Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Lift Station 55-12 and 81-07 Odor Control Upgrade Project

Forecast
forecast_79e08599-c104-4135-ae1b-64f69f763c43State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Coachella Valley Water District

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A

Full Description

Show more
The purpose of the Lift Station 55-12 and Lift Station 81-07 Upgrade Project (Project) is to replace the chemical odor scrubbers (beds) at both lift stations. Lift Station 55-12 is located at 78755 Jefferson Street in the City of La Quinta, LS 81-07 is located at 80860 Avenue 42, in the City of Indio. The lift stations are more than sixteen years old and currently have deteriorated chemical odor scrubbers and delaminated wet well liners. The proposed improvements include replacing (2) odor beds with the same flow capacity and dimensions at 14' (Length) x 8' (Width) x 9' (Depth). The odor beds will have biological treatment with engineering inorganic material media and a spray-on liner, followed by activated carbon polishing. Foul odors will be drawn from the wet well using a duct fan and forced through a biological treatment with wood chips. The benefit of the biological treatment is the elimination of the chemical use at both sites. In addition, biological treatment is more efficient at eliminating odors. The upgrades to the existing Lift Station 55-12 and 81-07 facilities are anticipated to begin in or around February of 2026 and will take place over 365 calendar days. The surrounding land uses consist of residential, farmland, open space and roadways. The existing lift stations will continue to convey wastewater while the upgrades are under construction causing no disruptions in services. The Project is not located within or adjacent to a conservation area associated with the Coachella Valley Multiple Species Habitat Conservation Plan (CVMSHCP). The sites are not subject to the CVMSHCP development mitigation fee because the sites are previously developed.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
RFP2026-015 Ingleside on the Bay Drainage Improvements
Solicitation # RFP2026-015
San Patricio County is soliciting sealed bids for the Ingleside on the Bay Drainage Improvements Project (RFP2026-015) in Ingleside, Texas. The scope of work includes ditch cleaning and reshaping, storm sewer cleaning, storm pipe installation and replacement, and the installation of storm inlets. Additionally, the project involves the full-depth reconstruction of several street segments—specifically Parkview Place, Live Oak Street, and Bayshore Drive/Court—using flexible asphalt pavement sections, as well as the installation of wastewater force mains. Key technical requirements include the use of RC Pipe (Class IV) in various diameters, adherence to AASHTO pavement design guides, and a minimum 95% maximum dry density for shoulder material compaction. The contract will be awarded to the responsive and responsible bidder providing the lowest or best bid. Bidders must submit a statement of qualifications and a proposed calendar day schedule, as shorter schedules are preferred. Bids are due by 2:00 PM on December 16, 2026, and can be submitted electronically via the County's eBidding platform or physically with a thumb drive. For contracts exceeding $100,000, a bid bond of 5 percent is required, along with performance and payment bonds. The project is subject to Davis-Bacon prevailing wage rates, the Contract Work Hours and Safety Standards Act, and various federal non-discrimination and labor regulations. There is no specified set-aside status for this solicitation.
San Patricio County

POSTED

about 10 hours ago

DEADLINE

in 26 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS