Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert Facility (B1085) Minot Air Force Base (MAFB), North Dakota

Open
W9128F27SM005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Minot AFB, ND, 58704, USA

Set-Aside

NONE

Documents

1
PDF, Low prioritysources-sought
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSources Sought
Posted

Sources Sought

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W071 Endist Omaha
Contacts2 people available
OfficeOMAHA, NE, 68102-4901, USA

Full Description

Show more

Sources Sought Response Form


Renovate Mission Support Facility (B145) & Repair/Renovate Conference Room (LRSO), Alert  Facility (B1085)


Minot Air Force Base (MAFB), North Dakota


Sources Sought Notice # W9128F27SM005


NOTICE TYPE: Market Research / Sources Sought


ACQUISITION AUTHORITY: 10 USC 2808a (Other Transaction Authority for Military Construction Projects)


PROJECT TITLES: FY27 Renovate Mission Support B145, MAFB, ND                                                 FY27 RENOVATE CONFERENCE ROOM (LRSO) BUILDING 1085, MINOT AFB, ND


NAICS CODE: 236220 – Commercial and Institutional Building Construction ESTIMATED VALUE: Firm Construction Cost Limitation (CCL):                         Renovate Mission Support Building 145 (CCL): $ 31,923,000                                                       Renovate Conference Room (LRSO) Building 1085 (CCL): $ 3,503,000
 


PURPOSE


By way of this Industry Outreach Questionnaire, the USACE-Omaha District intends to gauge Industry’s interest and capabilities in providing the requirement described hereunder. The Government welcomes qualifications and capability statements from all qualified entities regardless of federal construction experience or business size. The responses to this notice will be used for planning purposes for the upcoming procurement(s). This notice does not constitute a Request for Qualifications (RFQ), Request for Proposal (RFP), Request for Quotes, or Invitation for Bids (IFB). It does not guarantee the future issuance of an opportunity notice, nor does it commit the government to execute an agreement or pay for any information or administrative costs incurred in responding to this notice.



This Agency will not accept unsolicited submissions in response to this notice. All costs associated with responding will be solely at the responding party's expense. Responding parties are requested to refrain from submitting proprietary information.



Responses are to be sent via email to (POC) Phillip Wickham at Phillip.L. Sign up to see this detail and (POC) Jessica Beckman at Jessica.L. Sign up to see this detail not later than 11 December 2026 by 2:00 pm (MST)). Narratives shall be no longer than 5 pages. Email responses are required.


PROBLEM AND BACKGROUND STATEMENT:


The U.S. Army Corps of Engineers (USACE) is conducting market research on behalf Minot Air Force Base which has a requirement to address two distinct, but critical facility needs. The first is a full-scale renovation of the Mission Support Facility (Building 145), which requires significant interior, exterior, and systems modernization to continue supporting its operational function. The Mission Support Facility has a project timeline for award of the phase 1 agreement of FY26 Q3.  


The second is the need to convert an existing conference room (Building 1085) into a high-security Special Access Facility (SAF) accredited to Intelligence Community Directive (ICD) 705 standards. To streamline execution and foster innovation, the Government intends to address this suite of projects programmatically under a single Other Transaction Agreement (OTA). This approach seeks a capable partner or consortium to deliver a comprehensive design-build solution for both projects, potentially on a concurrent or closely phased schedule. The Special Access Facility (SAF) has a project timeline for award of the phase 1 agreement of FY26 Q3


The U.S. Army Corps of Engineers (USACE), Omaha District, is conducting market research on behalf of the Department of the Air Force (5th Bomb Wing / Air Force Global Strike Command) at Minot Air Force Base (AFB), North Dakota. The existing Minot AFB Alert Facility (Building 1085) requires critical renovation and spatial reconfiguration of its existing briefing, projector, and office spaces (Offices 225, 226, 227, Projector/Briefing Room 228, and a new Entry Control Vestibule, totaling approximately 2,660 SF) to establish a state-of-the-art Special Access Facility (SAF) supporting the Long-Range Stand-Off (LRSO) mission.


CurrRntly, the existing spaces fail to meet the operational, acoustic, and physical security requirements of the mission users. Furthermore, the space requires extensive modernization to achieve full compliance with Intelligence Community Directive / Intelligence Community Standard (ICD/ICS 705) for Classified Open Discussion (OD) up to the Top Secret (TS) level. To resolve these operational shortfalls within an accelerated timeline, USACE intends to execute this project utilizing an innovative Construction Manager at Risk (CM@Risk) acquisition approach authorized under Other Transaction Authority (OTA) pursuant to 10 U.S.C. § 2808a.


The Government's in-house USACE Design Team serves as the 100% Designer of Record (DOR) for both projects. The Government will advance the design for project 1 and 2 to an approximate 95% completion level, which will serve as the technical Requirements Package. The objective of this acquisition strategy is to select the single "best-suited" construction partner based on qualifications. The selected partner will collaborate with the USACE in-house DOR during Phase 1 to validate constructability, refine trade pricing, mitigate specialized supply-chain risks, and establish an open-book Guaranteed Maximum Price (GMP) prior to transitioning into Phase 2 physical construction execution.


PROJECT DESCRIPTION AND OBJECTIVES:


Project 1: Renovate Mission Support Center, Building 145


This project involves complete renovation and conversion of roughly 28,000 SF of the 45,236 SF facility into a centralized point for mission support functions for all airman, families, and retirees.


  1. General Demolition & Hazardous Abatement: Wall to wall, as required to implement the new layout and update dated systems. This includes but is not limited to the following: masonry and/or steel-studs walls; flooring, interior doors, and abandoned equipment; water, sewer and venting lines; electrical conductors and panels; HVAC distribution and equipment systems; and exterior doors & windows. All abandoned construction debris and equipment be to be recycled and/or disposed of off-site. Removal and disposal asbestos and other hazardous materials.
  2. Entry Control Vestibules: as required, replace entry/exit flow and ADA compliance, to accommodate fire alarm panels, and to account for any loading/unloading requirements.
  3. Mechanical: Update water lines and PIV to ensure they can independently support the fire suppression system, building conversion, and increased occupant load. Update all restroom plumbing, fixtures, exhaust system, and below grade plumbing, as required to support the new building occupant loads and revised layouts.
  4. Electrical Utility Systems: Update electrical, including subpanels, transformer(s), MDP, and switch gear. Demo existing electrical conductors, conduit, and grounding system on the Power Distribution System as required. Install emergency LED lighting in compliance with UFC 3-600-01.) Demolish interior and exterior lighting and replace with LED lights per UFC 3-530-01. Provide electrical load analysis to ensure maximum flexibility for future system changes.
  5. Civil: Replace/evaluate the exterior utility connections and site conditions. This includes but is not limited to the following: sanitary sewer, water supply, electrical feeds, site lighting, site drainage, and communications. Provide new communications feeds into separate and new COMM rooms. Update parking requirements are needed to serve the new workforce and guest occupant loads. Additional site work, including paving and utilities, is also required.

Project 2: Convert Conference Room to Special Access Facility (SAF), Building 1085


This project provides for the complete architectural, structural, mechanical, electrical, and physical security renovation of approximately 2,660 SF on the second floor of Building 1085 (Area #1) at Minot AFB, North Dakota. The project will convert existing non-compliant spaces into an accredited, modern Special Access Facility (SAF) / Sensitive Compartmented Information Facility (SCIF) with an integrated Entry Control Vestibule, Briefing Room, Projector Room, and secure administrative offices.


The scope of this acquisition includes:


  1. Demolition & Hazardous Abatement: Comprehensive selective demolition of existing interior wall framing, floor finishes, and ceiling systems down to the original structural substrate, along with required asbestos and lead-based paint testing and abatement.
  2. Radio Frequency (RF) Shielding & Acoustics: Application of continuous Radio Frequency (RF) foil barrier shielding across all outside perimeter structural surfaces—including the structural concrete floor, exterior/perimeter walls, and true concrete/corrugated metal ceiling deck. All electrical conduit, junction boxes, and fixtures on RF-treated surfaces must be surface mounted. All perimeter partitions, assemblies, and penetrations must be acoustically engineered and sound-baffled to satisfy Sound Transmission Class (STC) ratings for Top Secret Open Discussion per ICD/ICS 705 and AFGSC standards.
  3. Entry Control Vestibule: Construction of a secure entry control vestibule positioned between the existing restroom entry and Office 225. The vestibule will feature dual acoustical security doors (the outer door incorporating an RF foil barrier), an internal 6-inch step transition to the raised flooring, a visitor sign-in desk, and rough-in infrastructure for security cameras.
  4. Raised Access Flooring & Interior Systems: Installation of a new 6-inch accessible panel raised flooring system throughout the SAF footprint to accommodate concealed under-floor power, signal, and secure telecommunications raceways; new suspended acoustical ceiling systems at a minimum height of 9’-0” AFF; and Structural Interior Design (SID) / Furniture, Fixtures & Equipment (FF&E) integration.
  5. Specialized Mechanical (HVAC) Systems: Provision of a brand-new, self-contained, standalone HVAC system serving exclusively the SAF area, fully compliant with ICD 705 (disconnecting, blanking, and sealing all existing supply/return ducts originating from adjacent building zones). Fresh air intake shall be routed through internal mechanical space and equipped with physical security bars, anti-listening mesh, and acoustic sound baffles. The system will tie into the base Energy Management Control System (EMCS) VLAN. In strict accordance with Minot AFB Roofing Standards, no mechanical equipment, ducting, or penetrations are permitted on the roof; all equipment must be housed internally.
  6. Electrical, Fire Protection & Life Safety: Upgraded electrical service including an updated building one-line electrical diagram complying with NFPA six-switch disconnect requirements; interior LED lighting compliant with UFC 3-530-01; a fully addressable fire alarm system capable of direct, point-to-point reporting to the base D-21 system without the use of intermediate relays; and tie-ins to the building's Mass Notification System (MNS).
  7. Security Infrastructure (IDS / CCTV / Intercom): Complete raceway, electrical rough-in, conduit, and box installations for a new Security Alarm System (Advantor IDS), internal and external surveillance cameras, and intercom speakers. All security wiring will be homerun back to Room 209 for final component integration
  8. Exterior & Installation Compliance: Full compliance with Minot AFB exterior siding, trim, and roofing standards, as well as DoD Minimum Antiterrorism Standards for Buildings (UFC 4-010-01) and applicable Facility-Related Control Systems (FRCS) cybersecurity standards.


PROPOSED ACQUISITION METHODOLOGY AND SCHEDULE, DESIGN STATUS:



To maximize collaboration, schedule speed, cost certainty, and industry innovation while maintaining a firm Construction Cost Limitation, USACE Omaha intends to utilize an Other Transaction (OT) Agreement under the authority of 10 USC 2808a, rather than a traditional FAR-based contract. This collaborative framework will be structured in a multi-phase Construction Management at Risk (CM@Risk) the design is at/near 95% completion:



  • The builder is hired during Phase 1 to act as an expert consultant, helping the Designer of Record (DOR) push the design from 95% to 100% using real-time market data and MII (MCACES 2nd Generation) cost comparisons.
  • Once the design hits 100% and the MII estimate validates the open-book pricing, the agreement transitions to Phase 2, where the builder goes "At-Risk" to construct the facility under a Guaranteed Maximum Price (GMP).
  • The DOR retains design liability, but the contractor drives constructability and assumes responsibility for layout, schedule, and trade coordination.


The Pricing Structure: Pre-Con Fee + Target Fee & GMP


  • Preconstruction Services Fee: A fixed-price amount paid to the contractor strictly to fund their time spent helping the A/E finalize the 95% design into a 100% design.
  • The Target Fee: The contractor’s transparent profit margin for managing the actual construction, bid competitively upfront.
  • The GMP: The absolute ceiling for the construction phase (Validated Direct Costs + Target Fee + Shared Contingency).

PHASED EXECUTION PLAN


Phase 1: Preconstruction Services Agreement (CM@Risk Advisory)



  • Solicitation (White Papers): The Solicitation would likely include the 95% design. The Deliverable is anticipated to be a concise 5-to-10 page White Paper. Evaluation Criteria will likely include corporate capability and CM@Risk past performance; preconstruction approach (how the firm plans to collaborate with the Government's A/E to close the remaining 5% design gap, identify value-engineering opportunities, and mitigate supply-chain risks); proposed Target Fee (for construction) and Preconstruction Services Fee.
  • The Pitch Meeting (Oral Presentations): A 90-minute pitch where the contractor must bring their Project Manager, Site Superintendent, and their Preconstruction Manager. The Government team assesses how well the contractor's team will integrate with the A/E during the critical final design push. The OT will initially be awarded and funded only for the Preconstruction Services Fee.
  • Design Finalization (Bridging the 5% Gap): The contractor’s Preconstruction team sits with the Government and the DOR. Because the design is not locked, they can actively change it. They perform value engineering, finalize equipment selections, and ensure the drawings are 100% constructible.
  • Open Book Pricing vs. MII: As the design reaches 100%, the contractor conducts open-book market outreach. The Government and contractor review actual sub-bids together. USACE cost estimators finalize the Independent Government Estimate (IGE) using the MII software to validate costs and establish the GMP base.



Phase 2: Construction Execution Agreement (Going "At-Risk")


  • Execution: The Agreements Officer (AO) executes a bilateral modification to the OT Agreement, incorporating the GMP and funding the physical construction.
  • Risk Allocation: Under CM@Risk, the contractor is now "At-Risk." While the DOR still owns fundamental engineering failures, the contractor loses the ability to claim "defective design" for constructability issues, material delays, or coordination errors, because they were explicitly paid to help finalize those exact decisions using market and MII data during Phase 1.


REQUIRED INFORMATION TO BE SUBMITTED IN RESPONSE TO THIS NOTICE:


  1. Company Name, address, phone number, point of contract, email, web address:


  1. CAGE Code and Unique Entity Identifier (UEI), if available:


  1. Single and aggregate bonding levels:


  1. Current CMMC level reported in SPRS (if applicable):


SUBMISSION REQUIREMENTS:


  1. What standard industry administrative practices, terms, or conditions should the Government adopt within this OTA to make it highly effective for a CM@Risk project?


  1. What are the most critical market constraints you currently anticipate for this scope of work (e.g., labor shortages, material lead times, equipment availability, specialized trade capacity?


  1. Provide 2–3 examples of projects completed in the last 10 years that involve new construction and/or major renovation on an active DoD installation. For each project, specify its final construction cost and the acquisition method used.


  1. Describe your experience working in and around mission-critical, semi-occupied facilities. What specific measures does your firm implement to ensure zero disruption to ongoing client operations?


  1. Provide any feedback, concerns, or recommendations your company has regarding the Government’s proposed hybrid approach (utilizing OTA authority to execute a CM@Risk for this project.



Other Transaction Authority (OTA) & Statutory Compliance:


  • Innovative Technologies: Describe any innovative materials, methods, or technologies your firm could propose for a project of this scale that could lead to cost savings, schedule acceleration, or enhanced facility performance and resilience.


  • Barriers to Innovation: What commercial or Government-imposed barriers currently make it difficult to propose or implement innovative construction technologies? How could the flexibility of an OTA help overcome these barriers?


 CM@Risk & Design-Assist Involvement:



  • 95% Design Entry: The Government plans to bring the CM@Risk contractor on board when the design is at 95%. Based on your experience, is a 5% design gap sufficient to add meaningful constructability and value-engineering input, or are the most critical decisions already locked in?


  • Collaborative Framework: What collaborative mechanisms do you recommend the Government implement to rapidly close the 5% design gap and transition to a validated GMP?



  • Describe your experience executing Construction Manager at Risk (CM@Risk) or other highly collaborative delivery methods, particularly where you served as a consultant before going "at-risk".


Guaranteed Maximum Price (GMP), Risk Allocation & Compensation:



  • Preconstruction Compensation: What specific compensation structures (e.g., fixed stipends, time-and-materials) would best compensate your firm for the pre-construction effort and design-assist phase?


  • Open Book Pricing: How do you approach "open-book" pricing and transparency during Phase 1 to build trust and ensure the Government is receiving fair market value before locking in the GMP?



  • Phase 1 Off-Ramp Risk: If the Government and the contractor cannot reach an agreement on the final GMP, what specific off-ramp conditions are critical to your firm?



 Teaming & Subcontractor Integration:



  • Under a CM@Risk model starting at a 95% design, how and when do you plan to on-board your critical subcontractors (e.g., structural steel, MEP, fire protection)?


  • Will you compete these subcontracts openly during Phase 1 to build the open-book GMP, or do you prefer bringing in established partners from day one?




 Feedback on the Acquisition Strategy & Alternatives:



  • Would your organization be interested in competing for a single, consolidated Other Transaction Authority (OTA) agreement that incorporates Project 1 and Project 2 as distinct scopes of work at the same installation? Please identify any anticipated benefits, risks, or challenges associated with consolidating these requirements under one OTA.


  • Does the proposed CM@Risk-OTA strategy incentivize your firm to participate? Why or why not?



  • Are there alternative acquisition strategies, phasing approaches, or commercial practices the Government has not considered that would result in a more efficient process, faster delivery, or lower cost?



COMMENTS:



Provide comments or identify any concerns your company has regarding the planned approach. Note that the Government will not be responding to inquiries about the action at this time. Your responses and comments will be used by Government personnel to assess the viability and scope of the proposed approach and will be kept in the strictest confidence. Telephone inquiries will not be accepted.




ACRONYMS AND DEFINITIONS:




    • CUI (Controlled Unclassified Information): Information that requires safeguarding or dissemination controls pursuant to and consistent with applicable law, regulations, and government-wide policies, but is not classified under Executive Order 13526 or the Atomic Energy Act, as amended.
      • GMP (Guaranteed Maximum Price): A pricing structure commonly used in Progressive Design-Build where the parties collaboratively develop the design, scope, and pricing prior to establishing a final construction price. Once negotiated and incorporated into the Agreement through a modification, the GMP functions as a Firm-Fixed-Price (FFP) commitment for the defined scope of work. The Design-Builder assumes the risk for completing the work within the negotiated GMP and is generally responsible for cost overruns, except for Government-directed changes, differing site conditions, or other authorized modifications that formally adjust the GMP.
      • ICD/ICS (Intelligence Community Directive/Intelligence Community Standard): A system of policy documents that govern the U.S. Intelligence Community. ICD/ICS 705 specifically provides the standards for the secure design, construction, and operation of Sensitive Compartmented Information Facilities (SCIFs).
      • Off-Ramp: Refers to a contractual mechanism that allows the Government to discontinue the Progressive Design-Build relationship if a fair and reasonable GMP or FFP for construction cannot be achieved. Upon off-ramp, the Government retains rights to the completed design to continue the project through another delivery method or design-builder.
      • OT (Other Transaction) Agreement: A legally binding instrument other than a standard contract, grant, or cooperative agreement. OTs are not subject to the Federal Acquisition Regulation (FAR) and provide significant flexibility in tailoring the procurement process and terms to the needs of a project.


      • Construction Manager at Risk (CM@Risk): Integrated project delivery method where the owner contracts a construction manager to provide advisory, estimating, and scheduling services during the design phase and then act as the general contractor during construction. Under this model, the construction manager commits to delivering the project within a Guaranteed Maximum Price (GMP), legally assuming the financial risk for any allowable cost overruns beyond that established ceiling.


      • SAM (System for Award Management): The official U.S. government website where all entities must be registered to do business with the federal government.
      • SCIF (Sensitive Compartmented Information Facility): An accredited area, room, group of rooms, or installation where sensitive, compartmented information (SCI) may be stored, used, discussed, and/or electronically processed.
      • UEI (Unique Entity Identifier): The 12-character alphanumeric identifier assigned to all entities (public and private companies, individuals, institutions, or organizations) who register to do business with the federal government in the System for Award Management (SAM).
      • USACE (U.S. Army Corps of Engineers): The federal agency, acting as the engineering and construction agent for the Department of Defense, responsible for managing this solicitation and the resulting OT.


Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is for the repair and modernization of the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The project scope is comprehensive, involving selective demolition, building envelope and roofing repairs, interior reconfiguration, and the installation of new finishes. Critical infrastructure upgrades include new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, and updated electrical distribution, lighting, and building automation controls. Additionally, the project requires site improvements such as paving removal and replacement, drainage upgrades, and hazardous materials abatement. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price, with evaluation focused on two primary exhibit line items: building renovation and paving work. Proposals are due by November 23, 2026. Depending on the proposal value, contractors may be required to provide bid, payment, and performance bonds, with bid bonds set at 20 percent of the proposal amount. The work must adhere to the Davis-Bacon Act, the Buy American statute, and ADA accessibility guidelines. Invoicing is processed monthly via Wide Area Work Flow (WAWF) and requires extensive supporting documentation, including certified payrolls and updated construction schedules.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 9 days
View Details
NAICS: 236220
New
SLED
Modify Transfer Facility NBK Bangor
Solicitation # N44255-25-R-1502
Solicitation N44255-25-R-1502 is a firm-fixed-price design-build contract for the renovation and modernization of Transfer Facility Building 6594 at Naval Base Kitsap Bangor, Washington. With an estimated magnitude between 10 million and 25 million dollars, the project involves comprehensive upgrades to the exterior enclosure, roof, plumbing, electrical, HVAC, and fire protection systems, as well as the construction of a 400 square foot addition for forklift battery charging. A critical requirement of the project is a two-phase execution strategy that ensures the facility remains operational and mission-capable between phases, necessitating multiple mobilization and demobilization cycles. Phase 1 encompasses the primary design for both phases and initial construction, while Phase 2 focuses on the installation of new building equipment, including a prefabricated paint booth and the replacement of a 40-ton bridge crane. The contract mandates strict adherence to NAVFAC, UFC, and IBC standards, alongside rigorous cybersecurity and environmental compliance, including Puget Sound Clean Air Agency regulations. Performance timelines require work to commence within 15 calendar days of award, with the base bid completion due within 360 calendar days and an optional seismic upgrade component due within 1082 calendar days. Liquidated damages are set at 4,137 dollars per day for the base bid and 280 dollars per day for the option. Proposals must be submitted via the PIEE portal by December 7, 2026, and include a completed schedule of prices and an executed bid bond. Award will be based on the proposal determined to be most advantageous to the government, with payments processed through the Wide Area WorkFlow system.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 21 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is seeking pricing for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site work is required, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves architectural repairs such as drywall replacement, painting, ceiling tile and flooring installation, rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets to restore the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified entities. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory pre-bid site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act, NFPA-101 life safety codes, ADA, OSHA, and EPA regulations. Payment terms are Net 30, and the contractor must name Adams and Associates, Inc. as an additional insured on their automobile liability policy.
Grafton Job Corps

POSTED

about 4 hours ago

DEADLINE

in 3 days
View Details
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged interior spaces to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as mechanical rooms and common areas. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in utility rooms and hallways, along with the temporary disconnection and re-installation of HVAC equipment, water heaters, and furnaces. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of liability and worker's compensation insurance, within ten days of award. Proposals must include detailed relevant experience, a comprehensive work plan addressing project phasing and occupied-building protection, and itemized pricing by room and trade. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 4 hours ago

DEADLINE

in 6 days
View Details

More opportunities from Department Of Defense → W071 Endist Omaha

Same awarding agency

NAICS: 236220
New
Federal
High Temp Hot Water Distribution System and Heat Plant Suite of Repairs to the US Air Force Academy COLORADO
Solicitation # W9128F27SM003
The U.S. Army Corps of Engineers is conducting market research via a Sources Sought Notice for a suite of repairs to the High-Temperature Hot Water (HTHW) Distribution System and Heat Plant at the United States Air Force Academy in Colorado Springs, Colorado. The project scope includes the safe abatement and replacement of asbestos-containing insulation on HTHW piping within Cadet Area Utility Tunnels, structural repairs to corroded pipe supports, and a complete overhaul of failing tunnel subdrainage and pump discharge networks. The government is evaluating a Multiple Award Design-Build model utilizing Other Transaction Agreements, with an anticipated performance period of three to five years and funding through annual Organizational and Maintenance (O&M) accounts. The government is seeking firms with proven experience in managing complex, phased mechanical construction within operational facilities and licensed expertise in high-temperature, confined-space asbestos abatement. Interested parties must demonstrate a bonding capacity of up to 45 million dollars for a single project and 95 million dollars in aggregate. Responses must be submitted as a capability narrative not exceeding five pages, including company profiles, entity identifiers, bonding thresholds, and representative project examples, by December 14, 2026. This notice is for market intelligence purposes and does not constitute a formal request for proposal or invitation for bids.
Commercial and Institutional Building Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details
NAICS: 237990
New
Federal
LOWER BRULE NORTH SHORELINE STABILIZATION AND ECOSYSTEM RESTORATION, ELEMENT 2
Solicitation # W9128F27BA007
Solicitation W9128F27BA007 is a firm-fixed-price construction project for the Lower Brule North Shoreline Stabilization and Ecosystem Restoration, Element 2, located along the bank of Lake Sharpe near Lower Brule, South Dakota. Managed by the U.S. Army Engineer District, Omaha, this 100% Small Business Set-Aside under NAICS 237990 has an estimated construction value between $10 million and $25 million. The scope of work focuses on erosion control and habitat creation, including the construction of a 200-by-1,500-foot island in shallow water, the installation of a 100-foot-wide riparian planting bench, a riprap revetment for shoreline protection, and a gravel maintenance path. These efforts are designed to develop approximately 5.17 acres of emergent wetland and 32 acres of riparian habitat through extensive earth moving, grading, and rock installation. The project has a performance period of 550 days, with an estimated start date of January 1, 2027, and requires work to commence within 10 calendar days of the notice to proceed. Bids are evaluated based on price and price-related factors and must be submitted via the PIEE Solicitation Module. Key technical requirements include adherence to the Davis-Bacon Act, Buy American statutes, and specific quality standards for concrete and stone protection. The bid schedule consists of 11 line items covering mobilization, breakwater structures, riprap, excavation, and topsoil placement, with a specific note regarding a 4.5% Tribal Employment Rights Ordinance tax. Inspection and acceptance will occur at the destination, specifically the COE Big Bend Project Office in Fort Thompson, South Dakota.
Other Heavy and Civil Engineering Construction

POSTED

2 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS