Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

D Booster Station Monitoring Wells Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Marina Coast Water District is initiating the D Booster Station Monitoring Wells Project in Seaside, California, to construct two new groundwater monitoring wells at a permitted booster pump station site. The scope of work includes site preparation, minor grading, mobilization of drilling equipment, and the installation of well casings and screened intervals tailored to site-specific hydrogeologic conditions. To mitigate noise impact on nearby residential and office buildings, portable sound walls will be utilized during drilling operations. Following construction, all disturbed areas will be restored. The primary objective of this project is to address groundwater monitoring data gaps and fulfill the district's responsibilities as a Groundwater Sustainability Agency under the Sustainable Groundwater Management Act. By expanding the monitoring network, the project will provide critical water level and quality data necessary for basin evaluation, regulatory reporting, and long-term groundwater management within the Monterey Subbasin. The project has been granted a Notice of Exemption from the California Environmental Quality Act, as it involves minor utility infrastructure and data collection activities with no significant environmental impacts.

General Info

Marina Coast Water District will install two groundwater monitoring wells in Seaside, California.

Agency

California → Marina Coast Water District

Place of Performance

Seaside, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Marina Coast Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Marina Coast Water District
Office AddressN/A
Contacts
Remleh ScherzingerGeneral Manager

Full Description

Show more
The proposed project involves the construction of two new groundwater monitoring wells at the MCWD D Booster Pump Station site, where MCWD holds an exclusive permit. Work will include site preparation, mobilization of drilling equipment, drilling, and installation of well casings and screened intervals at depths appropriate to site-specific hydrogeologic conditions. Each well will be completed for long-term groundwater level and water quality monitoring. Portable sound walls will be installed around drilling equipment to reduce noise transmission toward nearby residential areas and office buildings across the street. The purpose of the proposed project is to improve groundwater monitoring coverage within the MCWD service area in support of Sustainable Groundwater Management Act (SGMA) requirements. Installation of the proposed monitoring wells will provide additional groundwater level and water quality data needed for basin evaluation, regulatory reporting, and long-term groundwater management within the Monterey Subbasin. The proposed project is needed to address identified groundwater monitoring data gaps and to support MCWD’s responsibilities as a Groundwater Sustainability Agency (GSA) under SGMA. Accurate and reliable groundwater level and water quality data are required for informed basin management, compliance with SGMA reporting requirements, and evaluation of long-term groundwater sustainability. There are no long-term safety concerns associated with the proposed action. Temporary construction-related effects will be minimized through standard best management practices.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
International
Lytton First Nation – Berm Construction
Solicitation # 24-3028C
Solicitation 24-3028C is for the construction of the Nohomeen Recovery Berm located at the Stein Subdivision in Stryen, Lytton, British Columbia, for the Lytton First Nation. The project involves significant earthworks and the installation of a retaining wall using lock block facing units with a minimum 28-day concrete strength of 20 MPa and a specific batter of 5 degrees. Key technical requirements include the use of Type I Engineered Fill and retained backfill, both compacted to 100 percent of the maximum density per ASTM D698 standards. The scope also includes the installation of 150mm perforated PVC toe and heel drains, vertical cleanouts, rodent guards, and a clear crush chimney drain, with NILEX 4545 non-woven geotextile required at soil interfaces. The project mandates strict environmental and cultural compliance, requiring adherence to Thompson-NOXLAND Regional District Bylaws and Department of Fisheries and Oceans Land Development Guidelines. Contractors must install silt fencing prior to excavation and ensure all soil removal is conducted by a company employing a qualified cultural assist. Quality assurance is managed through the Geotechnical Engineer of Record, who must approve the subgrade and wall bearing surface before wall construction begins. Additionally, the contractor is responsible for verifying wall batter every block course and limiting the use of heavy equipment to a minimum distance of 0.75 meters from the wall face. Responses to this solicitation are due by October 22, 2026.
Lytton First Nation

POSTED

about 13 hours ago

DEADLINE

in 19 days
View Details
NAICS: 237990
New
SLED
Contract 26-2 Furnace Creek Tank Painting
Solicitation # Contract 26-1
The Womelsdorf-Robesonia Joint Authority is soliciting sealed bids for Contract 26-1, Furnace Creek Tank Metals Rehabilitation, through the PennBid online portal, with bids due by 2:00 PM on August 11, 2026. The project involves comprehensive rehabilitation of a water storage tank, including installation of a 4-inch drilled riser for static mixing, replacement of the tank ladder with safety cables, installation of a new 30-inch manway, replacement of the roof vent, and reconfiguration of the overflow discharge system to include an air gap, duckbill check valve, funnel-style reducer, and flapper valve above a concrete splashpad. All work must comply with applicable industry standards including ASTM, AWWA, OSHA, and SSPC, and materials must be delivered in original manufacturer packaging with bright-machined surfaces protected by heavy grease coatings. The contract is funded by a Penn VEST Drinking Water State Revolving Fund loan and is subject to all associated requirements. Full compliance with the Build America, Buy America Act and the American Iron and Steel provisions is mandatory, requiring all iron, steel, manufactured products, and construction materials to be produced in the United States unless a formal waiver is obtained. Each bid must be accompanied by a 10% bid bond or certified check payable to the Authority, and failure to provide one will result in bid rejection. Bidders are encouraged to contact Chief Operator Dennis Miller to arrange a site visit. The Authority reserves the right to reject any or all bids and will select the most advantageous offer based on price and technical compliance. The work is performed at the project site in Berks County, Pennsylvania, with no specified contract type, line item pricing, or electronic invoicing system outlined. Payment administration, accounting codes, and contracting officer representative details are not defined in the solicitation. Proposal submission is strictly electronic via PennBid, with mandatory attachments including non-collusion affidavits, financial statements, surety documentation, and employment compliance certifications. No small business set-asides, unique entity identifiers, or CAGE codes are required, and no formal evaluation factors or weighted scoring criteria are specified, indicating an emphasis on lowest responsible bidder principles.
Berks County

POSTED

about 20 hours ago

DEADLINE

in 18 days
View Details
NAICS: 237990
New
SLED
2026-0011
Solicitation # 48935
The Cornerstone of Centerville South Phase I Public Improvements project is a civil and electrical construction solicitation issued by the City of Centerville, Ohio, with an engineer's estimate of $4,973,490.39. The scope of work includes the installation of conduits, structures, concrete drive aprons with curbs, seeding, mulching, and a design-build electrical component. The electrical portion requires the contractor to design and build the electrical service and associated conductors, including the installation of 22 decorative light fixtures, light pole bases, and specific connector kits. All work must adhere to the Ohio Building Code, N.E.C., N.F.P.A. Standard 70, and ODOT specifications, with a project completion date set for September 30, 2027. Bids are submitted as unit price proposals via Bid Express, with a final response deadline of October 13, 2026. The selection process evaluates the lowest and best bid based on project history, available resources, financial ability, and compliance with federal, state, and local laws, including Ohio Prevailing Wage and OSHA regulations. Required financial securities include a bid bond for the full amount of the bid or a 10 percent certified check, and a 100 percent performance bond upon award. Insurance requirements specify minimum coverage of $2,000,000 for Commercial General Liability, $1,000,000 for Auto, and $1,000,000 for Workers Compensation. Contract administration is managed by Oberer Construction Managers Ltd. on behalf of the City.
City of Centerville

POSTED

about 20 hours ago

DEADLINE

in 10 days
View Details
NAICS: 237990
New
SLED
Pierpont Nuisance Sand Removal
Solicitation # P-130000901
The City of San Buenaventura is soliciting proposals for solicitation number P-130000901 to perform nuisance sand removal from City-owned portions of Pierpont Beach between San Pedro Lane and Greenock Lane. This recurring project occurs twice annually, once in May and once in November, to satisfy a legal Settlement Agreement. The scope of work involves grading, removing, and hauling excess beach sand from up to 27 beach access lanes and the frontage of up to 17 private properties. Contractors must excavate sand wedges to specified limits, ensuring they remain no deeper than 6 inches above structural footings with a slope no more than 1:1.75, and transport the material to designated deposit sites while avoiding the tidal zone. Proposals are due by October 20, 2026, at 4:00 PM PST, and must be submitted as a sealed hard copy to the Purchasing and Contracts Division in Ventura, California. The City will award the contract based on the perceived best fit and best value, evaluating proposals on a scale of 0.0 to 15.0. Key requirements include compliance with Cal-OSHA safety standards, the California Manual on Uniform Traffic Control Devices, and a Biological Resource Assessment. Additionally, state prevailing wages for Ventura County apply to all workers. While a faithful performance bond is not required, a bid security of at least 10 percent may be requested, and a 5 percent credit is available for qualified Small Local Businesses.
City of San Buenaventura

POSTED

about 23 hours ago

DEADLINE

in 17 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS