Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Show more
Solicitation W9128F27QA002 is a firm-fixed-price, non-personnel services contract set aside 100% for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under NAICS 541990. The project involves performing internal inspections on Department of Defense aboveground storage tanks (AST) at Vandenberg SFB, California. The scope of work includes the removal, disposal, or transfer of remaining fuel, tank cleaning, replacing wiper and pan penetration seals, and conducting internal inspections in accordance with API 653, API 650, and Unified Facilities Criteria (UFC) standards. Key deliverables include the provision of a certified API 653 inspector and a project manager, with specific requirements for a NACE Level II or higher investigator for bottom scanning and ultrasonic testing.
The government will award the contract based on best value, evaluating technical capability, relevant experience in fuel tank draining and cleaning, and price fairness. Proposals are limited to five pages and must be submitted electronically to the USACE Omaha District. Contractors must comply with strict installation security requirements, including identity proofing and vetting for base access. The contract structure includes priced line items for inspection services and wiper seal replacement, with an optional CLIN for the removal and disposal of excess fuel up to 2,000 gallons per purchase order. All work must adhere to federal and military safety and quality standards, including DFARS cybersecurity and labor standards.
General Info
SDVOSB contract for DoD aboveground storage tank cleaning and internal inspections at Vandenberg SFB.
PDF, High priority: read this first3 pages · amendment
HighAI Summary for Addendum to 52.212-1: This document is an addendum to FAR 52.212-1 providing specific submission instructions, required company information, and evaluation criteria for a USACE procurement. It outlines a 5-page proposal limit, requirements for inspector certifications and past performance references (specifically regarding fuel tank draining, cleaning, and API 653 inspections), and establishes a best-value evaluation based on technical capability, experience, and price.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Addendum to FAR 52.212-1 - Submission and Evaluation Instructions: This document is an addendum to FAR 52.212-1 providing specific instructions for the submission of offers and the evaluation criteria for a US Army Corps of Engineers procurement. It details required proposal information (SAM data, CAGE code), submission limits (5-page PDF via PIEE), and evaluation factors including technical capability (inspector certifications), experience (past projects involving fuel draining and tank cleaning), and price reasonableness.
PDF
PDF, High priority: read this first63 pages · sow
HighAI Summary for API 653 Out-of-Service Inspection Report Template: US Army Corps of Engineers Omaha District API 653 out-of-service internal inspection report template for petroleum storage tanks. Dated for 1 January 20XX and structured with inspection date, state regulations, previous and recommended future inspection dates, general tank information, inspection comments, findings and recommendations, mandatory and short-term repairs, calculations/drawings, 3-D analysis, checklists, and photographs. Includes placeholders for location, facility number, tank number, inspector details, and detailed deficiency documentation.
PDF
PDF, High priority: read this first6 pages · sow
HighAI Summary for Attachment A - General Installation Security Requirements: Attachment A, General Installation Security Requirements, sets base access and security compliance rules for contractor personnel on military installations. It outlines identity proofing and vetting procedures, acceptable identification documents, disqualifying background criteria, random screening authority, denial/appeal process, and prime contractor responsibilities for coordinating with installation offices. The document also notes access passes are tied to the specific person, purpose, and vehicle, and includes a statement that no additional compensation is due for compliance-related delays.
PDF
PDF, High priority: read this first1 page · contract-line-item-schedule
HighAI Summary for CLIN Schedule FY27 VAN PO 03: CLIN schedule for FY27 VAN Purchase Order 03. Includes priced line items for API Internal Tank Inspection Service at Facility 1702, wiper seal replacement, and an option CLIN for tank fuel removal/disposal with a not-to-exceed quantity of 2,000 gallons per purchase order. The schedule shows FFP terms, FOB destination, and references the PWS and attachment B.
PDF
PDF, High priority: read this first4 pages · rfq
HighAI Summary for Combined Synopsis/Solicitation RFQ W9128F27QA002: Combined synopsis/solicitation RFQ W9128F27QA002 for commercial products/services, using FAR Part 12 procedures and a 100% SDVOSB set-aside under NAICS 541990. The notice includes the solicitation overview, place and period of performance at Vandenberg SFB, CA, evaluation factors (technical capability, experience, and price), applicable FAR/DFARS provisions and clauses, and references to the CLIN schedule and PWS for FY27-VAN-PO 03.
PDF
PDF, High priority: read this first11 pages · sow
HighAI Summary for Performance Work Statement for Tank Inspections: Performance Work Statement (PWS) for Vandenberg SFB, CA, identifying a firm-fixed-price non-personnel services contract to inspect Department of Defense fuel tanks. It describes the scope, objectives, hours of operation, security/site access, key personnel, OCI concerns, suitability-for-service criteria, government-furnished items, and detailed contractor-furnished materials and equipment requirements. The document includes technical specifications for gaskets, bolts, washers, and double wiper seal/penetration seal requirements, indicating critical contract performance and inspection standards.
XLSX
XLSX, High priority: read this first19 pages · project-concept-document
HighAI Summary for Project Concept Document / PMP – Fort Indiantown Gap Fueling Upgrades: Project concept document and project management plan for DLA Energy Division project P-006858-08, dated November 2010 / 12-Nov-10. The file describes construction and repair work at Fort Indiantown Gap, PA to upgrade fueling facilities and secondary containment areas, prevent fuel releases, and comply with federal, state, and local standards. It includes business justification, project objectives, estimated costs, timeframe, impacted business areas, and review/signature sections. The document also states desired outcomes such as developing a 35% design, preparing an RFP to Fuels MATOCs, and completing work by 11-Nov-2011.
PDF
PDF, High priority: read this first11 pages · sow
HighAI Summary for PWS - Vandenberg SFB Fuel Tank Inspections (PO 03): Performance Work Statement (PWS) for a non-personnel services contract at Vandenberg SFB, CA. The scope includes cleaning, fuel removal, wiper seal replacement, and API 653 internal inspections of Department of Defense aboveground storage tanks (AST). The document specifies contractor responsibilities, technical requirements for gaskets and seals, and security/site access protocols.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for Vandenberg RFI Responses: A document containing Request for Information (RFI) questions and official responses regarding the inspection and repair of Tank 1702 at Vandenberg. Key topics include IFR specifications, wiper seal requirements, site visit policies, and technical clarifications on PWS inspections and NDE records.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Vandenberg SFB Fuel Tank Inspection Table: A table for site VAN at Vandenberg SFB, CA/USA, listing fuel tank inspection details and removal quantities. It includes inspection type, facility and local IDs, fuel type Jet A, tank capacity and dimensions, and yes/no requirements for UT, roundness survey, certified chart, and replace if R seal. It also notes gallons remaining to be stored/transferred and purchase order removal quantities. No explicit date or solicitation title is shown; filename references FY27 and PO 03.
PDF
PDF, High priority: read this first7 pages · wage-determination
HighAI Summary for Wage Determination No. 2015-5647 (California): U.S. Department of Labor Service Contract Act wage determination No. 2015-5647, Revision 29, dated 8/27/2026, for California counties of Santa Barbara. The document lists required fringe benefits and occupational wage rates across multiple labor categories, including clerical, food service, general services, health, IT, instructional, laundry, materials handling, and maintenance occupations.
PDF
PDF, Low priority49 pages · inspection-report
LowAI Summary for API 653 In-Service Inspection Report – Tank 1702: API 653 in-service inspection report for Vandenberg SFB Tank 1702, dated 21 September 2022. The document summarizes tank ownership and configuration, inspection date and inspectors, prior and recommended future inspection intervals, and general tank information. It also provides a table of contents and indicates the report includes engineering calculations, UT measurements, drawings, findings, recommendations, checklists, and photographs for an aboveground Jet A storage tank.
PDF
PDF, Low priority4 pages · inspection-report
LowAI Summary for API 653 Inspection Teleconference Briefing Template: Template for a teleconference briefing summarizing findings from an out-of-service API 653 fuel storage tank inspection. Includes inspection date placeholders, contract/task order references, recommended future inspection dates, state regulations notes, and sections for mandatory, short-term, and long-term repairs with observation, reference, recommendation, and photo placeholders.
PDF
PDF, Low priority80 pages · inspection-report
LowAI Summary for API Standard 653 Inspection Report - Tank 1702: API Standard 653 out-of-service inspection report for Tank #1702 at Vandenberg AFB, Lompoc, California, prepared by Environmental Technology, Incorporated on December 15, 2006. The report summarizes inspection results, executive findings, engineering references, tank description, and recommendations related to containment, foundation, bottom, shell, appurtenances, accessways, floating roof, and fixed roof. It highlights corrosion, coating failures, settlement findings, and remaining life evaluations, with appendices for calculations, drawings, data, checklists, and photographs.
PDF
PDF, Low priority8 pages · other
LowAI Summary for Eng_Form_6293_2024_APP_WORKSHEET: Unreadable document. The provided PDF content is only a placeholder message indicating the viewer may not be able to display this type of document, so no procurement information can be extracted.
XLSX
XLSX, Low priority6 pages · status-report
LowAI Summary for Monthly Contractors Progress Management and Status Report: Monthly contractor progress management and status report spreadsheet template. Includes an executive summary section, a status/schedule tracker with task order and inspection milestones, and a lessons learned section. The file appears to be a reporting form for tracking program progress, key accomplishments, concerns, and upcoming actions over a reporting period.
PDF
PDF, Low priority1 page · other
LowAI Summary for Return to Service Letter: Return to Service Letter for a storage tank inspection under Contract No. [XXXXX], Task Order [XX]. The letter states the tank was inspected in accordance with API STD 653, found suitable for return to service, and returned to service on the listed date. It also provides recommended future inspection dates, notes state regulation follow-up if applicable, and identifies the inspector, installation acknowledgement, and USACE fuels project manager for closeout documentation.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Vandenberg RFI Responses: A document containing responses to Requests for Information (RFI) regarding the Vandenberg project, specifically clarifying the material of the internal floating roof (aluminum honeycomb) and the availability of ladder access from the fixed roof.
PDF
PDF, Low priority2 pages · q-and-a
LowAI Summary for Vandenberg RFI Responses: A document containing Request for Information (RFI) responses and clarifications regarding tank inspections at Vandenberg. It addresses technical queries concerning IFR materials, ladder access, NDE records, and tank bottom coating requirements, including references to PWS and API 650 standards.
PDF
PDF, Low priorityq-and-a
LowAI Summary for Vandenberg RFI Responses: A document containing Request for Information (RFI) responses and clarifications regarding tank inspections and repairs at Vandenberg. It addresses technical queries on IFR materials, wiper seals, site visits, fuel disposal, and specific PWS requirements for tank bottom scanning and roundness surveys.
The purpose of Amendment 0006 is to provide updated RFI Responses and Addendum. This is a non-personnel services contract to perform inspections on Department of Defense fuel tanks. This service entails removal, disposal, transfer of remaining fuel, tank cleaning, replacing wiper seals, and providing an aboveground storage tank (AST) Inspection on tank(s) listed in Attachment B.