Site Clearing & Earthwork

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

Sacramento, CA, 95814, USA

Set-Aside

NONE

Documents

This scope was carved out of 04-2J88U4.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 29 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs clearing, grubbing, and structure excavation for prime contractors on Caltrans bridge and drainage projects in Napa County. Executes clearing and grubbing, roadside clearing, and structure excavation for culverts. Delivers a cleared site and excavated foundations for structures.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA063
The U.S. Army Corps of Engineers is soliciting construction services for an interim remedial action at the Nelson Tunnel Superfund Site near Creede, Colorado. The primary objective of this project is to mitigate the risk of uncontrolled releases of mine-impacted water from impounded mine pools. The selected remedy involves the construction of a new bypass adit south of the Nelson Tunnel to bypass the portal pool, the rehabilitation of the Nelson Tunnel from the bypass connection to the bulkhead location, and the installation of flow control bulkheads within both the Nelson Tunnel and the Commodore 5 level. All work must comply with CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and specific geotechnical baseline reports. This is an unrestricted solicitation open to both large and small businesses, utilizing a firm-fixed-price contract and a Best Value Trade-Off award process. Proposals will be evaluated based on project management approach and schedule, past performance, key personnel, and small business participation, with a minimum small business participation goal of 35% of the total contract value. Technical requirements include strict adherence to the National Electrical Code and MSHA standards, and the use of NETA Level III or NICET certified technicians for electrical testing. Offerors must be registered in the System for Award Management with NAICS code 237990 and submit their proposals via the PIEE Solicitation module in two distinct volumes.
W071 Endist Omaha

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 4 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 236220
New
SLED
Building Construction In Sonoma County In And Near Santa Rosa At 224 Lincoln Street And 3251 Brickway Boulevard
Solicitation # 04-2Q5804
The California Department of Transportation has issued solicitation 04-2Q5804 for building construction projects located at 224 Lincoln Street and 3251 Brickway Boulevard in Santa Rosa, California. The primary scope of work involves the removal of existing electrical service and distribution systems at the Santa Rosa Maintenance Station and the installation of complete, operational electrical systems. Key deliverables include the provision of temporary construction power, heat, and lighting, as well as the execution of testing and commissioning. The contractor is required to maintain as-built drawings and provide comprehensive product data and shop drawings. Technical requirements mandate strict adherence to NFPA 70, ANSI, and IEEE standards, with specific packaging and marking protocols for electrical devices and wood structural panels. Quality assurance involves the use of qualified testing agencies and factory-authorized representatives, with mandatory infrared scanning of switches and circuit breakers after substantial completion. The project also requires compliance with 2008 ADA Standards for Accessibility, Buy America requirements for steel and iron, and specific cybersecurity hardening guides for the system. Administrative requirements include a unit price bid submission with a security deposit of at least 10 percent. Bidders must provide certifications for Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation, with specific deadlines for commitment and confirmation. The contract emphasizes labor compliance through prevailing wage rates as determined by the California Department of Industrial Relations. Performance milestones include the energization of the Battery Energy Storage System within two weeks of delivery to the site.
Commercial and Institutional Building Construction

POSTED

about 3 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Napa County Near Calistoga At No Name Creek Bridge
Solicitation # 04-2J88U4
The California Department of Transportation has issued solicitation 04-2J88U4 for construction work on the State Highway in Napa County near Calistoga at the No Name Creek Bridge. With an estimated project cost of 880,000 USD, the scope of work focuses on bridge scour repair, including the use of shotcrete for scour holes and partially grouted rock slope protection. Additional requirements include the installation of a Midwest Guardrail System, culvert cleaning, structure excavation, and extensive landscaping and erosion control involving hydroseeding, fiber rolls, and soil amendment. The project also necessitates the removal of existing guardrails and thermoplastic traffic stripes, which are handled as hazardous waste. Performance is subject to strict environmental and regulatory constraints, including a restricted work window within creek channels from June 15 to October 15. Contractors must comply with prevailing wage laws and meet a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Technical standards require that temporary concrete barriers be fabricated at authorized facilities and that local materials meet specific pH and lead concentration limits. Administrative requirements include the submission of a baseline schedule, weekly working days reports, and electronic payroll records via LCPtracker Pro. Bids are due by December 15, 2026, and must be submitted on a unit price basis.
Highway, Street, and Bridge Construction

POSTED

about 3 hours ago

DEADLINE

in 28 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS