procurement Manager Olivia Puga, this addendum provides clarifications and revisions for Solicitation #26-8700 regarding Freedom Park Boardwalk Repairs. It addresses several bidder questions (Q16-26) concerning scope of work, pile jackets, environmental restrictions, and shoring. Key changes include the replacement of the Scope of Work with Rev 1, the update of Exhibit M repair plans to the 10.30.26 version, and the addition of Pre-Bid Meeting sign-in sheets.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum #3: This document is Addendum #3, providing factual updates or modifications to a procurement solicitation.
XLSX
XLSX, High priority: read this first3 pages · bid-schedule
HighAI Summary for Bid Schedule 26-8700: Freedom Park Boardwalk Repairs: A detailed bid schedule for project 26-8700, Freedom Park Boardwalk Repairs (Boardwalks 1 & 2). The document outlines specific line items for pile jackets, turbidity barriers, concrete repairs, and timber work across Boardwalk 1, Outlook 1, Outlook 2, and Boardwalk 2, including an Owner's Allowance of $198,120.
XLSX
XLSX, High priority: read this first3 pages · bid-schedule
HighAI Summary for Bid Schedule 26-8700: Freedom Park Boardwalk Repairs: A detailed bid schedule for the Freedom Park Boardwalk Repairs (Boardwalks 1 & 2), project 26-8700. The document outlines specific line items for mobilization, pile jackets, turbidity barriers, concrete repairs, and asphalt replacement across Boardwalk No. 1, Outlook No. 1, Outlook No. 2, and Boardwalk No. 2. It includes an Owner's Allowance of $198,120 and instructions for bulk pricing on pile jackets.
PDF
PDF, High priority: read this first7 pages · purchase-order-terms-and-conditions
HighAI Summary for Collier County Purchase Order Terms and Conditions Rev.3: This document outlines the terms and conditions for purchase orders issued by Collier County, version Rev.3. It covers offer acceptance, inspection, shipping, payment terms, delivery schedules, changes, warranties, statutory conformity, advertising restrictions, and indemnification. The document establishes the contractual framework between the County and vendors, including obligations, rights, and remedies related to goods and services procurement.
PDF
PDF, High priority: read this first20 pages · itb
HighAI Summary for Collier County Solicitation 26-8700: Freedom Park Boardwalk Repairs: Construction Invitation to Bid (ITB) issued by the Collier County Board of County Commissioners for the repair of Freedom Park Boardwalks 1 & 2. The project has an anticipated budget of $1,300,000 with a bid submission deadline of November 6, 2026. The document specifies a non-mandatory pre-bid conference on October 20, 2026, requires a 5% bid bond, and mandates a completion timeline of 134 calendar days from the Notice to Proceed.
PDF
PDF, High priority: read this first13 pages · itb
HighAI Summary for Construction Bid Instructions Version 1 - Collier County ITB: This document is the Construction Invitation to Bid (ITB) issued by Collier County Board of County Commissioners Procurement Services Division. Version 1 outlines the purpose to obtain bids from qualified contractors, definitions of key terms, instructions for submitting bids electronically, bid deposit requirements including a 5% bid bond, procedures for questions and addenda, and signing requirements for bids. It emphasizes compliance with all provisions and the official communication channel for clarifications. The document serves as a primary solicitation with detailed bid preparation and submission instructions.
PDF
PDF, High priority: read this first92 pages · contract-document
HighAI Summary for Construction Services Agreement 2025 Template with Exhibits: This document is a Construction Services Agreement template for Collier County, Florida, intended for use in public works projects. It outlines the contractual relationship between the County (Owner) and the Contractor, including contract documents, scope of work, contract amount, bonds, and contract time with liquidated damages. The agreement mandates compliance with grant requirements and specifies performance and payment bond conditions. It establishes the commencement date, substantial completion, and final completion timelines, emphasizing that time is of the essence. The document includes provisions for Owner's Allowance and surety obligations, ensuring the Contractor's adherence to project specifications and legal requirements. This version is a template with placeholders for project-specific details and exhibits.
PDF
PDF, High priority: read this first2 pages · specifications
HighAI Summary for Exhibit N - EHS Contractor Requirements Master 2021: This document outlines the Environmental, Health and Safety (EHS) requirements for all BCC Construction Projects. It specifies compliance with governmental regulations (OSHA, EPA, etc.), mandatory safety equipment, reporting requirements, and the necessity of site-specific safety, security, and environmental plans. It also details requirements for working in rights-of-way and the safeguarding of construction sites.
PDF
PDF, High priority: read this first43 pages · specifications
HighAI Summary for Freedom Park Boardwalk Repair Plans - Exhibit M: Technical design specifications and general notes for the Freedom Park Boardwalk repairs for Collier County Public Services Division. Dated August 29, 2025, the document outlines material requirements (IPE Wood, Class IV concrete), construction constraints regarding mangrove protection, utility coordination, and compliance with FDOT and ASCE standards.
PDF
PDF, High priority: read this first21 pages · specifications
HighAI Summary for Freedom Park Boardwalk Repair Plans Phase I Final Submittal: This document appears to be the final submittal of repair plans for the Freedom Park Boardwalk Phase I, dated October 30, 2026. While the provided content is largely unreadable/encoded, the filename identifies it as Exhibit M, containing critical technical plans and specifications for a construction project.
XLSX
XLSX, High priority: read this first3 pages · bid-schedule
HighAI Summary for Freedom Park Boardwalk Repairs Bid Schedule 26-8700 Rev1: A detailed bid schedule (Rev1) for the Freedom Park Boardwalk Repairs project (26-8700), covering Boardwalks 1 & 2 and Outlooks 1 & 2. The document specifies quantities and units for items including pile jackets, turbidity barriers, concrete repairs, and timber railing, and notes a $198,120 Owner's Allowance for unforeseen conditions.
PDF
PDF, High priority: read this first1 page · sow
HighAI Summary for Freedom Park Boardwalk Repairs Phase 1 - Scope of Work (#26-8700): Scope of Work for project #26-8700 regarding the repair and restoration of Freedom Park Boardwalks 1 and 2. The project involves replacing deteriorated decking, structural supporting timber, fasteners, hardware, and damaged pilings/support beams as per plans and specifications.
PDF
PDF, High priority: read this firstsow
HighAI Summary for Freedom Park Boardwalk Repairs Phase 1 - Scope of Work (Rev1): Scope of Work Revision 1 for project #26-8700, detailing construction services for the repair and restoration of Freedom Park Boardwalks 1 & 2 and Outlooks 1 & 2, including decking, structural timber, fasteners, and piling repairs.
PDF
PDF, Low priorityother
LowAI Summary for Collier County Solicitation 26-8700 Pre-Bid Meeting Sign-in Sheet: Attendance sheet for the Pre-Bid Meeting and Site Visit dated October 20, 2026, regarding Solicitation 26-8700 for Freedom Park Boardwalk Repairs (BW 1&2). The document lists vendor representatives, company names, and contact information for attending parties.
DOCX
DOCX, Low priority1 page · other
LowAI Summary for Contact Information for Contract Development - Collier County: A template form used by the Collier County Board of County Commissioners to collect contact details for both the agency and the contractor/vendor during the contract development process, including fields for construction-specific data such as liquidated damages and completion timelines.
The project includes construction-related services for the repair and restoration of boardwalks 1-2. The repairs include the replacement of the existing deteriorated boardwalk decking, replacement of all damaged boardwalk structural supporting timber and members including all fasteners and associated hardware as per the plans and specifications, and the replacement of all damaged pilings and support beams including the installation of new pilings as needed. The contractors are required to become familiar with the location of the project and the working environmental conditions. Addendum #1: Addendum #1 Attachments: Addendum_#1.pdf Addendum #2: Addendum #2 Attachments: Addendum_#2.pdf Addendum #3: Addendum #3 Attachments: Addendum_#3.pdf
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.