Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site

Open
W9128F27RA063Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The U.S. Army Corps of Engineers is soliciting construction services for an interim remedial action at the Nelson Tunnel Superfund Site near Creede, Colorado. The primary objective of this project is to mitigate the risk of uncontrolled releases of mine-impacted water from impounded mine pools. The selected remedy involves the construction of a new bypass adit south of the Nelson Tunnel to bypass the portal pool, the rehabilitation of the Nelson Tunnel from the bypass connection to the bulkhead location, and the installation of flow control bulkheads within both the Nelson Tunnel and the Commodore 5 level. All work must comply with CERCLA, the National Oil and Hazardous Substances Pollution Contingency Plan, and specific geotechnical baseline reports. This is an unrestricted solicitation open to both large and small businesses, utilizing a firm-fixed-price contract and a Best Value Trade-Off award process. Proposals will be evaluated based on project management approach and schedule, past performance, key personnel, and small business participation, with a minimum small business participation goal of 35% of the total contract value. Technical requirements include strict adherence to the National Electrical Code and MSHA standards, and the use of NETA Level III or NICET certified technicians for electrical testing. Offerors must be registered in the System for Award Management with NAICS code 237990 and submit their proposals via the PIEE Solicitation module in two distinct volumes.

General Info

US Army Corps seeks construction services for remedial action at Nelson Tunnel.

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Approximately one (1) mile north of the town of Creede in Mineral County, Colorado, NE, 81130

Set-Aside

NONE

Documents

11
PDF, High priority: read this firstwage-determination
High
DOCX, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstrfp
High
PDF, Low priorityspecifications
Low
PDF

Read all 11 documents

Due in 51 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 51 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 11 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail and phone
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts1 person available
OfficeOMAHA, NE, 68102-4901, USA

Full Description

Show more
NOTE: SOLICITATION W9128F27RA063 is associated with Pre-Solicitation Notice W9128F27RA056.The project is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead at the Nelson Tunnel superfund site in the San Juan Mountains near Creede, CO. PROJECT DESCRIPTION: Construction Services for the Nelson Tunnel/Commodore Waste Rock Site (Nelson Tunnel Site or Site), the focus of the interim remedial action (IRA), consists of an abandoned underground hard rock mine and drainage tunnel with several shafts, crosscuts and drafts branching off the main tunnel. The remedial action objective of the RA is to reduce the likelihood of a large, uncontrolled release of mine-impacted water from mine pools impounded within the Nelson Tunnel. The selected alternative for the Nelson Tunnel Interim Record of Decision (IROD) is to construct a bypass adit that connects into Nelson Tunnel at a sufficient distance from the surface to allow for installation of a flow-through hydraulic bulkhead within Nelson Tunnel.The IROD selected remedy is Alternative 4, Drive New Adit to Intersect Nelson Tunnel, Tunnel Rehabilitation, Install Bulkhead in Nelson Tunnel and Flow Control Structure in Commodore 5 level and include the following remedial components. Installation of a new adit south of Nelson Tunnel, to bypass the Nelson Tunnel Portal Pool. Rehabilitation of Nelson Tunnel from the bypass adit connection to the location where bulkhead construction is planned. Installation of a flow control bulkhead in Nelson Tunnel to protect against a sudden uncontrolled release through Nelson Tunnel. Installation of an accessible bulkhead flow control structure in the Commodore 5 level to protect against a sudden uncontrolled release through this level. The solicitation is UNRESTRICTED AND OPEN TO BOTH LARGE AND SMALL BUSINESS PARTICIPATION. The acquisition approach for this project will be Best Value Tradeoff following the Federal Acquisition Regulation (FAR) Part 15 procedures. All contractors must be registered and have an active and verified account in the System for Award Management (SAM) in order to receive a contract award from any DoD activity. Contractors may access the Internet site at: https://www.sam.gov/ to register and/or obtain information about the SAM program. Contractors must ensure that the applicable NAICS code 237990 is included in their profile prior to submission of offers.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Federal
Construct Interim Remedial Action (IRA) for the Nelson Tunnel Superfund Site
Solicitation # W9128F27RA056
The USACE Omaha District intends to issue Request for Proposal W9128F27RA056 in November 2026, with a planned proposal due date in January 2027. This unrestricted solicitation, open to both small and large businesses, seeks construction services for the Interim Remedial Action at the Nelson Tunnel Superfund Site located near Creede, Colorado. The project, estimated between 15 million and 30 million dollars, aims to prevent the uncontrolled release of mine-impacted water from an abandoned underground hard rock mine. The scope of work includes the installation of a new bypass adit south of the Nelson Tunnel, rehabilitation of the tunnel from the bypass connection to the bulkhead location, the installation of a flow control bulkhead within the Nelson Tunnel, and the construction of an accessible bulkhead flow control structure in the Commodore 5 level. The contract will be awarded based on a best-value approach, evaluating technical merit and price. Technical evaluation factors include project management approach and schedule, past performance, key personnel, and small business participation, with technical factors rated adjectivally and price assessed for reasonableness and realism. Performance is expected to begin within 10 days of the Notice to Proceed and must be completed within a duration not exceeding 655 days. Interested parties must be registered in SAM.gov with NAICS code 237990 and registered in the Procurement Integrated Enterprise Environment (PIEE) as a Proposal Manager to receive documents and submit proposals. Site visits are subject to safety briefings and specific equipment requirements for underground entry.
W071 Endist Omaha

POSTED

about 5 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237990
New
Federal
MACH1 AOI FA8903-27-OT-001 Horizontal Airfield Infrastructure
Solicitation # FA8903-27-OT-001
Solicitation FA8903-27-OT-001 is an Area of Interest for an Other Transaction Agreement (OTA) under 10 U.S.C. § 2808a, managed by the Department of Defense. The scope focuses on the planning, design, engineering, alteration, repair, and physical construction of horizontal airfield infrastructure. This includes runways, taxiways, aircraft parking aprons, and associated visual and electrical systems such as lighting and automated control systems. Additionally, the scope covers civil, drainage, and safety infrastructure, including stormwater networks, perimeter security fencing, and subsurface utility corridors. All work must adhere to Unified Facilities Criteria (UFC) and Air Force Corporate Standards, with a strong emphasis on Anti-Terrorism/Force Protection standards. The project is structured into two Lines of Effort: LOE 1 focuses on design and planning, while LOE 2 covers final design and physical construction under negotiated commercial terms. The award process is multi-phased, beginning with a Phase 1 Solution Brief, which is a five-page white paper due by January 15, 2027. Evaluation criteria for Phase 1 include relevance to the AOI, the merit of the constructability concept, company viability, and schedule risk. To qualify, companies must demonstrate a history of completing at least three airfield pavement projects on DoW or FAA Part 139 installations within the last 10 years, each valued over $10 million. Performance will take place at DoW installations or commercial FAA Part 139 airports, primarily in the San Antonio, Texas area.
FA8903 772 Ess Pk

POSTED

about 5 hours ago

DEADLINE

in about 2 months
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 237120
New
Federal
WH Ford RTC Fueling System Repairs
Solicitation # W9128F27RA054
Solicitation W9128F27RA054 is a firm-fixed-price, design-build project for fueling system repairs at the Wendell H. Ford Regional Training Center in Kentucky, managed by the Omaha District of the U.S. Army Corps of Engineers. This procurement is restricted to 100 percent small businesses under NAICS code 237120. The scope of work involves comprehensive upgrades to two 10,000-gallon above-ground storage tanks, including upgrading the automatic tank gauging system from Veeder Root TLS-350 Plus to TLS-450, installing an emergency fuel shutoff station and leak detection equipment, and repairing concrete pavement and splash blocks. Additional requirements include recoating fuel system canopies and piping, replacing tank vents, improving grounding systems, and modifying tank access platforms. Proposals are due by December 21, 2026, at 14:00 CST and must be submitted in two separate volumes: a technical volume and a pricing volume. The government will utilize the Lowest Price Technically Acceptable (LPTA) source selection process, evaluating offerors on specialized experience in military base construction, a logical Gantt chart for a 410-calendar day period of performance, and a detailed technical approach. Work must adhere to EM 385-1-1 safety standards, UFC, NFPA, and EPA regulations. The successful contractor must commence work within 10 days of the Notice to Proceed, with a final completion deadline of June 18, 2027.
Oil and Gas Pipeline and Related Structures Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 541990
New
Federal
Vandenberg SFB Tank Inspection
Solicitation # W9128F27QA002
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 541990. The project involves performing comprehensive internal inspections of Department of Defense aboveground storage tanks (AST) at Vandenberg SFB, California, specifically focusing on Facility 1702. The scope of work includes the removal, disposal, or transfer of remaining fuel, tank cleaning, replacing wiper and pan penetration seals, and conducting API 653 internal inspections. All work must adhere to strict industry and military standards, including API 650, API 653, UFC 3-460-01, and UFC 3-460-03. The government will award the contract based on best value, evaluating offerors on technical capability, specifically the certifications of the offered API 653 inspector, relevant experience with fuel tank draining and cleaning, and price reasonableness. Proposals are limited to five pages and must be submitted electronically via the PIEE Solicitation Module. Key requirements include strict adherence to installation security protocols, including NCIC and CLETS vetting for personnel, and the provision of a certified Project Manager and API 653 Inspector. Deliverables include a kick-off meeting, draft and final inspection reports, and a return-to-service letter upon successful completion.
All Other Professional, Scientific, and Technical Services

POSTED

1 day ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
Federal
Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota
Solicitation # W9128F27SM005
The U.S. Army Corps of Engineers, Omaha District, is conducting market research for two critical renovation projects at Minot Air Force Base, North Dakota, under solicitation W9128F27SM005. The first project involves the full-scale renovation of approximately 28,000 square feet within the Mission Support Facility (Building 145), with a Construction Cost Limitation of $31,923,000. The second project focuses on converting approximately 2,660 square feet of the Alert Facility (Building 1085) into a high-security Special Access Facility (SAF) and Sensitive Compartmented Information Facility (SCIF) supporting the Long-Range Stand-Off mission, with a Construction Cost Limitation of $3,503,000. This SAF requires strict adherence to Intelligence Community Directive (ICD) 705 standards for Top Secret Open Discussion, including RF shielding, acoustic engineering, and specialized standalone HVAC systems. To streamline execution, the government intends to use a non-FAR based Other Transaction (OT) Agreement under 10 USC 2808a, employing a Construction Manager at Risk (CM@Risk) delivery method. The process is divided into two phases: a preconstruction phase where the contractor acts as a consultant to bridge a 5% design gap and validate pricing, and a construction phase where the contractor assumes risk under a Guaranteed Maximum Price (GMP). Interested firms must submit their capabilities, bonding levels, and CMMC status, along with a narrative response not exceeding five pages, to the designated points of contact by December 11, 2026.
Commercial and Institutional Building Construction

POSTED

4 days ago

DEADLINE

in 24 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS